Bid Publish Date
11-Mar-2026, 5:06 pm
Bid End Date
10-Apr-2026, 1:00 pm
Value
₹4,38,724
Location
Progress
Quantity
69007
Category
Centrifusing of TF Oil
Bid Type
Two Packet Bid
Uttar Pradesh Power Corporation Limited (UPPCL), Energy Department, invites bids from eligible bidders for a multi-item maintenance and component replacement package at the 400/132 kV transformer assets under Kasara-Mau division, Kasara-Mau Sub-Station. Estimated value: ₹4,38,724.00. Location: MAU, UTTAR PRADESH (121705). Scope includes dismantling of Jumper on ACSR Moose conductor, draining transformer oil, replacement of pressure release valve assembly, removal of 145 kV bushing, replacement of radiator bank components, centrifuging of transformer oil, and tightening of jumpers. A key differentiator is the listed sequence of high-voltage maintenance tasks with ATC overlays. The tender references UPPTCL/Buyer terms and GeM alignment, with a notable option clause for quantity variations up to 25% during and after contract execution.
Product/Service names: dismantling of Jumper of ACSR Moose conductor; drain out transformer oil; replacement of pressure release valve assembly; removal of 145kV Bushing; replacement of miner seepage radiator bank; centrifuging of 400/132kV 200MVA transformer oil; making and tightening of Jumper
Quantity/Scope: 7 items in BOQ; detailed quantities not disclosed in data
Estimated value: ₹4,38,724.00
Standards/Certifications: Not specified in tender data; ATC terms reference UPPTCL terms
Delivery/Installation: Kasara-Mau 400kV sub-station scope; delivery window governed by option clause
Experience: Not explicitly quantified; require prior HV maintenance experience per typical UPPTCL procurement
Option Clause: quantity +/-25% at contract placement and during currency
Delivery period: starts from last date of original delivery order; time extension formula
ATC precedence: UPPTCL terms prevail over GeM in case of contradictions
EMD/guarantees: amount not specified in data; bidders must verify at bid submission
Documentation: standard GST, PAN, financials, experience, OEM authorizations
Terms align with UPPTCL ATC; exact payment schedule not stated in data
Delivery window governed by option clause; additional extension rules apply as outlined
Not detailed in provided data; bidders should review UPPTCL terms and GeM terms
Experience in high-voltage transformer maintenance or related HV equipment works
Capability to perform dismantling, oil handling, PRV and bushing replacements
Financial stability with verifiable statements and GST registration
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Dismantling of Jumper of ACSR Moose conductor , Drain out of Store Transformer oil , Replacement of pressure release valve assembly , Removing of 145kV Bushing , Replacement of miner seepage rediator Bank , Centrifusing of TF Oil , Making and tighting of Jumper
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Dismantling of Jumper of ACSR Moose conductor
Dismantling of 03 NO HV Side Jumper of ACSR Moose Consductor and 03 No LV Side Jumper
Drain out of Store Transformer oil
Drain out and store transformer oil according to required level from conservator tank
Replacement of pressure release valve assembly
Replacement of pressure Release Valve assembly (SUKRUT make) with new good quality Gasket
Removing of 145kV Bushing
Removing of 145KV Bushing (Y Phase) for replacement
Replacement of miner seepage rediator Bank
Replacement of 01 No. minor seepage Rediator Bank by old and used rediator bank
Centrifusing of TF Oil
Centrifusing of approx 69KL capacity Transformer Oil
Making and tighting of Jumper
Making and tighting of 03 No. HV side Jumper of ACSR Moose Conductor
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Dismantling of Jumper of ACSR Moose conductor | Dismantling of 03 NO HV Side Jumper of ACSR Moose Consductor and 03 No LV Side Jumper | 1 | job | ee@mau123 | 90 | |
| 2 | Drain out of Store Transformer oil | Drain out and store transformer oil according to required level from conservator tank | 1 | job | ee@mau123 | 90 | |
| 3 | Replacement of pressure release valve assembly | Replacement of pressure Release Valve assembly (SUKRUT make) with new good quality Gasket | 2 | job | ee@mau123 | 90 | |
| 4 | Removing of 145kV Bushing | Removing of 145KV Bushing (Y Phase) for replacement | 1 | job | ee@mau123 | 90 | |
| 5 | Replacement of miner seepage rediator Bank | Replacement of 01 No. minor seepage Rediator Bank by old and used rediator bank | 1 | job | ee@mau123 | 90 | |
| 6 | Centrifusing of TF Oil | Centrifusing of approx 69KL capacity Transformer Oil | 69,000 | liter | ee@mau123 | 90 | |
| 7 | Making and tighting of Jumper | Making and tighting of 03 No. HV side Jumper of ACSR Moose Conductor | 1 | job | ee@mau123 | 90 |
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar HV transformer maintenance projects
Financial statements (last 2-3 years)
EMD/Security deposit documents (as applicable by UPPTCL terms)
Technical bid documents showing methodologies for PRV, bushing, radiator bank work
OEM authorizations or authorized distributor certificates for relevant components
Any ATC-view or added terms/document linked to GeM submission
Extended Deadline
10-Apr-2026, 1:00 pm
Opening Date
10-Apr-2026, 1:30 pm
Extended Deadline
03-Apr-2026, 1:00 pm
Opening Date
03-Apr-2026, 1:30 pm
Key insights about UTTAR PRADESH tender market
Bidders must submit GST, PAN, experience certificates, financial statements, EMD documents, and technical bid demonstrating HV maintenance capability. The scope includes dismantling jumpers, PRV assembly replacement, 145kV bushing work, radiator bank components, and transformer oil centrifuging. The option clause allows up to 25% quantity changes.
Required documents include GST certificate, PAN card, experience certificates for HV projects, last 2-3 years financial statements, EMD/security deposit proof, OEM authorizations for relevant components, and detailed technical bid outlining methods for PRV, bushing, and oil centrifuging work.
Technical tasks cover dismantling of Jumper on ACSR Moose, draining transformer oil, replacement of pressure release valve assembly, removal of 145kV bushing, radiator bank replacement, oil centrifuging for 400/132kV 200MVA transformer, and tightening of jumpers as per ATC terms.
Estimated value is ₹4,38,724.00 with seven BOQ items; scope emphasizes HV equipment maintenance at Kasara-Mau 400kV Sub-Station, including oil handling and component replacements under UPPTCL terms.
The purchaser may increase/decrease bid quantity up to 25% at award and during contract, with delivery extension using the specified formula, minimum 30 days, starting from the last date of original delivery order.
Exact standards are not specified in the data; bidders should ensure IS/IEC compliance as per HV maintenance norms and OEM authorizations, plus GST/PAN proofs and financials for eligibility.
Delivery terms follow UPPTCL ATC; payment terms are aligned with buyer terms. Since explicit percentages are not provided, bidders should prepare for standard UPPTCL payment on milestone/acceptance pending contract specifics.
Check experience in HV transformer servicing, capacity to execute oil handling and valve replacements, financial stability, GST registration, and OEM authorizations; ensure readiness for 400kV class equipment work as per ATC.
Sign up now to access all documents
Main Document
BOQ
BOQ
ATC