Progress
The procurement is issued by the Indian Army under the Department Of Military Affairs for a Bucket Cylinder. The tender references quantity flexibility of up to 25% during contract execution and option-based extensions at contracted rates. A ISO 9001 certification requirement applies to bidders or the OEM, and a Material Test Certificate must accompany supply. The bid emphasizes turnover criteria based on the last three financial years and requires documentation validating compliance with standards. The working scope targets procurement readiness under government security equipment procurement norms, with emphasis on certified quality systems and traceable material compliance. The inclusion of an OEM turnover criterion (where applicable) ensures capable manufacturers participate, while the option clause governs fluctuating demand and delivery timelines. This tender presents a standard government procurement framework with specific emphasis on certification, testing, and quantity management.
Bucket Cylinder: category/specification not detailed in BOQ
Standards: ISO 9001 certified (bidder or OEM)
Quality: Material Test Certificate to be attached with supply
Turnover: Average turnover over last 3 financial years as per bid document
Delivery: Option-based quantity adjustments up to 25% with delivery period adjustments
OEM criteria: OEM turnover requirement for bunch bids if applicable
EMD and standard certificates required; submit ISO 9001 and Material Test Certificate
Quantity may vary ±25%; delivery timeline adjusts accordingly with minimum 30 days
Turnover criteria for bidders and OEM; provide three-year financial data
Not explicitly stated in data; follow standard government contract terms per bid document and ATC
Delivery period commences from the last date of original delivery order; extended period for option clause; minimum 30 days for added quantity
Not detailed here; standard LD terms likely in final contract and ATC
ISO 9001 certification for bidder or OEM
Three-year turnover proof with audited statements or CA certificate
Material Test Certificate accompanying supply
Quantity
1
Bid Type
Two Packet Bid
Bid Validity
90 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
3 Days
EMD Required
No
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
Yes
Bid Splitting Applied
No
OEM Avg. Turnover
1
Past Performance
10 %
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
BUCKET CYLINDER
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
Tinsukia
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | Tinsukia | Tinsukia | - | - | 1 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Extended Deadline
12-Oct-2026, 5:30 am
Opening Date
13-Oct-2026, 5:30 am
GST registration certificate
Permanent Account Number (PAN) card
Audited financial statements or CA certificate indicating turnover for last 3 years
ISO 9001 certificate (bidder or OEM)
Material Test Certificate to accompany supply
OEM authorization (if applicable)
Technical bid documents as per Terms and Conditions
Any corrigenda/ATC-specific certificates
Key insights about ASSAM tender market
Bidders must meet ISO 9001 certification, provide Material Test Certificate, and submit turnover documentation for the last three financial years. Ensure installation-ready delivery terms and comply with ATC. Prepare OEM authorization if you are not the OEM and upload all certificates with the bid.
Required documents include GST registration, PAN, three-year turnover proofs (audited or CA), ISO 9001 certificate (bidder or OEM), Material Test Certificate, OEM authorization (if applicable), and technical bid documents per ATC/Corrigendum.
The purchaser may vary quantity by up to 25% during contract and currency; delivery period adjusts using a formula: (Increased quantity / Original quantity) × Original delivery period, with a minimum of 30 days.
Bidders must hold ISO 9001 certification for themselves or the OEM, and supply with a Material Test Certificate to demonstrate material quality and conformance with procurement standards.
For bunch bids, the OEM of the primary product with the highest bid value must meet the turnover criterion; otherwise, the bidder’s own turnover applies as per the three-year requirement.
Specific LD terms are not detailed here; bidders should review the final bid document and ATC for penalties, with standard government contract practices and potential LD clauses.