TenderDekho Logo
GEM

Tender Notice for CRANK SHAFT ASSLY,OIL FILLER,GASKET Part No 24 462 440 00,WASHER SPRING,WASHER SPRING,STUD STD T,V in CHITTORGARH, RAJASTHAN

Bid Publish Date

06-Mar-2025, 4:20 pm

Bid End Date

28-Mar-2025, 11:00 am

EMD

₹537

Progress

Issue06-Mar-2025, 4:20 pm
Technical27-03-2025 21:51:10
AwardPending
Explore all 5 tabs to view complete tender details

Quantity

1605

Bid Type

Two Packet Bid

Categories 46

A tender has been published for Nuclear Power Corporation Of India Limited CRANK SHAFT ASSLY, OIL FILLER, GASKET Part No 24 462 440 00, WASHER SPRING, STUD STD T, V BELT, GASKET FOR REAR COVER, PULLEY FAN DRIVING, OIL SEAL, BEARING ROLLER, CIRCLIP INTERNAL, SCREW HEX STD, PLUG MAGNETIC, WASHER 3, NUT HEX, BEARING NEEDLE ROLLR, SPACER SINGLE EDGE, GASKET FOR FRONT COVER, CIRCLIP INTERNAL TYPE B, BEARING BALL JOURNAL, ROD CONNECTING 4 STAGE, ROD CONNECTING I by IV STAGE, GASKET FOR OIL FILTER, SPACER RING, NIPPLE PIPE ONE SIDE THREAD, NUT HEX M20X2by5, WASHER PLAIN STEEL, CYLINDER 128D, CYLINDER AND LINER ASSLY 35D, SUCTION VALVE II STAGE, DELIVERY VALVE II STAGE, SUCTION VALVE FOURTH STAGE, DISCHARGE VALVE IV STAGE SIZE, RING No 330, RING 4TH ST VALVES, BELL FOR IV STAGE SUCTION, RING No 334, CYLINDER HEAD IV STAGE, RING, BELL FOR IV STAGE DELIVERY, PISTON IV STAGE, COMPRESSION RING 4 TH STAGE, NUT FIXING M75X1 by 5 I AND IV AND I, PAD FOR PISTON IV AND V STAGE, Pin Gudgeon, PLUG M6X1 FOR III, PISTON I STAGE CIRCLIP, RING PISTON COMPRESSION II STAGE, RING OIL SCRAPING, GASKET Part No 24 441 240 00, GASKET Part No 24 462 000 00, WASHER SPRING ID 14 point 2 X THK 3, STUD STD TYPE B M12X1 point 75X35L, NUT HEXAGONAL M 12 X 1 point 75 P, WASHER, RING 99X62X1, GASKET 90SQX71X1, RING No 856, RING Part No 24 430 182 00, RING No 331 Part No 24 430 251 00, RING No 330 Part No 24 430 260 00, RING Part No 24 430 421 00, PIN GUDGEON, CYLINDER III STAGE 65D, PISTON II STAGE AND III STAGE, GASKET Part No 8047 10 41 00, COMPRESSION RING 3 RD STAGE, STUD STD TYPE B M10X1 point 5X50L, NUT HEX M10X1 point 5P, WASHER SPRING ID 10 point 2 X THK 2 point 2, WASHER SPRING ID 14 point 2 X THK, ROD CONNECTING II III STAGE, SUCTION VALVE THIRD STAGE SIZE 52RN, DISCHARGE VALVE III STAGE SIZE 52RN, WASHER Part No 23 560 203 00, PRESSURE SAFETY VALVE FIRST, PRESSURE SAFETY VALVE SECOND, PRESSURE SAFETY VALVE THIRD, SAFETY VALVE FOURTH STAGE SET, COOLING PACKAGE I, S A FILTER SUCTION, HOSE BEND SUCTION FILTER 90 DEG 114, CLAMP HOSE ID 125 TO 145, PULLEY 2GROOVES, MECHANICAL LUBRICATOR, V BELT A71, WASHER SPRING ID12 point 2X2 point 5 mm, FELT SEAL SQ 8MMX200L, BRG BALL DEEP GR, ADAPTOR SLEEVE ASSEMBLY, PLUMMER BLOCK DIA 75, SCREW HEX STD M20X2 point 5X90L, V BELT SPACE SAVER SPC 3550, AUTO DRAIN VALVE 2 by 2WAY, AUTO DRAIN VALVE 2 by 2 WAY, AUTO DRAIN VALVE 3 by 2WAY, AUTO DRAIN VALVE 2by2WAY NC 24VDC, ALERT LUB LISCREW, SCREW HEX STD M8 X 1 point 25 X 20L, STUD STD TYPE B M10X1point5X55L, NUT HEX M10X1point5P, GASKET 66 SQX1MM FOR FAN HUB, BEARING BALL, RING FELT 47 DIA X 32 DIA X 10, WASHER LOCK FOR FAN AXLE, FLYWHEEL 2 GROOVES 660point4 PCD, PULLEY MOTOR 2 GROOVES 620 RPM, FAN FOR AIR COOLER ITEM No 94 111 337 00, LOCKING PLATE FOR MOTOR PULLEY, DRIVE SHAFT ASSLY, CAM SHAFT ASSLY, PUMPING ELEMENT in CHITTORGARH, RAJASTHAN. Quantity: 1605 by. Submission Deadline: 28-03-2025 11: 00: 00. Check eligibility and apply.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

CRANK SHAFT ASSLY , OIL FILLER , GASKET Part No 24 462 440 00 , WASHER SPRING , STUD STD T , V BELT , GASKET FOR REAR COVER , PULLEY FAN DRIVING , OIL SEAL , BEARING ROLLER , CIRCLIP INTERNAL , SCREW HEX STD , PLUG MAGNETIC , WASHER 3 , NUT HEX , BEARING NEEDLE ROLLR , SPACER SINGLE EDGE , GASKET FOR FRONT COVER , CIRCLIP INTERNAL TYPE B , BEARING BALL JOURNAL , ROD CONNECTING 4 STAGE , ROD CONNECTING I by IV STAGE , GASKET FOR OIL FILTER , SPACER RING , NIPPLE PIPE ONE SIDE THREAD , NUT HEX M20X2by5 , WASHER PLAIN STEEL , CYLINDER 128D , CYLINDER AND LINER ASSLY 35D , SUCTION VALVE II STAGE , DELIVERY VALVE II STAGE , SUCTION VALVE FOURTH STAGE , DISCHARGE VALVE IV STAGE SIZE , RING No 330 , RING 4TH ST VALVES , BELL FOR IV STAGE SUCTION , RING No 334 , CYLINDER HEAD IV STAGE , RING , BELL FOR IV STAGE DELIVERY , PISTON IV STAGE , COMPRESSION RING 4 TH STAGE , NUT FIXING M75X1 by 5 I AND IV AND I , PAD FOR PISTON IV AND V STAGE , Pin Gudgeon , PLUG M6X1 FOR III , PISTON I STAGE CIRCLIP , RING PISTON COMPRESSION II STAGE , RING OIL SCRAPING , GASKET Part No 24 441 240 00 , GASKET Part No 24 462 000 00 , WASHER SPRING ID 14 point 2 X THK 3 , STUD STD TYPE B M12X1 point 75X35L , NUT HEXAGONAL M 12 X 1 point 75 P , WASHER , RING 99X62X1 , GASKET 90SQX71X1 , RING No 856 , RING Part No 24 430 182 00 , RING No 331 Part No 24 430 251 00 , RING No 330 Part No 24 430 260 00 , RING Part No 24 430 421 00 , PIN GUDGEON , CYLINDER III STAGE 65D , PISTON II STAGE AND III STAGE , GASKET Part No 8047 10 41 00 , COMPRESSION RING 3 RD STAGE , STUD STD TYPE B M10X1 point 5X50L , NUT HEX M10X1 point 5P , WASHER SPRING ID 10 point 2 X THK 2 point 2 , WASHER SPRING ID 14 point 2 X THK , ROD CONNECTING II III STAGE , SUCTION VALVE THIRD STAGE SIZE 52RN , DISCHARGE VALVE III STAGE SIZE 52RN , WASHER Part No 23 560 203 00 , PRESSURE SAFETY VALVE FIRST , PRESSURE SAFETY VALVE SECOND , PRESSURE SAFETY VALVE THIRD , SAFETY VALVE FOURTH STAGE SET , COOLING PACKAGE I , S A FILTER SUCTION , HOSE BEND SUCTION FILTER 90 DEG 114 , CLAMP HOSE ID 125 TO 145 , PULLEY 2GROOVES , MECHANICAL LUBRICATOR , V BELT A71 , WASHER SPRING ID12 point 2X2 point 5 mm , FELT SEAL SQ 8MMX200L , BRG BALL DEEP GR , ADAPTOR SLEEVE ASSEMBLY , PLUMMER BLOCK DIA 75 , SCREW HEX STD M20X2 point 5X90L , V BELT SPACE SAVER SPC 3550 , AUTO DRAIN VALVE 2 by 2WAY , AUTO DRAIN VALVE 2 by 2 WAY , AUTO DRAIN VALVE 3 by 2WAY , AUTO DRAIN VALVE 2by2WAY NC 24VDC , ALERT LUB LISCREW , SCREW HEX STD M8 X 1 point 25 X 20L , STUD STD TYPE B M10X1point5X55L , NUT HEX M10X1point5P , GASKET 66 SQX1MM FOR FAN HUB , BEARING BALL , RING FELT 47 DIA X 32 DIA X 10 , WASHER LOCK FOR FAN AXLE , FLYWHEEL 2 GROOVES 660point4 PCD , PULLEY MOTOR 2 GROOVES 620 RPM , FAN FOR AIR COOLER ITEM No 94 111 337 00 , LOCKING PLATE FOR MOTOR PULLEY , DRIVE SHAFT ASSLY , CAM SHAFT ASSLY , PUMPING ELEMENT

Authority Records

DEPARTMENT OF ATOMIC ENERGY
Free Trial Available

Win more tenders with
real-time intelligence

Trusted by 5,000+ companies to find, track, and win government tenders.

Smart Alerts
Daily matched tenders to your inbox
Bid Results
See L1 winners & actual prices paid
Competitor Intel
Track rival companies & win patterns
Price Intelligence
BOQ rate trends to benchmark your bid
Book a Free Demo

See TenderDekho in action

Our team will walk you through the platform and help set up your profile — free, no commitment.

Callback within 24 hrs No credit card needed

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-7451267.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

SINGLE ROW DEEP GROOVE BALL BEARING,GEAR RIM,HOSE 5062 L340MM,HOSE L180MM,HOSE 650MM,SEALING RING,S

Indian Air Force

Posted: 25 August 2025
Closed: 4 September 2025
GEM

ADJUSTABLE SCREW,VALVE SPRING OUTER,PUSH ROD,V BELT A 43 YWA ELECT ST,SET OF HOSES,VALVE COTTER,VAL

Indian Air Force

Posted: 12 January 2026
Closed: 22 January 2026
GEM

Indian Air Force Procurement of Aero Engine Spares & Related Components 83 Items 515359 INR 2026

Indian Air Force

Posted: 24 January 2026
Closed: 3 February 2026
GEM

Set of gasket,Spacer sleeve,Parallel key,Set of bearing complete,Piston rod complete,Orifice M10,Or

Indian Coast Guard

JAGATSINGHAPUR, ODISHA

Posted: 15 May 2025
Closed: 9 June 2025
GEM

Piston with pin,Piston rings,Begin bearing std,Connecting Rod,E O H gasket,Timing belt,M Oil filter

Jammu And Kashmir Police

JAMMU, JAMMU & KASHMIR

Posted: 10 December 2024
Closed: 1 January 2025
GEM

Bill of Quantities (BOQ) 133 Items Sign in for GEM prices

#1

CRANK SHAFT ASSLY

As per attached specification sheet

1 pieces Delivery: 180 days
#2

OIL FILLER

As per attached specification sheet

2 pieces Delivery: 180 days
#3

GASKET Part No 24 462 440 00

As per attached specification sheet

12 pieces Delivery: 180 days
#4

WASHER SPRING

As per attached specification sheet

96 pieces Delivery: 180 days
#5

WASHER SPRING

As per attached specification sheet

48 pieces Delivery: 180 days
#6

STUD STD T

As per attached specification sheet

24 pieces Delivery: 180 days
#7

V BELT

As per attached specification sheet

8 pieces Delivery: 180 days
#8

GASKET FOR REAR COVER

As per attached specification sheet

4 pieces Delivery: 180 days
#9

PULLEY FAN DRIVING

As per attached specification sheet

1 pieces Delivery: 180 days
#10

OIL SEAL

As per attached specification sheet

2 pieces Delivery: 180 days
#11

BEARING ROLLER

As per attached specification sheet

2 pieces Delivery: 180 days
#12

CIRCLIP INTERNAL

As per attached specification sheet

4 pieces Delivery: 180 days
#13

SCREW HEX STD

As per attached specification sheet

96 pieces Delivery: 180 days
#14

PLUG MAGNETIC

As per attached specification sheet

2 pieces Delivery: 180 days
#15

WASHER 3

As per attached specification sheet

4 pieces Delivery: 180 days
#16

NUT HEX

As per attached specification sheet

16 pieces Delivery: 180 days
#17

BEARING NEEDLE ROLLR

As per attached specification sheet

4 pieces Delivery: 180 days
#18

SPACER SINGLE EDGE

As per attached specification sheet

4 pieces Delivery: 180 days
#19

GASKET FOR FRONT COVER

As per attached specification sheet

4 pieces Delivery: 180 days
#20

CIRCLIP INTERNAL TYPE B

As per attached specification sheet

2 pieces Delivery: 180 days
#21

OIL SEAL

As per attached specification sheet

4 pieces Delivery: 180 days
#22

BEARING BALL JOURNAL

As per attached specification sheet

2 pieces Delivery: 180 days
#23

BEARING NEEDLE ROLLR

As per attached specification sheet

2 pieces Delivery: 180 days
#24

ROD CONNECTING 4 STAGE

As per attached specification sheet

2 pieces Delivery: 180 days
#25

ROD CONNECTING I by IV STAGE

As per attached specification sheet

2 pieces Delivery: 180 days
#26

GASKET FOR OIL FILTER

As per attached specification sheet

4 pieces Delivery: 180 days
#27

SPACER RING

As per attached specification sheet

2 pieces Delivery: 180 days
#28

NIPPLE PIPE ONE SIDE THREAD

As per attached specification sheet

4 pieces Delivery: 180 days
#29

NUT HEX M20X2by5

As per attached specification sheet

16 pieces Delivery: 180 days
#30

WASHER SPRING

As per attached specification sheet

4 pieces Delivery: 180 days
#31

WASHER SPRING

As per attached specification sheet

12 pieces Delivery: 180 days
#32

WASHER PLAIN STEEL

As per attached specification sheet

16 pieces Delivery: 180 days
#33

CYLINDER 128D

As per attached specification sheet

2 pieces Delivery: 180 days
#34

CYLINDER AND LINER ASSLY 35D

As per attached specification sheet

1 pieces Delivery: 180 days
#35

SUCTION VALVE II STAGE

As per attached specification sheet

4 pieces Delivery: 180 days
#36

DELIVERY VALVE II STAGE

As per attached specification sheet

4 pieces Delivery: 180 days
#37

SUCTION VALVE FOURTH STAGE

As per attached specification sheet

4 pieces Delivery: 180 days
#38

DISCHARGE VALVE IV STAGE SIZE

As per attached specification sheet

4 pieces Delivery: 180 days
#39

RING No 330

As per attached specification sheet

24 pieces Delivery: 180 days
#40

RING 4TH ST VALVES

As per attached specification sheet

16 pieces Delivery: 180 days
#41

BELL FOR IV STAGE SUCTION

As per attached specification sheet

2 pieces Delivery: 180 days
#42

RING No 334

As per attached specification sheet

16 pieces Delivery: 180 days
#43

CYLINDER HEAD IV STAGE

As per attached specification sheet

4 pieces Delivery: 180 days
#44

RING

As per attached specification sheet

8 pieces Delivery: 180 days
#45

BELL FOR IV STAGE DELIVERY

As per attached specification sheet

4 pieces Delivery: 180 days
#46

PISTON IV STAGE

As per attached specification sheet

2 pieces Delivery: 180 days
#47

COMPRESSION RING 4 TH STAGE

As per attached specification sheet

20 pieces Delivery: 180 days
#48

NUT FIXING M75X1 by 5 I AND IV AND I

As per attached specification sheet

4 pieces Delivery: 180 days
#49

PAD FOR PISTON IV AND V STAGE

As per attached specification sheet

4 pieces Delivery: 180 days
#50

Pin Gudgeon

As per attached specification sheet

4 pieces Delivery: 180 days
#51

PLUG M6X1 FOR III

As per attached specification sheet

8 pieces Delivery: 180 days
#52

PISTON I STAGE CIRCLIP

As per attached specification sheet

8 pieces Delivery: 180 days
#53

RING PISTON COMPRESSION II STAGE

As per attached specification sheet

16 pieces Delivery: 180 days
#54

RING OIL SCRAPING

As per attached specification sheet

16 pieces Delivery: 180 days
#55

RING

As per attached specification sheet

16 pieces Delivery: 180 days
#56

GASKET Part No 24 441 240 00

As per attached specification sheet

16 pieces Delivery: 180 days
#57

GASKET Part No 24 462 000 00

As per attached specification sheet

8 pieces Delivery: 180 days
#58

WASHER SPRING ID 14 point 2 X THK 3

As per attached specification sheet

76 pieces Delivery: 180 days
#59

STUD STD TYPE B M12X1 point 75X35L

As per attached specification sheet

32 pieces Delivery: 180 days
#60

NUT HEXAGONAL M 12 X 1 point 75 P

As per attached specification sheet

64 pieces Delivery: 180 days
#61

WASHER

As per attached specification sheet

64 pieces Delivery: 180 days
#62

RING 99X62X1

As per attached specification sheet

16 pieces Delivery: 180 days
#63

GASKET 90SQX71X1

As per attached specification sheet

16 pieces Delivery: 180 days
#64

RING No 856

As per attached specification sheet

16 pieces Delivery: 180 days
#65

RING Part No 24 430 182 00

As per attached specification sheet

16 pieces Delivery: 180 days
#66

RING No 331 Part No 24 430 251 00

As per attached specification sheet

8 pieces Delivery: 180 days
#67

RING No 330 Part No 24 430 260 00

As per attached specification sheet

8 pieces Delivery: 180 days
#68

RING Part No 24 430 421 00

As per attached specification sheet

8 pieces Delivery: 180 days
#69

RING 99X62X1

As per attached specification sheet

8 pieces Delivery: 180 days
#70

GASKET Part No 24 441 240 00

As per attached specification sheet

8 pieces Delivery: 180 days
#71

GASKET Part No 24 462 000 00

As per attached specification sheet

4 pieces Delivery: 180 days
#72

PIN GUDGEON

As per attached specification sheet

2 pieces Delivery: 180 days
#73

PLUG M6X1 FOR III

As per attached specification sheet

8 pieces Delivery: 180 days
#74

RING PISTON COMPRESSION II STAGE

As per attached specification sheet

8 pieces Delivery: 180 days
#75

RING OIL SCRAPING

As per attached specification sheet

8 pieces Delivery: 180 days
#76

CYLINDER III STAGE 65D

As per attached specification sheet

8 pieces Delivery: 180 days
#77

PISTON II STAGE AND III STAGE

As per attached specification sheet

1 pieces Delivery: 180 days
#78

GASKET Part No 8047 10 41 00

As per attached specification sheet

4 pieces Delivery: 180 days
#79

COMPRESSION RING 3 RD STAGE

As per attached specification sheet

8 pieces Delivery: 180 days
#80

SUCTION VALVE II STAGE

As per attached specification sheet

2 pieces Delivery: 180 days
#81

DELIVERY VALVE II STAGE

As per attached specification sheet

2 pieces Delivery: 180 days
#82

STUD STD TYPE B M10X1 point 5X50L

As per attached specification sheet

16 pieces Delivery: 180 days
#83

STUD STD TYPE B M12X1 point 75X35L

As per attached specification sheet

16 pieces Delivery: 180 days
#84

NUT HEX M10X1 point 5P

As per attached specification sheet

32 pieces Delivery: 180 days
#85

NUT HEXAGONAL M 12 X 1 point 75 P

As per attached specification sheet

32 pieces Delivery: 180 days
#86

WASHER SPRING ID 10 point 2 X THK 2 point 2

As per attached specification sheet

64 pieces Delivery: 180 days
#87

WASHER SPRING ID 14 point 2 X THK

As per attached specification sheet

72 pieces Delivery: 180 days
#88

ROD CONNECTING II III STAGE

As per attached specification sheet

1 pieces Delivery: 180 days
#89

SUCTION VALVE THIRD STAGE SIZE 52RN

As per attached specification sheet

1 pieces Delivery: 180 days
#90

DISCHARGE VALVE III STAGE SIZE 52RN

As per attached specification sheet

1 pieces Delivery: 180 days
#91

WASHER Part No 23 560 203 00

As per attached specification sheet

64 pieces Delivery: 180 days
#92

PRESSURE SAFETY VALVE FIRST

As per attached specification sheet

2 pieces Delivery: 180 days
#93

PRESSURE SAFETY VALVE SECOND

As per attached specification sheet

2 pieces Delivery: 180 days
#94

PRESSURE SAFETY VALVE THIRD

As per attached specification sheet

1 pieces Delivery: 180 days
#95

SAFETY VALVE FOURTH STAGE SET

As per attached specification sheet

2 pieces Delivery: 180 days
#96

COOLING PACKAGE I

As per attached specification sheet

1 pieces Delivery: 180 days
#97

S A FILTER SUCTION

As per attached specification sheet

1 pieces Delivery: 180 days
#98

HOSE BEND SUCTION FILTER 90 DEG 114

As per attached specification sheet

4 pieces Delivery: 180 days
#99

NUT HEXAGONAL M 12 X 1 point 75 P

As per attached specification sheet

48 pieces Delivery: 180 days
#100

STUD STD TYPE B M12X1 point 75X35L

As per attached specification sheet

32 pieces Delivery: 180 days
#101

WASHER SPRING ID 14 point 2 X THK 3

As per attached specification sheet

40 pieces Delivery: 180 days
#102

CLAMP HOSE ID 125 TO 145

As per attached specification sheet

8 pieces Delivery: 180 days
#103

PULLEY 2GROOVES

As per attached specification sheet

2 pieces Delivery: 120 days
#104

MECHANICAL LUBRICATOR

As per attached specification sheet

1 pieces Delivery: 180 days
#105

V BELT A71

As per attached specification sheet

8 pieces Delivery: 180 days
#106

WASHER SPRING ID12 point 2X2 point 5 mm

As per attached specification sheet

40 pieces Delivery: 180 days
#107

FELT SEAL SQ 8MMX200L

As per attached specification sheet

4 pieces Delivery: 180 days
#108

BRG BALL DEEP GR

As per attached specification sheet

2 pieces Delivery: 180 days
#109

ADAPTOR SLEEVE ASSEMBLY

As per attached specification sheet

2 pieces Delivery: 180 days
#110

PLUMMER BLOCK DIA 75

As per attached specification sheet

1 pieces Delivery: 180 days
#111

SCREW HEX STD M20X2 point 5X90L

As per attached specification sheet

8 pieces Delivery: 180 days
#112

V BELT SPACE SAVER SPC 3550

As per attached specification sheet

8 pieces Delivery: 180 days
#113

AUTO DRAIN VALVE 2 by 2WAY

As per attached specification sheet

1 pieces Delivery: 180 days
#114

AUTO DRAIN VALVE 2 by 2 WAY

As per attached specification sheet

1 pieces Delivery: 180 days
#115

AUTO DRAIN VALVE 3 by 2WAY

As per attached specification sheet

1 pieces Delivery: 180 days
#116

AUTO DRAIN VALVE 2by2WAY NC 24VDC

As per attached specification sheet

1 pieces Delivery: 180 days
#117

ALERT LUB LISCREW

As per attached specification sheet

1 pieces Delivery: 180 days
#118

SCREW HEX STD M8 X 1 point 25 X 20L

As per attached specification sheet

12 pieces Delivery: 180 days
#119

STUD STD TYPE B M10X1point5X55L

As per attached specification sheet

6 pieces Delivery: 180 days
#120

NUT HEX M10X1point5P

As per attached specification sheet

24 pieces Delivery: 180 days
#121

WASHER SPRING ID 10 point 2 X THK 2 point 2

As per attached specification sheet

4 pieces Delivery: 180 days
#122

GASKET 66 SQX1MM FOR FAN HUB

As per attached specification sheet

2 pieces Delivery: 180 days
#123

BEARING BALL

As per attached specification sheet

2 pieces Delivery: 180 days
#124

BEARING BALL JOURNAL

As per attached specification sheet

2 pieces Delivery: 180 days
#125

RING FELT 47 DIA X 32 DIA X 10

As per attached specification sheet

4 pieces Delivery: 180 days
#126

WASHER LOCK FOR FAN AXLE

As per attached specification sheet

4 pieces Delivery: 180 days
#127

FLYWHEEL 2 GROOVES 660point4 PCD

As per attached specification sheet

1 pieces Delivery: 180 days
#128

PULLEY MOTOR 2 GROOVES 620 RPM

As per attached specification sheet

1 pieces Delivery: 180 days
#129

FAN FOR AIR COOLER ITEM No 94 111 337 00

As per attached specification sheet

1 pieces Delivery: 180 days
#130

LOCKING PLATE FOR MOTOR PULLEY

As per attached specification sheet

2 pieces Delivery: 180 days
#131

DRIVE SHAFT ASSLY

As per attached specification sheet

1 pieces Delivery: 180 days
#132

CAM SHAFT ASSLY

As per attached specification sheet

1 pieces Delivery: 180 days
#133

PUMPING ELEMENT

As per attached specification sheet

1 pieces Delivery: 180 days

Required Documents

1

OEM Authorization Certificate

2

Additional Doc 1 (Requested in ATC)

3

Additional Doc 2 (Requested in ATC)

4

Additional Doc 3 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria

5

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Technical Results

S.No Seller Item Date Status
1
HSS SOLUTIONS PRIVATE LIMITED   Under PMA
-27-03-2025 21:51:10

Frequently Asked Questions

Key insights about RAJASTHAN tender market

What are the qualification requirements for the GEM/2025/B/5886739 tender?

The qualification requirements for this tender entail that bidders must be registered entities with valid documentation demonstrating their experience in supplying spare parts for industrial machinery, particularly compressors. Potential suppliers should ensure they have a history of successful contracts and meet all necessary legal and commercial prerequisites as specified in the tender documentation.

What technical specifications must bidders comply with for the spare parts?

Bidders must adhere to specific technical specifications that outline compatibility with the Kirloskar Pneumatic Make KG4H Compressor. This includes providing evidence that all spare parts meet industry standards and manufacturer requirements. Prospective suppliers should reference the detailed product specifications in the tender documentation to ensure compliance with quality norms.

What are the payment terms associated with this tender?

The payment terms for this tender will be detailed within the contract agreements post-acceptance of bids. Typically, payment schedules may include advance payments, milestone payments tied to delivery and acceptance, or a net-term payment post-delivery. Bidders should review the financial sections of the tender documents for precise payment conditions.

Which document formats are accepted for submission?

The submission process will specify acceptable document formats, which generally include PDF, DOCX for technical bids, and XLSX for financial proposals. It is critical for bidders to follow the stated formats to ensure their submissions are considered valid and to avoid disqualification.

How are bids evaluated and selected for this tender?

The evaluation and selection process involves a thorough examination of both technical and financial proposals submitted for the GEM/2025/B/5886739 tender. Criteria for evaluation include adherence to technical specifications, cost analysis, and overall value offered to the Department of Atomic Energy. Successful bidders will be notified according to the procedures laid out in the tender documentation.

Similar Tenders

5 found
Urgent

copper washer size 28X33mm,O ring dia 58mm,Lube oil filter,O ring dia 38mm,O ring dia 67mm,O ring f

Nuclear Power Corporation Of India Limited

📍 CHITTORGARH, RAJASTHAN

EMD: ₹310
⏰ Deadline: 3 days left
🛒 Type: Goods
View GEM
Urgent

Valve Assy,Gasket Throttle body,Cable assy accelerator,Body throttle,Gasket complete EMOH,Pin Dowel

Border Security Force (bsf)

Est: ₹93,000
⏰ Deadline: 2 days left
🛒 Type: Goods
View GEM
Urgent

seal o ring liner,gasket engine oil sump,gasket egr valve,gasket turbo charger oil outlet,gasket tu

Border Security Force (bsf)

📍 RAJAURI, JAMMU & KASHMIR

Est: ₹95,000
⏰ Deadline: 5 days left
🛒 Type: Goods
View GEM
Urgent

liner cylinder std,seal o ring liner,bush cam shaft,bearing crank shaft 0 10,bearing connecting rod

Border Security Force (bsf)

📍 RAJAURI, JAMMU & KASHMIR

Est: ₹1.4 L
⏰ Deadline: 4 days left
🛒 Type: Goods
View GEM

Engine overhauling gasket with head gasket complete set,Piston set With Gajan Pin STD,Piston ring S

Border Security Force (bsf)

📍 KORAPUT, ODISHA

⏰ Deadline: 2 weeks left
🛒 Type: Goods
View GEM
Chat with us