TenderDekho Logo
GEM

Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited CLINKR GRINDR ASSEMBLY MB/SP18D005 9 Tender Lucknow UP 2026

Bid Publish Date

03-Jul-2026, 12:57 pm

Bid End Date

13-Jul-2026, 4:00 pm

Progress

Issue03-Jul-2026, 12:57 pm
AwardPending
Explore all 6 tabs to view complete tender details

Quantity

1

Bid Type

Single Packet Bid

Key Highlights

  • Critical quantity variation right: up to 25% increase/decrease at contract and during currency
  • Delivery schedule tied to last date of original delivery order with formula-based extensions
  • ATC document attached; review for additional compliance and warranty expectations
  • BOQ shows 0 items; implies a specialized or phased procurement approach
  • Organization/Location: UPRVUNL, Lucknow, Uttar Pradesh
  • Product: CLINKR GRINDR ASSEMBLY MB/SP18D005 9; specific technical compatibility implied

Tender Overview

Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited (UPRVUNL), Lucknow, invites bids for the CLINKR GRINDR ASSEMBLY MB/SP18D005 9 under the Uttar Pradesh Energy Department. The BOQ reports 0 items, signaling a highly scoped or reissued requirement with undefined quantity. The tender introduces an option clause allowing up to 25% quantity variation at contracted rates, and a dynamic delivery timeline tied to the last original delivery date. Bidders should prepare for potential quantity adjustments and extended delivery windows, with compliance to the option-based scheduling framework. This notice lacks start/end dates and an estimated value, highlighting a possible re-tendering or internal alignment stage.

  • Organization: UPRVUNL, Lucknow
  • Product Category: CLINKR GRINDR ASSEMBLY MB/SP18D005 9
  • Location: Lucknow, Uttar Pradesh
  • Key differentiator: 25% bid/contract quantity flexibility with milestone-based delivery calculations
  • Unique aspect: ATC-attached terms and a non-standard BOQ indicating a specific hardware assembly requirement

Technical Specifications & Requirements

  • No explicit technical specs listed; bidders should assume integration-ready GRINDR ASSEMBLY MB/SP18D005-9 with standard mechanical mounting, electrical connection, and compatibility with existing plant infrastructure
  • Clause indicates delivery terms extendable via the option clause: initial delivery period then additional time computed as (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days
  • Delivery schedule logic ties to the original delivery date and extended period; bidders must price for potential schedule shifts
  • ATC document exists; bidders should review for any additional compliance steps, warranty expectations, or quality assurances indicated therein
  • Emphasis on compliance with organization’s internal procurement standards and safety procedures for energy infrastructure equipment

Terms, Conditions & Eligibility

  • Option Clause permits up to 25% quantity variation at contract; extension of delivery time may follow the same ratio, with minimum 30 days
  • Delivery period commencement references the last date of original delivery order; extension follows extended period calculations
  • Bidders must comply with the purchaser’s option clause and associated scheduling adjustments
  • No explicit EMD, warranty, or payment terms disclosed in available data; bidders should seek ATC document for additional conditions
  • Review ATC and any attached supplier qualification criteria to confirm eligibility and submission requirements
  • Ensure readiness to adhere to internal control checks for energy-sector equipment assemblies

Key Specifications

  • Product/service names: CLINKR GRINDR ASSEMBLY MB/SP18D005 9

  • Quantity/scale: not specified in BOQ (0 items); potential 25% quantity variation

  • Estimated value: not disclosed

  • Experience: prior hardware assemblies in energy infrastructure recommended

  • Quality/standards: refer to ATC for any ISI/ISO-like standards (not specified in data)

Terms & Conditions

  • 25% quantity variation rights at contract and during currency

  • Delivery period calculations based on original delivery date with minimum 30 days

  • ATC document attached; review for additional terms and conditions

Important Clauses

Payment Terms

Not specified in available data; check ATC for payment schedule and milestone payments

Delivery Schedule

Delivery period starts from last date of original delivery order; extensions follow the option clause formula

Penalties/Liquidated Damages

Not detailed in provided data; verify in ATC terms and conditions

Bidder Eligibility

  • Eligibility for procurement of energy infrastructure hardware in Uttar Pradesh

  • Demonstrated experience in supplying mechanical assemblies for power plants

  • Compliance with GST, PAN, and financial viability requirements as per terms

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

CLINKR GRINDR ASSY MB/SP18D005 9

Payment Timelines

Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

30

Delivery Locations

1

Delivery Cities

Sonbhadra

Delivery Pincodes

231225

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
ADALAT VERMA231225,DTPS, Anpara Thermal Power PlantSonbhadraUttar Pradesh231225130-

Authority Records

ENERGY DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9543953.pdf

Main Document

Other Documents

OTHER

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

CLINKER GRINDER-100257749_ M5657106000

Ntpc Limited

SONBHADRA, UTTAR PRADESH

Posted: 9 June 2025
Closed: 2 July 2025
GEM

Clinker grinder-100263522_ M5657606000N

Ntpc Limited

RAEBARELI, UTTAR PRADESH

Posted: 14 October 2025
Closed: 4 November 2025
GEM

CLINKER GRINDER-100266180_ M5657701209

Ntpc Limited

RAEBARELI, UTTAR PRADESH

Posted: 18 November 2025
Closed: 10 December 2025
GEM

ITEM_ 10_ M8614374082_ 100252011_ clinker grinder

Ntpc Limited

SONBHADRA, UTTAR PRADESH

Posted: 13 February 2025
Closed: 18 April 2025
GEM

NTPC Limited Clinker Grinder Spare Parts Tender Visakhapatnam Andhra Pradesh 2026 - ISI/EC Eligible Vendors

Ntpc Limited

VISAKHAPATNAM, ANDHRA PRADESH

Posted: 17 March 2026
Closed: 7 April 2026
GEM

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

- GST registration certificate

2

- PAN card

3

- Experience certificates for similar assemblies in power/energy sector

4

- Financial statements (last 2-3 years)

5

- EMD/Security deposit documentation (amount not specified in data; verify at ATC)

6

- Technical bid documents and OEM authorizations (if applicable)

7

- Any ATC-specific compliance certificates referenced in the ATC document

Frequently Asked Questions

Key insights about UTTAR PRADESH tender market

How to bid for CLINKR GRINDR assembly tender in Lucknow 2026?

Bidders must review the ATC document, submit GST/PAN, provide experience certificates for similar energy assemblies, and comply with the option clause allowing up to 25% quantity variation. Include any OEM authorizations and financial statements; anticipate reviewing the delivery extension formula and ATC-specified terms before submission.

What documents are required for UPRVUNL energy equipment tender in UP?

Submit GST certificate, PAN card, 2-3 years financial statements, experience certificates for similar assemblies, EMD documentation, technical bid, and OEM authorizations if applicable. Ensure ATC references are included; verify any location-specific submission rules in Lucknow, Uttar Pradesh.

What are the delivery terms for the 25% quantity option in UP tender?

Delivery starts from the last date of the original order; if quantity increases, extended time is calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days. The purchaser may extend up to the original delivery period under the option clause.

Which standards or certifications are required for this UPRVUNL bid?

The tender references an ATC document; bidders should verify ISI/ISO-like certifications specified there. Ensure product compatibility with energy infrastructure standards and obtain OEM authorizations if needed, as indicated in the ATC terms.

What is the estimated value and BOQ details for this Lucknow tender?

The BOQ shows 0 items and no estimated value in the available data. Bidders should consult the ATC for any revised quantity estimates, financial ceilings, or staged procurement plan associated with the CLINKR GRINDR ASSEMBLY MB/SP18D005 9.

How to check eligibility criteria for the CLINKR GRINDR tender 2026?

Review the ATC terms, provide prior experience in similar energy-sector assemblies, ensure GST/PAN compliance, submit financial viability, and confirm capability to meet the 25% quantity variation and delivery-extension provisions described in the option clause.

What are the payment terms for UPRVUNL supply contracts in UP?

Specific payment terms are not disclosed in the data; bidders should verify in the ATC document. Typical terms may include milestone payments or post-delivery payments, alongside compliance with GST and statutory deductions, once the contract is awarded and delivery milestones are verified.

What documents are needed to participate in the Lucknow energy tender?

Prepare GST, PAN, vendor experience certificates for mechanical assemblies, financial statements, EMD documentation, technical bid, OEM authorizations if required, and the ATC-specified compliance certificates; ensure submission aligns with Lucknow-based procurement guidelines.

Similar Tenders

5 found
Urgent

2' X 3' Clinker Grinder without Drive Arrangement. Assembly No - A-553-R,2' X 3' Clinker Grinder wi

Damodar Valley Corporation

📍 KODERMA, JHARKHAND

⏰ Deadline: 1 day left
🛒 Type: Goods
View GEM

Open Tender for Procurement of Feed sump (Bifurcating chute) of clinker grinder with installation along with consumables for AHP-IV, STPS, Sarni. in BETUL, MADHYA PRADESH

Madhya Pradesh Power Generating Company Limited

📍 BETUL, MADHYA PRADESH

EMD: ₹29,100
Est: ₹14.5 L
⏰ Deadline: 4 weeks left
🛒 Type: Goods
View EPROCURE

Supply of clinker grinder chain, sprockets and inspection window

📍 TELANGANA

Est: ₹1.7 Cr
⏰ Deadline: 2 weeks left
🛒 Type: Goods
View EPROCURE-TELANGANA

Bids are Invited For SUPPLY OF 5000 MT CLINKER ON FOR CEMENT GRINDING UNIT, PALLIPPURAM, CHERTHALA, ALAPPUZHA DIST, KERALA in PALAKKAD, KERALA

Malabar Cements Ltd

📍 PALAKKAD, KERALA

EMD: ₹2.2 L
⏰ Deadline: 4 weeks left
🛒 Type: Goods
View EPROCURE

Bids are Invited For Work contract for reclamation of worn-out teeth and shaft of driving and driven rollers of clinker grinders of AHP of Unit 1 and 2 at 2x600 MW, SSTPP, MPPGCL, Dongalia. in EAST NIMAR, MADHYA PRADESH

Madhya Pradesh Power Generating Company Limited

📍 EAST NIMAR, MADHYA PRADESH

EMD: ₹12,600
Est: ₹6.3 L
⏰ Deadline: 3 weeks left
🛒 Type: Works
View EPROCURE