Bid Publish Date
24-Nov-2022, 9:09 pm
Bid End Date
29-Dec-2022, 5:00 pm
EMD
₹1,45,07,000
Value
₹0
Location
Progress
Tender Type
Open
Tender Fee
₹75,000
Tender Fee Exemption
No
EMD Exemption
No
Category
CIVIL
Public procurement opportunity for The issuing authority Design and Construction of drinking water supply scheme of Aurangabad Nagar Parishad under AMRUT and state plan Scheme (Phase II) with six months of Trial run and thereafter operation and maintenance of system for next five years. (A) Construction of Elevated Service reservoir (ESR)/OHT-7 Nos. , of different capacities ranging from 450 KL to 1350 KL having office room and toilet with water supply arrangement at ground below the tank DI/CI/HDPE Distribution Network 96. 68 km, providing house service connection-1400 Nos. (B) Construction of High Yielding Tubewell-12 Nos. , Raw Water Pump-1 set, Approach road-779. 90 M (for CWR, ESR), Clear Water Pipe Line (CWR at Barun-20. 10 km, (600 mm dia DI k9 Pipe), Construction of Gangway-1 set (3000m long 1 m wide), Lifting Arrangement 2 set, Chlorinator (200L)-1 No. , Construction of Chlorinator room 1 No. , Stand Post-20 Nos. , Master Elevated Reservoir-1 No. (1270 KL), having office room and toilet at ground floor below tank area Intermediate Pumping Station-3 Nos. , (Zone-III, Zone-V, Zone VI), Clear Water reservoir-1 No. at Barun (1340 KL), Clear Water Pump-1 Set, Clean Water Pumping Main-630 M (250mm dia, 600mm dia), Clear Water Gravity Main-12. 012 km (250mm dia, 750mm dia), DI/CI/HDPE Distribution Network 77. 81 km (Zone I, III & IV), House Service Connection-8340 Nos. , SCADA System-8 Nos. in BIHAR issued by. Submission Deadline: 29-12-2022 17: 00: 00. View full details and respond.
Processing Fee
₹5,900
Tender Currency
INR
Bid Currency
INR
Ranking Sequence
L1 Ranking
Estimated Value Visibility
N
Bid To RA
No
Organization Hierarchy
Government of Bihar->Bihar Urban Infrastructure Development Corporation Ltd.->BUIDCO CGM->GM BUIDCO->PD BUIDCO
Approving Authority
BABAN SINGH (EE)
Tender Creator
Mr BABAN SINGH (EXECUTIVE ENGINEER)
Pre-Bid Meeting Start
28-11-2022 15:00:00
Pre-Bid Meeting End
28-11-2022 16:00:00
Pre-Bid Discussion Type
OFFLINE
Pre-Bid Venue
CGM office, Buidco, Near Rajapur Pul, Patna- 01
| Type | Amount | Currency | Mode | Exemption |
|---|---|---|---|---|
| EMD | ₹1,45,07,000 | INR | Internet Payment Gateway(IPG),Challan|Bank Guarantee | No |
| Tender Fee | ₹75,000 | INR | Internet Payment Gateway(IPG),Challan| | No |
| Tender Processing Fee | ₹5,900 | INR | Internet Payment Gateway(IPG),Challan| | No |
Legal Status of Bidder.
Place of Registration.
Principal place of Business
Power of attorney of signatory Bid
Executed in any one year, the minimum quantities of the following items of work in last five years.
Existing commitments and ongoing works
Work for which Bid already submitted
Availability of key items of Contractor's Equipment
Key Personnel
Bid Validity (120 Days)
Bid Security (145.07 Lakh)
Total value of civil engineering construction work in a year performed in last five years (6753.30 L
Work Experience of Similar nature (1350.66 Lakh)
Bidding Capacity (13506.640 Lakh)
Evidence of accesses to Financial Resources (1350.66 Lakh)
Affidavit
Investment capability (3376.66 Lakh)
Character Certificate issued by competent authority
Any other document if require as per Bid Document must be uploded by bidder
Company Name
Email ID and Mobile No.
Address
GST No.
PAN No.
Company Registration No.
Litigation History
Please accept all terms and condition as per Bid Document.
Please accept all terms and condition as per Bid Document.
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
NIT
CORRIGENDUM
GENERAL_DOCUMENT
GENERAL_DOCUMENT
GENERAL_DOCUMENT
NIT
GENERAL_DOCUMENT
Design and Construction of drinking water supply scheme of Aurangabad Nagar Parishad under AMRUT and state plan Scheme (Phase II) with six months of Trial run and thereafter operation and maintenance of system for next five years. (A) Construction of Elevated Service reservoir (ESR)/OHT-7 Nos., of different capacities ranging from 450 KL to 1350 KL having office room and toilet with water supply arrangement at ground below the tank DI/CI/HDPE Distribution Network 96.68 km, providing house service connection-1400 Nos. (B) Construction of High Yielding Tubewell-12 Nos., Raw Water Pump-1 set, Approach road-779.90 M (for CWR, ESR), Clear Water Pipe Line (CWR at Barun-20.10 km, (600 mm dia DI k9 Pipe), Construction of Gangway-1 set (3000m long 1 m wide), Lifting Arrangement 2 set, Chlorinator (200L)-1 No., Construction of Chlorinator room 1 No., Stand Post-20 Nos., Master Elevated Reservoir-1 No. (1270 KL), having office room and toilet at ground floor below tank area Intermediate Pumping Station-3 Nos., (Zone-III, Zone-V, Zone VI), Clear Water reservoir-1 No. at Barun (1340 KL), Clear Water Pump-1 Set, Clean Water Pumping Main-630 M (250mm dia, 600mm dia), Clear Water Gravity Main-12.012 km (250mm dia, 750mm dia), DI/CI/HDPE Distribution Network 77.81 km (Zone I, III & IV), House Service Connection-8340 Nos., SCADA System-8 Nos.
Design and Construction of drinking water supply scheme of Aurangabad Nagar Parishad under AMRUT and state plan Scheme (Phase II) with six months of Trial run and thereafter operation and maintenance of system for next five years. (A) Construction of Elevated Service reservoir (ESR)/OHT-7 Nos., of different capacities ranging from 450 KL to 1350 KL having office room and toilet with water supply arrangement at ground below the tank DI/CI/HDPE Distribution Network 96.68 km, providing house service connection-1400 Nos. (B) Construction of High Yielding Tubewell-12 Nos., Raw Water Pump-1 set, Approach road-779.90 M (for CWR, ESR), Clear Water Pipe Line (CWR at Barun-20.10 km, (600 mm dia DI k9 Pipe), Construction of Gangway-1 set (3000m long 1 m wide), Lifting Arrangement 2 set, Chlorinator (200L)-1 No., Construction of Chlorinator room 1 No., Stand Post-20 Nos., Master Elevated Reservoir-1 No. (1270 KL), having office room and toilet at ground floor below tank area Intermediate Pumping Station-3 Nos., (Zone-III, Zone-V, Zone VI), Clear Water reservoir-1 No. at Barun (1340 KL), Clear Water Pump-1 Set, Clean Water Pumping Main-630 M (250mm dia, 600mm dia), Clear Water Gravity Main-12.012 km (250mm dia, 750mm dia), DI/CI/HDPE Distribution Network 77.81 km (Zone I, III & IV), House Service Connection-8340 Nos., SCADA System-8 Nos.
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Attachment | Rate | Estimated Cost | Mandatory | Price Trends |
|---|---|---|---|---|---|---|---|---|---|---|---|
| BUIDCo/Yo-2579/22-44 | Design and Construction of drinking water supply scheme of Aurangabad Nagar Parishad under AMRUT and state plan Scheme (Phase II) with six months of Trial run and thereafter operation and maintenance of system for next five years. (A) Construction of Elevated Service reservoir (ESR)/OHT-7 Nos., of different capacities ranging from 450 KL to 1350 KL having office room and toilet with water supply arrangement at ground below the tank DI/CI/HDPE Distribution Network 96.68 km, providing house service connection-1400 Nos. (B) Construction of High Yielding Tubewell-12 Nos., Raw Water Pump-1 set, Approach road-779.90 M (for CWR, ESR), Clear Water Pipe Line (CWR at Barun-20.10 km, (600 mm dia DI k9 Pipe), Construction of Gangway-1 set (3000m long 1 m wide), Lifting Arrangement 2 set, Chlorinator (200L)-1 No., Construction of Chlorinator room 1 No., Stand Post-20 Nos., Master Elevated Reservoir-1 No. (1270 KL), having office room and toilet at ground floor below tank area Intermediate Pumping Station-3 Nos., (Zone-III, Zone-V, Zone VI), Clear Water reservoir-1 No. at Barun (1340 KL), Clear Water Pump-1 Set, Clean Water Pumping Main-630 M (250mm dia, 600mm dia), Clear Water Gravity Main-12.012 km (250mm dia, 750mm dia), DI/CI/HDPE Distribution Network 77.81 km (Zone I, III & IV), House Service Connection-8340 Nos., SCADA System-8 Nos. | Design and Construction of drinking water supply scheme of Aurangabad Nagar Parishad under AMRUT and state plan Scheme (Phase II) with six months of Trial run and thereafter operation and maintenance of system for next five years. (A) Construction of Elevated Service reservoir (ESR)/OHT-7 Nos., of different capacities ranging from 450 KL to 1350 KL having office room and toilet with water supply arrangement at ground below the tank DI/CI/HDPE Distribution Network 96.68 km, providing house service connection-1400 Nos. (B) Construction of High Yielding Tubewell-12 Nos., Raw Water Pump-1 set, Approach road-779.90 M (for CWR, ESR), Clear Water Pipe Line (CWR at Barun-20.10 km, (600 mm dia DI k9 Pipe), Construction of Gangway-1 set (3000m long 1 m wide), Lifting Arrangement 2 set, Chlorinator (200L)-1 No., Construction of Chlorinator room 1 No., Stand Post-20 Nos., Master Elevated Reservoir-1 No. (1270 KL), having office room and toilet at ground floor below tank area Intermediate Pumping Station-3 Nos., (Zone-III, Zone-V, Zone VI), Clear Water reservoir-1 No. at Barun (1340 KL), Clear Water Pump-1 Set, Clean Water Pumping Main-630 M (250mm dia, 600mm dia), Clear Water Gravity Main-12.012 km (250mm dia, 750mm dia), DI/CI/HDPE Distribution Network 77.81 km (Zone I, III & IV), House Service Connection-8340 Nos., SCADA System-8 Nos. | 1 | Work | - | - | Revised Financial Sheet_aurangabad.xls | ₹0 | ₹1 | Yes |
Discover companies most likely to bid on this tender
Sign up now to access all documents
NIT
CORRIGENDUM
GENERAL_DOCUMENT
GENERAL_DOCUMENT
GENERAL_DOCUMENT
NIT
GENERAL_DOCUMENT