Bid Publish Date
11-Feb-2026, 10:58 am
Bid End Date
11-Mar-2026, 3:00 pm
EMD
₹6,86,390
Value
₹6,86,38,990
Location
Progress
RAQuantity
96480
Category
Excavation
Bid Type
Two Packet Bid
Uranium Corporation Of India Limited invites bids for Excavation, Earthfilling, RCCbreaking, PCC, RCC, SANDFILLING, STEELREINFORCEMENT, SHUTTERINGBELOWPLINTHLEV in CUDDAPAH, ANDHRA PRADESH. Quantity: 96480. Submission Deadline: 11-03-2026 15: 00: 00. Submit your proposal before the deadline.
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Excavation
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. 2.6.1 All kinds of soil
Earthfilling
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.
RCCbreaking
Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge.
PCC
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level - 1-3-6 (1 Cement -3 coarse sand (zone-III) - 6 graded stone aggregate 20 mm nominal size)
RCC
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level - 1-1.5-3 (1 cement - 1.5 coarse sand (zone-III)- 3 graded stone aggregate 20 mm nominal size)
SANDFILLING
Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete.
STEELREINFORCEMENT
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level and below plinth level.5.22A.6 Thermo-Mechanically Treated bars of grade Fe-500D or more
SHUTTERINGBELOWPLINTHLEVEL
Centering and shuttering including strutting, propping etc. and removal of form as per directions of Engineer-in-charge at all leads and lift 5.9.1 in Foundations, footings, bases of columns (All the Below Plinth level) etc.
SHUTTERINGABOVEPLINTHLEVEL
Centering and shuttering including strutting, propping etc. and removal of form as per directions of Engineer-in-charge at all leads and lift 5.9.6 Columns, Pillars, Piers, Abutments, Posts and Struts, (All the above Plinth level)
DRYSTONEPITCHING
Dry stone pitching 22.5 cm thick including supply of stones and preparing surface complete
GROUTING
Providing and Grouting of pockets with cementitious grout Non Shrink of approved make by suitable means Free flowing pump curing etc Complete as per directions of Engineer in charge The payment shall be made on the basis of actual weight of approved grout used as per directions of Engineer in charge
CEMENTPUNNING
Neat cement punning.
DEMOLISHINGBRICKWORK
Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge 15.7.4 In cement mortar
BRICKWORKCONSTRUCTION
Brick work with non modular fly ash bricks conforming to IS-12894, class designation 10 average compressive strength in super structure above plinth level up to floor V level in -
PAINTINGONWALLS
Finishing walls with textured exterior paint of required shade - 13.45.1 New work (Two or more coats applied at 3.28 ltr/10 sqm) over and including priming coat of exterior primer applied at 2.20kg/ 10 sqm
FINISHPAINTONWALLS
Finishing walls with 100% Premium acrylic emulsion paint having VOC less than 50 gm/litre and UV resistance as per IS 15489-2004, Alkali & fungal resistance, dirt resistance exterior paint of required shade (Company Depot Tinted) with silicon additive New work (Two or more coats applied at 1.43 litre/10 sqm. Over and including priming coat of exterior primer applied at 0.90 litre/10 sqm.
CEMENTPLASTERING
15 mm cement plaster with mix -1-6 (1 cement- 6 fine sand) at all heights and lead as per directions of Engineer-in-charge.
RANDOMRUBBLEMASONRY
Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1-6-12 (1 cement - 6 coarse sand - 12 graded stone aggregate 20 mm nominal size) upto plinth level with 7.1.1 Cement mortar 1-6 (1 cement - 6 coarse sand)
COLLAPSABLESTEELSHUTTERING
Providing and fixing in position collapsible steel shutters with vertical channels 20x10x2 mm and braced with flat iron diagonals 20x5 mm size, with top and bottom rail of T-iron 40x40x6 mm, with 40 mm dia steel pulleys, complete with bolts, nuts, locking arrangement, stoppers, handles, including applying a priming coat of approved steel primer.
DESINGNINGPUMPFOUNDATION1
Designing of RCC foundation for PERISTALTIC PUMP FOR Existing tank New 8V-2C/D/C with VFD 80/80
DESINGNINGPUMPFOUNDATION2
Designing of RCC foundation forPERISTALTIC PUMP FOR DECANTER SOLID DISCHARGE REPULPER TANK TO SDU DISSOLUTION TANK 65/65
DESINGNINGPUMPFOUNDATION3
Designing of RCC foundation for Centrifugal pump for pumping Decanter Centrate to SDU thickener 80/40
DESINGNINGPUMPFOUNDATION4
Designing of RCC foundation for Centrifuge feed Pump with VFD Alloy 20 80/40
DESINGNINGPUMPFOUNDATION5
Designing of RCC foundation for PERISTALTIC PUMP FOR H2SO4 Dosing with VFD 40/40
DESINGNINGPUMPFOUNDATION6
Designing of RCC foundation for Screw Pump
DESINGNINGPUMPFOUNDATION7
Designing of RCC foundation for Pump from Liquid Centrate tank to Precipitation tank Alloy 20 80/40
DESINGNINGPUMPFOUNDATION8
Designing of RCC foundation for Cloth Wash Water Pump with Motor (4.3 LPM at4 bar)
DESINGNINGPUMPFOUNDATION9
Designing of RCC foundation for Squeezing water Pump with Motor
DESINGNINGPUMPFOUNDATION10
Designing of RCC foundation for Acidified water feed pump Alloy 20 for cake wash 50/40
DESINGNINGPUMPFOUNDATION11
Designing of RCC foundation for Press filter feed pump with VFD Centrifugal Alloy 20 40/25
DESINGNINGPUMPFOUNDATION12
Designing of RCC foundation for AI filtrate to dissolution by pump Alloy 20 50/25
DESINGNINGPUMPFOUNDATION13
Designing of RCC foundation for PERISTALTIC PUMP FOR Underflow with VFD 40/40
DESINGNINGPUMPFOUNDATION14
Designing of RCC foundation for Cloth wash water transfer pump Alloy 20 50/25
DESINGNINGPUMPFOUNDATION15
Designing of RCC foundation for Cloth wash thickener overflow transfer pump Alloy 20 50/25
DESINGNINGPUMPFOUNDATION16
Designing of RCC foundation for PERISTALTIC PUMP FOR pumping to thickener with VFD 65/65
DESINGNINGPUMPFOUNDATION17
Designing of RCC foundation for Flocculant Transfer Pump
DESINGNINGPUMPFOUNDATION18
Designing of RCC foundation for Flocculant Dosing Pump
DESINGNINGPUMPFOUNDATION19
Designing of RCC foundation for PERISTALTIC PUMP FOR NaoH Peristaltic pump with VFD 40/40
DESINGNINGPUMPFOUNDATION20
Designing of RCC foundation for PERISTALTIC PUMP FOR H2O2 Peristaltic pump with VFD 40/40
DESINGNINGPUMPFOUNDATION21
Designing of RCC foundation for PERISTALTIC PUMP FOR Thickener u/f pump with VFD 65/65
DESINGNINGPUMPFOUNDATION22
Designing of RCC foundation for PERISTALTIC PUMP FOR Pump to Existing HBF repulping and washing tank with VFD 40/40
DESINGNINGPUMPFOUNDATION23
Designing of RCC foundation for Hot water from rotary kiln to cooling tower pump CF8
DESINGNINGPUMPFOUNDATION24
Designing of RCC foundation for Cold water from cooling tower to Rotary kiln pump CF8
DESINGNINGPUMPFOUNDATION25
Designing of RCC foundation for H2O2 Unloading Pumps 80/50
DESINGNINGPUMPFOUNDATION26
Designing of RCC foundation for H2O2 Sump- Pumps 80/40
DESINGNINGPUMPFOUNDATION27
Designing of RCC foundation for H2O2 Transfer Pumps 80/50
DESIGNINGTANKFOUNDATION1
Designing of RCC foundation for Hot water insulated tank -SS 304L
DESIGNINGTANKFOUNDATION2
Designing of RCC foundation for Solid Discharge tank for Decantor Solids with agitator 1No -SS-304L
DESIGNINGTANKFOUNDATION3
Designing of RCC foundation for Decantor filtrate tank- SS-304L
DESIGNINGTANKFOUNDATION4
Designing of RCC foundation for 15m3 Dissolution tank (EF) -SS316L
DESIGNINGTANKFOUNDATION5
Designing of RCC foundation for H2SO4 Tank, 2m3 MS
DESIGNINGTANKFOUNDATION6
Designing of RCC foundation for Liquid Centrate Tank, 15 m3 -SS316L
DESIGNINGTANKFOUNDATION7
Designing of RCC foundation for Centrifuge Solid Discharge i.e AI Repulper tank SS316L
DESIGNINGTANKFOUNDATION8
Designing of RCC foundation for AI Filtrate tank,2.0 m3 SS316L
DESIGNINGTANKFOUNDATION9
Designing of RCC foundation for Acidified water Day tank SS316L
DESIGNINGTANKFOUNDATION10
Designing of RCC foundation for High Density Spillage Thickener 1m X2.4 mSWD, 15 degree slope SS 316L
DESIGNINGTANKFOUNDATION11
Designing of RCC foundation for Cloth wash tank SS316L
DESIGNINGTANKFOUNDATION12
Designing of RCC foundation for Cloth wash Thickener overflow tank -SS-304L
DESIGNINGTANKFOUNDATION13
Designing of RCC foundation for 15m3 Precipitation Tank ( Elevated Floor) SS316L
DESIGNINGTANKFOUNDATION14
Designing of RCC foundation for High Density Thickener 4m X3m SWD SS 316L
DESIGNINGTANKFOUNDATION15
Designing of RCC foundation for NaoH tanks -SS316L
DESIGNINGTANKFOUNDATION16
Designing of RCC foundation for H2O2 tank -SS316L
DESIGNINGTANKFOUNDATION17
Designing of RCC foundation for H2O2 unloading & Transfer tanks
DESIGNINGTANKFOUNDATION18
Designing of RCC foundation for Thickener u/f tank SS316L
DESIGNINGTANKFOUNDATION19
Designing of RCC foundation for Agitator for SDU Repulping Tank, 3 No. of capacity 10m3 (2.2 m Dia X 2.9 m H)
DESIGNINGTANKFOUNDATION20
Designing of RCC foundation forAgitated Hot water insulated tank -SS 304L
DESIGNINGTANKFOUNDATION21
Designing of RCC foundation for Agitated Solid Discharge tank for Decantor Solids with agitator 1No -SS-304L
DESIGNINGTANKFOUNDATION22
Designing of RCC foundation for Agitated Decantor filtrate tank- SS-304L
DESIGNINGTANKFOUNDATION23
Designing of RCC foundation for Agitated 15m3 Dissolution tank (EF) -SS316L
DESIGNINGTANKFOUNDATION24
Designing of RCC foundation for Agitated Centrifuge Solid Discharge i.e AI Repulper tank SS316L
DESIGNINGTANKFOUNDATION25
Designing of RCC foundation for Agitated Cloth wash tank SS316L
DESIGNINGTANKFOUNDATION26
Designing of RCC foundation for Agitated 15m3 Precipitation Tank ( Elevated Floor) SS316L
DESIGNINGTANKFOUNDATION27
Designing of RCC foundation for Agitated Thickener u/f tank SS316L
DESIGNINGOFEQUIPMENTFOUNDATION1
Designing of RCC foundation for Decantor
DESIGNINGOFEQUIPMENTFOUNDATION2
Designing of RCC foundation for Centrifuge
DESIGNINGOFEQUIPMENTFOUNDATION3
Designing of RCC foundation for Press filter
DESIGNINGOFEQUIPMENTFOUNDATION4
Designing of RCC foundation for Rotary kiln
DESIGNINGOFEQUIPMENTFOUNDATION5
Designing of RCC foundation for Compressor
DESIGNINGOFEQUIPMENTFOUNDATION6
Designing of RCC foundation for Bag filter
DESIGNINGOFEQUIPMENTFOUNDATION7
Designing of RCC foundation for Pushh fan
DESIGNINGOFEQUIPMENTFOUNDATION8
Designing of RCC foundation for Pull fan
DESIGNINGOFEQUIPMENTFOUNDATION9
Designing of RCC foundation for Area Sump pumps
DESIGNINGOFSTRUCTURALPLATFORM
Designing of RCC foundations,design of Structural supports at 4.3 meter level for supporting tanks, centrifugal decantors, tower press etc.. ,on platform
DESIGNOFROOFSHEETING
Designing for Roof sheeting
ERECTIONOFEQUIPMENT1
Erection along with alignment of PERISTALTIC PUMP FOR Existing tank New 8V-2C/D/C with VFD 80/80
ERECTIONOFEQUIPMENT2
Erection along with alignment of PERISTALTIC PUMP FOR DECANTER SOLID DISCHARGE REPULPER TANK TO SDU DISSOLUTION TANK 65/65
ERECTIONOFEQUIPMENT3
Erection along with alignment of Centrifugal pump for pumping Decanter Centrate to SDU thickener 80/40
ERECTIONOFEQUIPMENT4
Erection along with alignment of Centrifuge feed Pump with VFD Alloy 20 80/40
ERECTIONOFEQUIPMENT5
Erection along with alignment of PERISTALTIC PUMP FOR H2SO4 Dosing with VFD 40/40
ERECTIONOFEQUIPMENT6
Erection along with alignment of Screw Pump
ERECTIONOFEQUIPMENT7
Erection along with alignment of Pump from Liquid Centrate tank to Precipitation tank Alloy 20 80/40
ERECTIONOFEQUIPMENT8
Erection along with alignment of Cloth Wash Water Pump with Motor (4.3 LPM at 4 bar)
ERECTIONOFEQUIPMENT9
Erection along with alignment of Squeezing water Pump with Motor
ERECTIONOFEQUIPMENT10
Erection along with alignment of Acidified water feed pump Alloy 20 for cake wash 50/40
ERECTIONOFEQUIPMENT11
Erection along with alignment of Press filter feed pump with VFD Centrifugal Alloy 20 40/25
ERECTIONOFEQUIPMENT12
Erection along with alignment of AI filtrate to dissolution by pump Alloy 20 50/25
ERECTIONOFEQUIPMENT13
Erection along with alignment of PERISTALTIC PUMP FOR Underflow with VFD 40/40
ERECTIONOFEQUIPMENT14
Erection along with alignment of Cloth wash water transfer pump Alloy 20 50/25
ERECTIONOFEQUIPMENT15
Erection along with alignment of Cloth wash thickener overflow transfer pump Alloy 20 50/25
ERECTIONOFEQUIPMENT16
Erection along with alignment of PERISTALTIC PUMP FOR pumping to thickener with VFD 65/65
ERECTIONOFEQUIPMENT17
Erection along with alignment of Flocculant Transfer Pump
ERECTIONOFEQUIPMENT18
Erection along with alignment of Flocculant Dosing Pump
ERECTIONOFEQUIPMENT19
Erection along with alignment of PERISTALTIC PUMP FOR NaoH Peristaltic pump with VFD 40/40
ERECTIONOFEQUIPMENT20
Erection along with alignment of PERISTALTIC PUMP FOR H2O2 Peristaltic pump with VFD 40/40
ERECTIONOFEQUIPMENT21
Erection along with alignment of PERISTALTIC PUMP FOR Thickener u/f pump with VFD 65/65
ERECTIONOFEQUIPMENT22
Erection along with alignment of PERISTALTIC PUMP FOR Pump to Existing HBF repulping and washing tank with VFD 40/40
ERECTIONOFEQUIPMENT23
Erection along with alignment of Hot water from rotary kiln to cooling tower pump CF8
ERECTIONOFEQUIPMENT24
Erection along with alignment of Cold water from cooling tower to Rotary kiln pump CF8
ERECTIONOFEQUIPMENT25
Erection along with alignment of H2O2 Unloading Pumps 80/50
ERECTIONOFEQUIPMENT26
Erection along with alignment of H2O2 Sump- Pumps 80/40
ERECTIONOFEQUIPMENT27
Erection along with alignment of H2O2 Transfer Pumps 80/50
ERECTIONOFEQUIPMENT28
Erection along with alignment of Hot water insulated tank -SS 304L
ERECTIONOFEQUIPMENT29
Erection along with alignment ofSolid Discharge tank for Decantor Solids with agitator 1No -SS-304L
ERECTIONOFEQUIPMENT30
Erection along with alignment of Decantor filtrate tank- SS-304L
ERECTIONOFEQUIPMENT31
Erection along with alignment of 15m3 Dissolution tank (EF) -SS316L
ERECTIONOFEQUIPMENT32
Erection along with alignment ofH2SO4 Tank, 2m3 MS
ERECTIONOFEQUIPMENT33
Erection along with alignment of Liquid Centrate Tank, 15 m3 -SS316L
ERECTIONOFEQUIPMENT34
Erection along with alignment of Centrifuge Solid Discharge i.e AI Repulper tank SS316L
ERECTIONOFEQUIPMENT35
Erection along with alignment of AI Filtrate tank,2.0 m3 SS316L
ERECTIONOFEQUIPMENT36
Erection along with alignment of Acidified water Day tank SS316L
ERECTIONOFEQUIPMENT37
Erection along with alignment of High Density Spillage Thickener 1mX 2.4 mSWD, 15degree slope SS 316L
ERECTIONOFEQUIPMENT38
Erection along with alignment of Cloth wash tank SS316L
ERECTIONOFEQUIPMENT39
Cloth wash Thickener overflow tank -SS-304L
ERECTIONOFEQUIPMENT40
Erection along with alignment of 15m3 Precipitation Tank ( Elevated Floor) SS316L
ERECTIONOFEQUIPMENT41
Erection along with alignment of High Density Thickener 4mX 3m SWD SS 316L
ERECTIONOFEQUIPMENT42
Erection along with alignment of NaoH tanks -SS316L
ERECTIONOFEQUIPMENT43
Erection along with alignment of H2O2 tank -SS316L
ERECTIONOFEQUIPMENT44
Erection along with alignment of H2O2 unloading & Transfer tanks
ERECTIONOFEQUIPMENT45
Erection along with alignment of Thickener u/f tank SS316L
ERECTIONOFEQUIPMENT46
Erection along with alignment of Agitator for SDU Repulping Tank, 3 No. of capacity 10m3 (2.2 m Dia X 2.9 m H)
ERECTIONOFEQUIPMENT47
Erection along with alignment of Agitated Hot water insulated tank -SS 304L
ERECTIONOFEQUIPMENT48
Erection along with alignment of Agitated Solid Discharge tank for Decantor Solids with agitator 1No -SS-304L
ERECTIONOFEQUIPMENT49
Erection along with alignment of Agitated Decantor filtrate tank- SS-304L
ERECTIONOFEQUIPMENT50
Erection along with alignment of Agitated 15m3 Dissolution tank (EF) -SS316L
ERECTIONOFEQUIPMENT51
Erection along with alignment of Agitated Centrifuge Solid Discharge i.e AI Repulper tank SS316L
ERECTIONOFEQUIPMENT52
Erection along with alignment of Agitated Cloth wash tank SS316L
ERECTIONOFEQUIPMENT53
Erection along with alignment of Agitated 15m3 Precipitation Tank ( Elevated Floor) SS316L
ERECTIONOFEQUIPMENT54
Erection along with alignment of Agitated Thickener u/f tank SS316L
ERECTIONOFEQUIPMENT55
Erection along with alignment of Decantor
ERECTIONOFEQUIPMENT56
Erection along with alignment of Centrifuge
ERECTIONOFEQUIPMENT57
Erection along with alignment of Press filter
ERECTIONOFEQUIPMENT58
Erection along with alignment of Rotary kelen
ERECTIONOFEQUIPMENT59
Erection along with alignment of Compressor
ERECTIONOFEQUIPMENT60
Erection along with alignment of Bag filter
ERECTIONOFEQUIPMENT61
Erection along with alignment of Pushh fan
ERECTIONOFEQUIPMENT62
Erection along with alignment of Pull fan
ERECTIONOFEQUIPMENT63
Erection along with alignment of Area Sump pumps
ERECTIONOFSTEELSTRUCTURES
Fabrication& erection, painting of structural steel items
ERECTIONOFROOFSHEETS
Roof sheeting work (To be billed after completion of full work only) erection
ERECTIONOFEQUIPMENT64
Erection along with alignment of Capacity 5MT, rope length - 12 meters
ERECTIONOFEQUIPMENT65
Erection along with alignment of Capacity 2MT, rope length - 12 meters
ERECTIONOFEQUIPMENT66
Erection along with alignment of Electric hoist Capacity 5MT, rope length - 12 meters
ERECTIONOFEQUIPMENT67
Erection along with alignment of Electric hoist Capacity 2MT, rope length - 12 meters
SUPPLYOFSTEELSTRUCTURE
Supply of Structural steel of various sections as per approved design requirement
SUPPLYOFROOFSHEETS
Supply of Roof sheets - sheets of sizes 0.55mm thick , along with 2 number of 4 turbo ventilators
SUPPLYOFELECTRICHOIST1
Supply of Electric hoist Capacity 5MT, rope length - 12 meters
SUPPLYOFELECTRICHOIST2
Supply of Electric hoist Capacity 2MT, rope length - 12 meters
SUPPLYOFSTEAMPRS
Supply of Steam (automatic with manual over ride ) pressure reducing station size 80NB to reduce steam pressure from 3.5 bar - up to 1.2 bar for water heating
DESINGINGOFPIPERACK
Design of pipeline routing for process ,steam and instrumentation air and structural support.
ERECTIONACTIVITIESOFBAGFILTER
Putting a 1800mm diameter and 750mm height with flanges SS -316 cylinder insert in the existing bag filter with 1000 mm extension of 400 mm in suction and discharge side.
ERECTIONOFTANK
Erection of product holding tank.
DESIGNOFCOMPRESSORHOUSE
Compressor house design and erection
DESIGNOFBAGFILTERDUCT
Design of bag filter suction duct
SUBMISSIONOFFINALGAOFEQUIPMENTLAYOUT
Submission of final GA of equipment layout.
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Excavation | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. 2.6.1 All kinds of soil | 2,180 | cu m | tmplconsignee2 | 180 | |
| 2 | Earthfilling | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | 1,410 | cu m | tmplconsignee2 | 180 | |
| 3 | RCCbreaking | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. | 303 | cu m | tmplconsignee2 | 180 | |
| 4 | PCC | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level - 1-3-6 (1 Cement -3 coarse sand (zone-III) - 6 graded stone aggregate 20 mm nominal size) | 271 | cu m | tmplconsignee2 | 180 | |
| 5 | RCC | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level - 1-1.5-3 (1 cement - 1.5 coarse sand (zone-III)- 3 graded stone aggregate 20 mm nominal size) | 1,335 | cu m | tmplconsignee2 | 180 | |
| 6 | SANDFILLING | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 463 | cu m | tmplconsignee2 | 180 | |
| 7 | STEELREINFORCEMENT | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level and below plinth level.5.22A.6 Thermo-Mechanically Treated bars of grade Fe-500D or more | 75,700 | kg | tmplconsignee2 | 180 | |
| 8 | SHUTTERINGBELOWPLINTHLEVEL | Centering and shuttering including strutting, propping etc. and removal of form as per directions of Engineer-in-charge at all leads and lift 5.9.1 in Foundations, footings, bases of columns (All the Below Plinth level) etc. | 2,935 | sqm | tmplconsignee2 | 180 | |
| 9 | SHUTTERINGABOVEPLINTHLEVEL | Centering and shuttering including strutting, propping etc. and removal of form as per directions of Engineer-in-charge at all leads and lift 5.9.6 Columns, Pillars, Piers, Abutments, Posts and Struts, (All the above Plinth level) | 530 | sqm | tmplconsignee2 | 180 | |
| 10 | DRYSTONEPITCHING | Dry stone pitching 22.5 cm thick including supply of stones and preparing surface complete | 1,180 | sqm | tmplconsignee2 | 180 | |
| 11 | GROUTING | Providing and Grouting of pockets with cementitious grout Non Shrink of approved make by suitable means Free flowing pump curing etc Complete as per directions of Engineer in charge The payment shall be made on the basis of actual weight of approved grout used as per directions of Engineer in charge | 4,500 | kg | tmplconsignee2 | 180 | |
| 12 | CEMENTPUNNING | Neat cement punning. | 1,030 | sqm | tmplconsignee2 | 180 | |
| 13 | DEMOLISHINGBRICKWORK | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge 15.7.4 In cement mortar | 20 | cu m | tmplconsignee2 | 180 | |
| 14 | BRICKWORKCONSTRUCTION | Brick work with non modular fly ash bricks conforming to IS-12894, class designation 10 average compressive strength in super structure above plinth level up to floor V level in - | 95 | cu m | tmplconsignee2 | 180 | |
| 15 | PAINTINGONWALLS | Finishing walls with textured exterior paint of required shade - 13.45.1 New work (Two or more coats applied at 3.28 ltr/10 sqm) over and including priming coat of exterior primer applied at 2.20kg/ 10 sqm | 820 | sqm | tmplconsignee2 | 180 | |
| 16 | FINISHPAINTONWALLS | Finishing walls with 100% Premium acrylic emulsion paint having VOC less than 50 gm/litre and UV resistance as per IS 15489-2004, Alkali & fungal resistance, dirt resistance exterior paint of required shade (Company Depot Tinted) with silicon additive New work (Two or more coats applied at 1.43 litre/10 sqm. Over and including priming coat of exterior primer applied at 0.90 litre/10 sqm. | 820 | sqm | tmplconsignee2 | 180 | |
| 17 | CEMENTPLASTERING | 15 mm cement plaster with mix -1-6 (1 cement- 6 fine sand) at all heights and lead as per directions of Engineer-in-charge. | 700 | sqm | tmplconsignee2 | 180 | |
| 18 | RANDOMRUBBLEMASONRY | Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1-6-12 (1 cement - 6 coarse sand - 12 graded stone aggregate 20 mm nominal size) upto plinth level with 7.1.1 Cement mortar 1-6 (1 cement - 6 coarse sand) | 67 | cu m | tmplconsignee2 | 180 | |
| 19 | COLLAPSABLESTEELSHUTTERING | Providing and fixing in position collapsible steel shutters with vertical channels 20x10x2 mm and braced with flat iron diagonals 20x5 mm size, with top and bottom rail of T-iron 40x40x6 mm, with 40 mm dia steel pulleys, complete with bolts, nuts, locking arrangement, stoppers, handles, including applying a priming coat of approved steel primer. | 30 | sqm | tmplconsignee2 | 180 | |
| 20 | DESINGNINGPUMPFOUNDATION1 | Designing of RCC foundation for PERISTALTIC PUMP FOR Existing tank New 8V-2C/D/C with VFD 80/80 | 1 | no s | tmplconsignee2 | 180 | |
| 21 | DESINGNINGPUMPFOUNDATION2 | Designing of RCC foundation forPERISTALTIC PUMP FOR DECANTER SOLID DISCHARGE REPULPER TANK TO SDU DISSOLUTION TANK 65/65 | 1 | no s | tmplconsignee2 | 180 | |
| 22 | DESINGNINGPUMPFOUNDATION3 | Designing of RCC foundation for Centrifugal pump for pumping Decanter Centrate to SDU thickener 80/40 | 1 | no s | tmplconsignee2 | 180 | |
| 23 | DESINGNINGPUMPFOUNDATION4 | Designing of RCC foundation for Centrifuge feed Pump with VFD Alloy 20 80/40 | 1 | no s | tmplconsignee2 | 180 | |
| 24 | DESINGNINGPUMPFOUNDATION5 | Designing of RCC foundation for PERISTALTIC PUMP FOR H2SO4 Dosing with VFD 40/40 | 1 | no s | tmplconsignee2 | 180 | |
| 25 | DESINGNINGPUMPFOUNDATION6 | Designing of RCC foundation for Screw Pump | 1 | no s | tmplconsignee2 | 180 | |
| 26 | DESINGNINGPUMPFOUNDATION7 | Designing of RCC foundation for Pump from Liquid Centrate tank to Precipitation tank Alloy 20 80/40 | 1 | no s | tmplconsignee2 | 180 | |
| 27 | DESINGNINGPUMPFOUNDATION8 | Designing of RCC foundation for Cloth Wash Water Pump with Motor (4.3 LPM at4 bar) | 1 | no s | tmplconsignee2 | 180 | |
| 28 | DESINGNINGPUMPFOUNDATION9 | Designing of RCC foundation for Squeezing water Pump with Motor | 1 | no s | tmplconsignee2 | 180 | |
| 29 | DESINGNINGPUMPFOUNDATION10 | Designing of RCC foundation for Acidified water feed pump Alloy 20 for cake wash 50/40 | 1 | no s | tmplconsignee2 | 180 | |
| 30 | DESINGNINGPUMPFOUNDATION11 | Designing of RCC foundation for Press filter feed pump with VFD Centrifugal Alloy 20 40/25 | 1 | no s | tmplconsignee2 | 180 | |
| 31 | DESINGNINGPUMPFOUNDATION12 | Designing of RCC foundation for AI filtrate to dissolution by pump Alloy 20 50/25 | 1 | no s | tmplconsignee2 | 180 | |
| 32 | DESINGNINGPUMPFOUNDATION13 | Designing of RCC foundation for PERISTALTIC PUMP FOR Underflow with VFD 40/40 | 1 | no s | tmplconsignee2 | 180 | |
| 33 | DESINGNINGPUMPFOUNDATION14 | Designing of RCC foundation for Cloth wash water transfer pump Alloy 20 50/25 | 1 | no s | tmplconsignee2 | 180 | |
| 34 | DESINGNINGPUMPFOUNDATION15 | Designing of RCC foundation for Cloth wash thickener overflow transfer pump Alloy 20 50/25 | 1 | no s | tmplconsignee2 | 180 | |
| 35 | DESINGNINGPUMPFOUNDATION16 | Designing of RCC foundation for PERISTALTIC PUMP FOR pumping to thickener with VFD 65/65 | 1 | no s | tmplconsignee2 | 180 | |
| 36 | DESINGNINGPUMPFOUNDATION17 | Designing of RCC foundation for Flocculant Transfer Pump | 1 | no s | tmplconsignee2 | 180 | |
| 37 | DESINGNINGPUMPFOUNDATION18 | Designing of RCC foundation for Flocculant Dosing Pump | 1 | no s | tmplconsignee2 | 180 | |
| 38 | DESINGNINGPUMPFOUNDATION19 | Designing of RCC foundation for PERISTALTIC PUMP FOR NaoH Peristaltic pump with VFD 40/40 | 1 | no s | tmplconsignee2 | 180 | |
| 39 | DESINGNINGPUMPFOUNDATION20 | Designing of RCC foundation for PERISTALTIC PUMP FOR H2O2 Peristaltic pump with VFD 40/40 | 1 | no s | tmplconsignee2 | 180 | |
| 40 | DESINGNINGPUMPFOUNDATION21 | Designing of RCC foundation for PERISTALTIC PUMP FOR Thickener u/f pump with VFD 65/65 | 1 | no s | tmplconsignee2 | 180 | |
| 41 | DESINGNINGPUMPFOUNDATION22 | Designing of RCC foundation for PERISTALTIC PUMP FOR Pump to Existing HBF repulping and washing tank with VFD 40/40 | 1 | no s | tmplconsignee2 | 180 | |
| 42 | DESINGNINGPUMPFOUNDATION23 | Designing of RCC foundation for Hot water from rotary kiln to cooling tower pump CF8 | 1 | no s | tmplconsignee2 | 180 | |
| 43 | DESINGNINGPUMPFOUNDATION24 | Designing of RCC foundation for Cold water from cooling tower to Rotary kiln pump CF8 | 1 | no s | tmplconsignee2 | 180 | |
| 44 | DESINGNINGPUMPFOUNDATION25 | Designing of RCC foundation for H2O2 Unloading Pumps 80/50 | 1 | no s | tmplconsignee2 | 180 | |
| 45 | DESINGNINGPUMPFOUNDATION26 | Designing of RCC foundation for H2O2 Sump- Pumps 80/40 | 1 | no s | tmplconsignee2 | 180 | |
| 46 | DESINGNINGPUMPFOUNDATION27 | Designing of RCC foundation for H2O2 Transfer Pumps 80/50 | 1 | no s | tmplconsignee2 | 180 | |
| 47 | DESIGNINGTANKFOUNDATION1 | Designing of RCC foundation for Hot water insulated tank -SS 304L | 1 | no s | tmplconsignee2 | 180 | |
| 48 | DESIGNINGTANKFOUNDATION2 | Designing of RCC foundation for Solid Discharge tank for Decantor Solids with agitator 1No -SS-304L | 1 | no s | tmplconsignee2 | 180 | |
| 49 | DESIGNINGTANKFOUNDATION3 | Designing of RCC foundation for Decantor filtrate tank- SS-304L | 1 | no s | tmplconsignee2 | 180 | |
| 50 | DESIGNINGTANKFOUNDATION4 | Designing of RCC foundation for 15m3 Dissolution tank (EF) -SS316L | 1 | no s | tmplconsignee2 | 180 | |
| 51 | DESIGNINGTANKFOUNDATION5 | Designing of RCC foundation for H2SO4 Tank, 2m3 MS | 1 | no s | tmplconsignee2 | 180 | |
| 52 | DESIGNINGTANKFOUNDATION6 | Designing of RCC foundation for Liquid Centrate Tank, 15 m3 -SS316L | 1 | no s | tmplconsignee2 | 180 | |
| 53 | DESIGNINGTANKFOUNDATION7 | Designing of RCC foundation for Centrifuge Solid Discharge i.e AI Repulper tank SS316L | 1 | no s | tmplconsignee2 | 180 | |
| 54 | DESIGNINGTANKFOUNDATION8 | Designing of RCC foundation for AI Filtrate tank,2.0 m3 SS316L | 1 | no s | tmplconsignee2 | 180 | |
| 55 | DESIGNINGTANKFOUNDATION9 | Designing of RCC foundation for Acidified water Day tank SS316L | 1 | no s | tmplconsignee2 | 180 | |
| 56 | DESIGNINGTANKFOUNDATION10 | Designing of RCC foundation for High Density Spillage Thickener 1m X2.4 mSWD, 15 degree slope SS 316L | 1 | no s | tmplconsignee2 | 180 | |
| 57 | DESIGNINGTANKFOUNDATION11 | Designing of RCC foundation for Cloth wash tank SS316L | 1 | no s | tmplconsignee2 | 180 | |
| 58 | DESIGNINGTANKFOUNDATION12 | Designing of RCC foundation for Cloth wash Thickener overflow tank -SS-304L | 1 | no s | tmplconsignee2 | 180 | |
| 59 | DESIGNINGTANKFOUNDATION13 | Designing of RCC foundation for 15m3 Precipitation Tank ( Elevated Floor) SS316L | 1 | no s | tmplconsignee2 | 180 | |
| 60 | DESIGNINGTANKFOUNDATION14 | Designing of RCC foundation for High Density Thickener 4m X3m SWD SS 316L | 1 | no s | tmplconsignee2 | 180 | |
| 61 | DESIGNINGTANKFOUNDATION15 | Designing of RCC foundation for NaoH tanks -SS316L | 1 | no s | tmplconsignee2 | 180 | |
| 62 | DESIGNINGTANKFOUNDATION16 | Designing of RCC foundation for H2O2 tank -SS316L | 1 | no s | tmplconsignee2 | 180 | |
| 63 | DESIGNINGTANKFOUNDATION17 | Designing of RCC foundation for H2O2 unloading & Transfer tanks | 1 | no s | tmplconsignee2 | 180 | |
| 64 | DESIGNINGTANKFOUNDATION18 | Designing of RCC foundation for Thickener u/f tank SS316L | 1 | no s | tmplconsignee2 | 180 | |
| 65 | DESIGNINGTANKFOUNDATION19 | Designing of RCC foundation for Agitator for SDU Repulping Tank, 3 No. of capacity 10m3 (2.2 m Dia X 2.9 m H) | 1 | no s | tmplconsignee2 | 180 | |
| 66 | DESIGNINGTANKFOUNDATION20 | Designing of RCC foundation forAgitated Hot water insulated tank -SS 304L | 1 | no s | tmplconsignee2 | 180 | |
| 67 | DESIGNINGTANKFOUNDATION21 | Designing of RCC foundation for Agitated Solid Discharge tank for Decantor Solids with agitator 1No -SS-304L | 1 | no s | tmplconsignee2 | 180 | |
| 68 | DESIGNINGTANKFOUNDATION22 | Designing of RCC foundation for Agitated Decantor filtrate tank- SS-304L | 1 | no s | tmplconsignee2 | 180 | |
| 69 | DESIGNINGTANKFOUNDATION23 | Designing of RCC foundation for Agitated 15m3 Dissolution tank (EF) -SS316L | 1 | no s | tmplconsignee2 | 180 | |
| 70 | DESIGNINGTANKFOUNDATION24 | Designing of RCC foundation for Agitated Centrifuge Solid Discharge i.e AI Repulper tank SS316L | 1 | no s | tmplconsignee2 | 180 | |
| 71 | DESIGNINGTANKFOUNDATION25 | Designing of RCC foundation for Agitated Cloth wash tank SS316L | 1 | no s | tmplconsignee2 | 180 | |
| 72 | DESIGNINGTANKFOUNDATION26 | Designing of RCC foundation for Agitated 15m3 Precipitation Tank ( Elevated Floor) SS316L | 1 | no s | tmplconsignee2 | 180 | |
| 73 | DESIGNINGTANKFOUNDATION27 | Designing of RCC foundation for Agitated Thickener u/f tank SS316L | 1 | no s | tmplconsignee2 | 180 | |
| 74 | DESIGNINGOFEQUIPMENTFOUNDATION1 | Designing of RCC foundation for Decantor | 1 | no s | tmplconsignee2 | 180 | |
| 75 | DESIGNINGOFEQUIPMENTFOUNDATION2 | Designing of RCC foundation for Centrifuge | 1 | no s | tmplconsignee2 | 180 | |
| 76 | DESIGNINGOFEQUIPMENTFOUNDATION3 | Designing of RCC foundation for Press filter | 1 | no s | tmplconsignee2 | 180 | |
| 77 | DESIGNINGOFEQUIPMENTFOUNDATION4 | Designing of RCC foundation for Rotary kiln | 1 | no s | tmplconsignee2 | 180 | |
| 78 | DESIGNINGOFEQUIPMENTFOUNDATION5 | Designing of RCC foundation for Compressor | 1 | no s | tmplconsignee2 | 180 | |
| 79 | DESIGNINGOFEQUIPMENTFOUNDATION6 | Designing of RCC foundation for Bag filter | 1 | no s | tmplconsignee2 | 180 | |
| 80 | DESIGNINGOFEQUIPMENTFOUNDATION7 | Designing of RCC foundation for Pushh fan | 1 | no s | tmplconsignee2 | 180 | |
| 81 | DESIGNINGOFEQUIPMENTFOUNDATION8 | Designing of RCC foundation for Pull fan | 1 | no s | tmplconsignee2 | 180 | |
| 82 | DESIGNINGOFEQUIPMENTFOUNDATION9 | Designing of RCC foundation for Area Sump pumps | 1 | no s | tmplconsignee2 | 180 | |
| 83 | DESIGNINGOFSTRUCTURALPLATFORM | Designing of RCC foundations,design of Structural supports at 4.3 meter level for supporting tanks, centrifugal decantors, tower press etc.. ,on platform | 1 | no s | tmplconsignee2 | 180 | |
| 84 | DESIGNOFROOFSHEETING | Designing for Roof sheeting | 1 | no s | tmplconsignee2 | 180 | |
| 85 | ERECTIONOFEQUIPMENT1 | Erection along with alignment of PERISTALTIC PUMP FOR Existing tank New 8V-2C/D/C with VFD 80/80 | 3 | no s | tmplconsignee2 | 180 | |
| 86 | ERECTIONOFEQUIPMENT2 | Erection along with alignment of PERISTALTIC PUMP FOR DECANTER SOLID DISCHARGE REPULPER TANK TO SDU DISSOLUTION TANK 65/65 | 2 | no s | tmplconsignee2 | 180 | |
| 87 | ERECTIONOFEQUIPMENT3 | Erection along with alignment of Centrifugal pump for pumping Decanter Centrate to SDU thickener 80/40 | 2 | no s | tmplconsignee2 | 180 | |
| 88 | ERECTIONOFEQUIPMENT4 | Erection along with alignment of Centrifuge feed Pump with VFD Alloy 20 80/40 | 2 | no s | tmplconsignee2 | 180 | |
| 89 | ERECTIONOFEQUIPMENT5 | Erection along with alignment of PERISTALTIC PUMP FOR H2SO4 Dosing with VFD 40/40 | 2 | no s | tmplconsignee2 | 180 | |
| 90 | ERECTIONOFEQUIPMENT6 | Erection along with alignment of Screw Pump | 2 | no s | tmplconsignee2 | 180 | |
| 91 | ERECTIONOFEQUIPMENT7 | Erection along with alignment of Pump from Liquid Centrate tank to Precipitation tank Alloy 20 80/40 | 2 | no s | tmplconsignee2 | 180 | |
| 92 | ERECTIONOFEQUIPMENT8 | Erection along with alignment of Cloth Wash Water Pump with Motor (4.3 LPM at 4 bar) | 2 | no s | tmplconsignee2 | 180 | |
| 93 | ERECTIONOFEQUIPMENT9 | Erection along with alignment of Squeezing water Pump with Motor | 2 | no s | tmplconsignee2 | 180 | |
| 94 | ERECTIONOFEQUIPMENT10 | Erection along with alignment of Acidified water feed pump Alloy 20 for cake wash 50/40 | 2 | no s | tmplconsignee2 | 180 | |
| 95 | ERECTIONOFEQUIPMENT11 | Erection along with alignment of Press filter feed pump with VFD Centrifugal Alloy 20 40/25 | 2 | no s | tmplconsignee2 | 180 | |
| 96 | ERECTIONOFEQUIPMENT12 | Erection along with alignment of AI filtrate to dissolution by pump Alloy 20 50/25 | 2 | no s | tmplconsignee2 | 180 | |
| 97 | ERECTIONOFEQUIPMENT13 | Erection along with alignment of PERISTALTIC PUMP FOR Underflow with VFD 40/40 | 2 | no s | tmplconsignee2 | 180 | |
| 98 | ERECTIONOFEQUIPMENT14 | Erection along with alignment of Cloth wash water transfer pump Alloy 20 50/25 | 2 | no s | tmplconsignee2 | 180 | |
| 99 | ERECTIONOFEQUIPMENT15 | Erection along with alignment of Cloth wash thickener overflow transfer pump Alloy 20 50/25 | 2 | no s | tmplconsignee2 | 180 | |
| 100 | ERECTIONOFEQUIPMENT16 | Erection along with alignment of PERISTALTIC PUMP FOR pumping to thickener with VFD 65/65 | 2 | no s | tmplconsignee2 | 180 | |
| 101 | ERECTIONOFEQUIPMENT17 | Erection along with alignment of Flocculant Transfer Pump | 2 | no s | tmplconsignee2 | 180 | |
| 102 | ERECTIONOFEQUIPMENT18 | Erection along with alignment of Flocculant Dosing Pump | 2 | no s | tmplconsignee2 | 180 | |
| 103 | ERECTIONOFEQUIPMENT19 | Erection along with alignment of PERISTALTIC PUMP FOR NaoH Peristaltic pump with VFD 40/40 | 2 | no s | tmplconsignee2 | 180 | |
| 104 | ERECTIONOFEQUIPMENT20 | Erection along with alignment of PERISTALTIC PUMP FOR H2O2 Peristaltic pump with VFD 40/40 | 2 | no s | tmplconsignee2 | 180 | |
| 105 | ERECTIONOFEQUIPMENT21 | Erection along with alignment of PERISTALTIC PUMP FOR Thickener u/f pump with VFD 65/65 | 2 | no s | tmplconsignee2 | 180 | |
| 106 | ERECTIONOFEQUIPMENT22 | Erection along with alignment of PERISTALTIC PUMP FOR Pump to Existing HBF repulping and washing tank with VFD 40/40 | 2 | no s | tmplconsignee2 | 180 | |
| 107 | ERECTIONOFEQUIPMENT23 | Erection along with alignment of Hot water from rotary kiln to cooling tower pump CF8 | 2 | no s | tmplconsignee2 | 180 | |
| 108 | ERECTIONOFEQUIPMENT24 | Erection along with alignment of Cold water from cooling tower to Rotary kiln pump CF8 | 2 | no s | tmplconsignee2 | 180 | |
| 109 | ERECTIONOFEQUIPMENT25 | Erection along with alignment of H2O2 Unloading Pumps 80/50 | 2 | no s | tmplconsignee2 | 180 | |
| 110 | ERECTIONOFEQUIPMENT26 | Erection along with alignment of H2O2 Sump- Pumps 80/40 | 1 | no s | tmplconsignee2 | 180 | |
| 111 | ERECTIONOFEQUIPMENT27 | Erection along with alignment of H2O2 Transfer Pumps 80/50 | 2 | no s | tmplconsignee2 | 180 | |
| 112 | ERECTIONOFEQUIPMENT28 | Erection along with alignment of Hot water insulated tank -SS 304L | 1 | no s | tmplconsignee2 | 180 | |
| 113 | ERECTIONOFEQUIPMENT29 | Erection along with alignment ofSolid Discharge tank for Decantor Solids with agitator 1No -SS-304L | 1 | no s | tmplconsignee2 | 180 | |
| 114 | ERECTIONOFEQUIPMENT30 | Erection along with alignment of Decantor filtrate tank- SS-304L | 1 | no s | tmplconsignee2 | 180 | |
| 115 | ERECTIONOFEQUIPMENT31 | Erection along with alignment of 15m3 Dissolution tank (EF) -SS316L | 1 | no s | tmplconsignee2 | 180 | |
| 116 | ERECTIONOFEQUIPMENT32 | Erection along with alignment ofH2SO4 Tank, 2m3 MS | 1 | no s | tmplconsignee2 | 180 | |
| 117 | ERECTIONOFEQUIPMENT33 | Erection along with alignment of Liquid Centrate Tank, 15 m3 -SS316L | 1 | no s | tmplconsignee2 | 180 | |
| 118 | ERECTIONOFEQUIPMENT34 | Erection along with alignment of Centrifuge Solid Discharge i.e AI Repulper tank SS316L | 1 | no s | tmplconsignee2 | 180 | |
| 119 | ERECTIONOFEQUIPMENT35 | Erection along with alignment of AI Filtrate tank,2.0 m3 SS316L | 1 | no s | tmplconsignee2 | 180 | |
| 120 | ERECTIONOFEQUIPMENT36 | Erection along with alignment of Acidified water Day tank SS316L | 1 | no s | tmplconsignee2 | 180 | |
| 121 | ERECTIONOFEQUIPMENT37 | Erection along with alignment of High Density Spillage Thickener 1mX 2.4 mSWD, 15degree slope SS 316L | 1 | no s | tmplconsignee2 | 180 | |
| 122 | ERECTIONOFEQUIPMENT38 | Erection along with alignment of Cloth wash tank SS316L | 1 | no s | tmplconsignee2 | 180 | |
| 123 | ERECTIONOFEQUIPMENT39 | Cloth wash Thickener overflow tank -SS-304L | 1 | no s | tmplconsignee2 | 180 | |
| 124 | ERECTIONOFEQUIPMENT40 | Erection along with alignment of 15m3 Precipitation Tank ( Elevated Floor) SS316L | 1 | no s | tmplconsignee2 | 180 | |
| 125 | ERECTIONOFEQUIPMENT41 | Erection along with alignment of High Density Thickener 4mX 3m SWD SS 316L | 1 | no s | tmplconsignee2 | 180 | |
| 126 | ERECTIONOFEQUIPMENT42 | Erection along with alignment of NaoH tanks -SS316L | 1 | no s | tmplconsignee2 | 180 | |
| 127 | ERECTIONOFEQUIPMENT43 | Erection along with alignment of H2O2 tank -SS316L | 1 | no s | tmplconsignee2 | 180 | |
| 128 | ERECTIONOFEQUIPMENT44 | Erection along with alignment of H2O2 unloading & Transfer tanks | 2 | no s | tmplconsignee2 | 180 | |
| 129 | ERECTIONOFEQUIPMENT45 | Erection along with alignment of Thickener u/f tank SS316L | 1 | no s | tmplconsignee2 | 180 | |
| 130 | ERECTIONOFEQUIPMENT46 | Erection along with alignment of Agitator for SDU Repulping Tank, 3 No. of capacity 10m3 (2.2 m Dia X 2.9 m H) | 3 | no s | tmplconsignee2 | 180 | |
| 131 | ERECTIONOFEQUIPMENT47 | Erection along with alignment of Agitated Hot water insulated tank -SS 304L | 1 | no s | tmplconsignee2 | 180 | |
| 132 | ERECTIONOFEQUIPMENT48 | Erection along with alignment of Agitated Solid Discharge tank for Decantor Solids with agitator 1No -SS-304L | 1 | no s | tmplconsignee2 | 180 | |
| 133 | ERECTIONOFEQUIPMENT49 | Erection along with alignment of Agitated Decantor filtrate tank- SS-304L | 1 | no s | tmplconsignee2 | 180 | |
| 134 | ERECTIONOFEQUIPMENT50 | Erection along with alignment of Agitated 15m3 Dissolution tank (EF) -SS316L | 1 | no s | tmplconsignee2 | 180 | |
| 135 | ERECTIONOFEQUIPMENT51 | Erection along with alignment of Agitated Centrifuge Solid Discharge i.e AI Repulper tank SS316L | 1 | no s | tmplconsignee2 | 180 | |
| 136 | ERECTIONOFEQUIPMENT52 | Erection along with alignment of Agitated Cloth wash tank SS316L | 1 | no s | tmplconsignee2 | 180 | |
| 137 | ERECTIONOFEQUIPMENT53 | Erection along with alignment of Agitated 15m3 Precipitation Tank ( Elevated Floor) SS316L | 1 | no s | tmplconsignee2 | 180 | |
| 138 | ERECTIONOFEQUIPMENT54 | Erection along with alignment of Agitated Thickener u/f tank SS316L | 1 | no s | tmplconsignee2 | 180 | |
| 139 | ERECTIONOFEQUIPMENT55 | Erection along with alignment of Decantor | 1 | no s | tmplconsignee2 | 180 | |
| 140 | ERECTIONOFEQUIPMENT56 | Erection along with alignment of Centrifuge | 1 | no s | tmplconsignee2 | 180 | |
| 141 | ERECTIONOFEQUIPMENT57 | Erection along with alignment of Press filter | 1 | no s | tmplconsignee2 | 180 | |
| 142 | ERECTIONOFEQUIPMENT58 | Erection along with alignment of Rotary kelen | 1 | no s | tmplconsignee2 | 180 | |
| 143 | ERECTIONOFEQUIPMENT59 | Erection along with alignment of Compressor | 1 | no s | tmplconsignee2 | 180 | |
| 144 | ERECTIONOFEQUIPMENT60 | Erection along with alignment of Bag filter | 1 | no s | tmplconsignee2 | 180 | |
| 145 | ERECTIONOFEQUIPMENT61 | Erection along with alignment of Pushh fan | 1 | no s | tmplconsignee2 | 180 | |
| 146 | ERECTIONOFEQUIPMENT62 | Erection along with alignment of Pull fan | 1 | no s | tmplconsignee2 | 180 | |
| 147 | ERECTIONOFEQUIPMENT63 | Erection along with alignment of Area Sump pumps | 5 | no s | tmplconsignee2 | 180 | |
| 148 | ERECTIONOFSTEELSTRUCTURES | Fabrication& erection, painting of structural steel items | 200 | mt | tmplconsignee2 | 180 | |
| 149 | ERECTIONOFROOFSHEETS | Roof sheeting work (To be billed after completion of full work only) erection | 1 | lot | tmplconsignee2 | 180 | |
| 150 | ERECTIONOFEQUIPMENT64 | Erection along with alignment of Capacity 5MT, rope length - 12 meters | 2 | no s | tmplconsignee2 | 180 | |
| 151 | ERECTIONOFEQUIPMENT65 | Erection along with alignment of Capacity 2MT, rope length - 12 meters | 5 | no s | tmplconsignee2 | 180 | |
| 152 | ERECTIONOFEQUIPMENT66 | Erection along with alignment of Electric hoist Capacity 5MT, rope length - 12 meters | 2 | no s | tmplconsignee2 | 180 | |
| 153 | ERECTIONOFEQUIPMENT67 | Erection along with alignment of Electric hoist Capacity 2MT, rope length - 12 meters | 5 | no s | tmplconsignee2 | 180 | |
| 154 | SUPPLYOFSTEELSTRUCTURE | Supply of Structural steel of various sections as per approved design requirement | 200 | mt | tmplconsignee2 | 180 | |
| 155 | SUPPLYOFROOFSHEETS | Supply of Roof sheets - sheets of sizes 0.55mm thick , along with 2 number of 4 turbo ventilators | 1,500 | sq mtr | tmplconsignee2 | 180 | |
| 156 | SUPPLYOFELECTRICHOIST1 | Supply of Electric hoist Capacity 5MT, rope length - 12 meters | 2 | no s | tmplconsignee2 | 180 | |
| 157 | SUPPLYOFELECTRICHOIST2 | Supply of Electric hoist Capacity 2MT, rope length - 12 meters | 5 | no s | tmplconsignee2 | 180 | |
| 158 | SUPPLYOFSTEAMPRS | Supply of Steam (automatic with manual over ride ) pressure reducing station size 80NB to reduce steam pressure from 3.5 bar - up to 1.2 bar for water heating | 1 | set | tmplconsignee2 | 180 | |
| 159 | DESINGINGOFPIPERACK | Design of pipeline routing for process ,steam and instrumentation air and structural support. | 1 | lot | tmplconsignee2 | 180 | |
| 160 | ERECTIONACTIVITIESOFBAGFILTER | Putting a 1800mm diameter and 750mm height with flanges SS -316 cylinder insert in the existing bag filter with 1000 mm extension of 400 mm in suction and discharge side. | 1 | lot | tmplconsignee2 | 180 | |
| 161 | ERECTIONOFTANK | Erection of product holding tank. | 1 | number | tmplconsignee2 | 180 | |
| 162 | DESIGNOFCOMPRESSORHOUSE | Compressor house design and erection | 1 | lot | tmplconsignee2 | 180 | |
| 163 | DESIGNOFBAGFILTERDUCT | Design of bag filter suction duct | 1 | lot | tmplconsignee2 | 180 | |
| 164 | SUBMISSIONOFFINALGAOFEQUIPMENTLAYOUT | Submission of final GA of equipment layout. | 1 | lot | tmplconsignee2 | 180 |
Extended Deadline
11-Mar-2026, 3:00 pm
Opening Date
11-Mar-2026, 3:30 pm
Start
09-Apr-2026, 5:00 pm
End
14-Apr-2026, 5:00 pm
Duration: 120 hours
Reverse Auction Document
✅ RA concluded. Check financial results for final rankings.
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | KOPPARTHI OBULAREDDY Under PMA | - | 09-03-2026 06:59:30 | |
| 2 | KSHETRA INFRATECH Under PMA | - | 10-03-2026 16:29:17 |
These are the final prices after the reverse auction event. Prices may be lower than initial bids.
| Rank | Seller | Final Price | Item |
|---|---|---|---|
| L1 | KSHETRA INFRATECH(MSE,MII) Under PMA Winner | ₹8,16,63,670 | Item Categories : Excavation,Earthfilling,RCCbreaking,PCC,RCC,SANDFILLING,STEELREINFORCEMENT,SHUTTERINGBELOWPLINTHLEV |
| L2 | KOPPARTHI OBULAREDDY (MSE,MII) Under PMA | ₹9,32,85,600 | Item Categories : Excavation,Earthfilling,RCCbreaking,PCC,RCC,SANDFILLING,STEELREINFORCEMENT,SHUTTERINGBELOWPLINTHLEV |
🎉 L1 Winner
KSHETRA INFRATECH(MSE,MII) Under PMA
Final Price: ₹8,16,63,670