Progress
Quantity
1
Bid Type
Two Packet Bid
Organization: Office Of Dg (mss), Department of Defence Research & Development. The procurement covers Comprehensive Maintenance Contract (CMC/AMC) for pre-owned Temperature & Humidity Control and Environment Control Systems installed with Carrier equipment. Estimated value is ₹601,623 and the EMD is ₹18,050. Scope includes 7 units: 11 TR = 4 units and 8.5 TR = 3 units. Location details are not specified in the data. A key differentiator is the requirement for MII Local Content Certificate and OEM authorization verification under ATC terms.
7 units total: 4x 11 TR and 3x 8.5 TR
System: pre-owned Temperature & Humidity Control and Environment Control (Carrier)
EMD: ₹18,050; Estimated value: ₹601,623
Turnaround: 1 day for repairs; 3 PM visits/year
Response time: 11 days; offline yearly AMC payments
MII Local Content Certificate per TBRL format; OEM authorization verification
EMD specified at ₹18,050; ensure payment with bid submission
23 PM visits maximum per year; ensure schedule alignment
ATC terms require MII Local Content and OEM verification
Yearly AMC payments after satisfactory completion of AMC period; payments processed offline
Repair turnaround not to exceed 1 day; 3 preventive maintenance visits per year
Penalties not explicitly stated; adherence to SLAs implied by ATC terms
Experience in AMC/CMC for HVAC or Carrier-based systems
Compliance with MII Local Content requirements
OEM authorization verification completed and valid
Tender Category
Service
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Customized AMC/CMC for Pre-owned Products - Temperature & Humidity Control and Environment Control System; Carrier; Comprehensive Maintenance Contract (CMC); 3 Visits; No
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
SCOPE_OF_WORK
PAYMENT
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
GST registration certificate
PAN card
Experience certificates (similar AMC/CMC for HVAC or Carrier systems)
Financial statements (last 2 financial years)
EMD deposit proof (₹18,050)
Technical bid documents and Scope of Work signed/stamped
OEM authorization certificates
MII Local Content Certificate (TBRL format)
Extended Deadline
30-Dec-2025, 12:00 pm
Opening Date
30-Dec-2025, 12:30 pm
Extended Deadline
23-Dec-2025, 12:00 pm
Opening Date
23-Dec-2025, 12:30 pm
Extended Deadline
16-Dec-2025, 12:00 pm
Opening Date
16-Dec-2025, 12:30 pm
| S.No | Seller | Date | Status |
|---|---|---|---|
| 1 | ACE COOLING SOLUTIONS Under PMA | 08-12-2025 17:13:46 | |
| 2 | ADVANCE MEDICAL SOLUTIONS Under PMA | 07-12-2025 14:53:39 |
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | ACE COOLING SOLUTIONS( MSE Social Category:General ) Under PMA | Item Categories : Customized AMC/CMC for Pre-owned Products - Temperature & Humidity Control and Environment Control |
Key insights about HARYANA tender market
Bidders must submit the EMD of ₹18,050 along with GST, PAN, experience certificates, financial statements, OEM authorizations, and the signed Scope of Work. Ensure MII Local Content certificate per TBRL format and OEM verification. The process requires offline payments after AMC completion.
Prepare GST certificate, PAN, two years of financial statements, experience certificates for similar AMC/CMC work, EMD deposit receipt, OEM authorization, MII Local Content certificate, and the signed Scope of Work with company stamp and authorized signatory.
Tender specifies seven pre-owned Carrier systems: four 11 TR units and three 8.5 TR units. Exact model numbers not provided; bidders should confirm compatibility with DRDO environment control requirements and ensure OEM authorization and MII compliance.
The AMC is annual, with a maximum of three preventive maintenance visits per year and a repair turnaround target of 1 day. Payment terms are yearly after satisfactory AMC performance and completion.
EMD is ₹18,050. Submit proof of online or demand draft payment as part of bid submission; ensure it accompanies technical and financial bids to qualify for evaluation.
Mandatory MII Local Content Certificate per TBRL format and OEM Authorization Certificate verification. Ensure all technical requirements in the Scope of Work are signed and stamped by authorized personnel.
Payment is made on a yearly basis after satisfactory completion of the AMC period, processed via offline mode. Ensure delivery of all PM visits and repairs within SLA to trigger payment release.
A maximum of 3 PM visits per year is allowed. Plan visits to cover all seven units (4x11 TR and 3x8.5 TR) and record service data for compliance and payment validation.