TenderDekho Logo
GEM

Invitation to Bid - BOEING THE 737 MAX CRISIS AND AVIATION SAFETY THE PERILS OF PROFIT DRIVEN ENGINEERING,AIRCRAFT COMM in BANGALORE, KARNATAKA

Bid Publish Date

26-Sep-2025, 10:14 am

Bid End Date

17-Oct-2025, 2:00 pm

Progress

RA
Issue26-Sep-2025, 10:14 am
Reverse Auction18-Nov-2025, 11:00 am
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

145

Category

BOEING THE 737 MAX CRISIS AND AVIATION SAFETY THE PERILS OF PROFIT DRIVEN ENGINEERING

Bid Type

Two Packet Bid

Categories 125

AGITATORS FLEET OWNER INTEGRATED MANAGEMENT WIND MILL ENERGY PROJECT BUILDING CONSTRUCTION MANAGEMENT SERVICES APPARELS CABIN POWER PROJECT CENTRIFUGE BRUSHES DIAGNOSTIC TOOL INFORMATION SECURITY LOGO DESIGN MANUFACTURING MACHINERY INSTITUTIONAL STRENGTHENING PRODUCTION SYSTEMS EQUIPMENTS VEHICLE PERISTALTIC PUMPS ELECTROMECHANICAL MACHINERY OVERHAULING OF MECHANICAL TURBINE ENGINES TURBINE BLOWER STRUCTURAL BEARING SHELL THRUST STRUCTURAL AUDIT HARDWARE AND FASTENERS BLADE FAULT ANALYSIS FERROUS ALLOY SUPPLY RIVETS INSTRUMENTATION ART ADDITIVE GEARBOX OVERHAULING TELECOM EQUIPMENT INTEGRATED CIRCUITS RADAR AND SONAR SYSTEMS AND COMPONENTS CLOTHING EQUIPMENT AMC OF ELECTRONIC WEALTH MANAGEMENT SYNCHRONOUS MOTORS AMC OF AC PLANT FUELS STOMACHERS ENGINE MECHANICAL OVERHAULING POWER CIVILIAN AND COMMERCIAL ROTARY WING AIRCRAFT AVIATION VIBRATION TESTERS DAM FLORICULTURE AND SILVICULTURE ALOE VERA ASSET MANAGEMENT RISK MANAGEMENT AUTOMATION ATM BUSINESS MANAGEMENT SERVICES AIRCRAFT AERONAUTICAL ENGINEERING ARMS EQUIPMENT AND INSTRUMENT SAFETY MANAGEMENT ALTERNATING CURRENT MOTOR OFFICE MANAGEMENT FACILITY SERVICE ELECTRONIC PRODUCTS AND APPLIANCES NAVIGATIONAL EQUIPMENT TURBINE VIBROMETERS STORAGE AND WAREHOUSING RIBBON BLENDER ROTARY CAM PUMPS VECTORS CORRUGATED BOX AC MOTORS SPORT VEHICLE FINANCE AND INSURANCE SERVICES HORSE EXTENSOMETERS POSITIVE MATERIAL OIL PUMP WATER LEVEL RECORDER GROCERY VEGETABLES AND FRUITS TELEHANDLER ROBOTIC CHAFF CUTTER MECHANICAL BALANCE BUSINESS CONSULTANCY HELICOPTER WORM GEAR TURBINE PUMPS DRINKS AND ALCOHOLIC BEVERAGES SMART POSITIONER WIND TUNNEL ELECTRO MECHANICAL MAINTENANCE PROGRESSIVE CAVITY PUMPS DATA PROTECTION VIBRATION SENSOR HYDRO-MECHANICAL EQUIPMENT MEGA POWER PROJECT TRANSPORT CONSTRUCTION SUPERVISION STRAIN GAUGES IMPACT WRENCH VIBRATORY SCREEN PROPULSION SYSTEM MACHINE CONCEPT DESIGN VALVE PARTS AND ACCESSORIES SOLID ROCKET MOTORS METEOROLOGICAL INSTRUMENTS INTERNET BALANCING MACHINE NEW POWER PLANT DRONES PHOTOGRAPHIC CAMERAS POWER GENERATION AND TRANSMISSION SOFTWARE SPACECRAFT DEVELOPMENT VIBRATION ANALYZER SPVS MERRY GO ROUND TURBO COMPRESSORS

Hindustan Aeronautics Limited (hal) has released a public tender for BOEING THE 737 MAX CRISIS AND AVIATION SAFETY THE PERILS OF PROFIT DRIVEN ENGINEERING, AIRCRAFT COMM in BANGALORE, KARNATAKA. Quantity: 145. Submission Deadline: 17-10-2025 14: 00: 00. Download documents and apply online.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Authority Records

MINISTRY OF DEFENCEDEFENCE PRODUCTION DEPARTMENTHINDUSTAN AERONAUTICS LIMITED

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 6

GeM-Bidding-8404193.pdf

Main Document

Technical Specification/Buyer Specification Document

TECHNICAL

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 145 Items Sign in for GEM prices

#1

BOEING THE 737 MAX CRISIS AND AVIATION SAFETY THE PERILS OF PROFIT DRIVEN ENGINEERING

see technical specification at slno 1

1 nos Delivery: 180 days
#2

AIRCRAFT COMMUNICATIONS AND NAVIGATION SYSTEMS

see technical specification at slno 2

1 nos Delivery: 180 days
#3

AI AND BLOCKCHAIN OPTIMIZATION TECHNIQUES IN AEROSPACE ENGINEERING

see technical specification at slno 3

1 nos Delivery: 180 days
#4

INTRODUCTION TO GENERATIVE DESIGN FOR AEROSPACE APPLICATIONS FROM THE CREATIVE PROCESS TO MANUFACTURING

see technical specification at slno 4

1 nos Delivery: 180 days
#5

BASIC SCIENCE AND ART OF AIRCRAFT WRECKAGE RECONSTRUCTION

see technical specification at slno 5

1 nos Delivery: 180 days
#6

HIGH LIFT AERODYNAMICS

see technical specification at slno 6

1 nos Delivery: 180 days
#7

HUMAN FACTORS IN AIRCRAFT MAINTENANCE

see technical specification at slno 7

1 nos Delivery: 180 days
#8

FLIGHT SAFETY MANAGEMENT QUANTITATIVE AND AI APPROACHES

see technical specification at slno 8

1 nos Delivery: 180 days
#9

ADVANCED AIRCRAFT UNDERSTANDING VIA THE VIRTUAL AIRCRAFT MODEL

see technical specification at slno 9

1 nos Delivery: 180 days
#10

ADVANCES IN MANUFACTURING FOR AEROSPACE ALLOYS

see technical specification at slno 10

1 nos Delivery: 180 days
#11

ADVANCES IN STRUCTURAL INTEGRITY FOR MECHANICAL CIVIL AND AEROSPACE APPLICATIONS

see technical specification at slno 11

1 nos Delivery: 180 days
#12

AEROSPACE MATERIALS NOVEL TECHNOLOGIES AND PRACTICAL APPLICATIONS

see technical specification at slno 12

1 nos Delivery: 180 days
#13

AEROSPACE STRUCTURES STRUCTURAL DYNAMICS AND MATERIALS CONFERENCE ASME 2024 SSDM 2024

see technical specification at slno 13

1 nos Delivery: 180 days
#14

AIRCRAFT CRYOGENICS

see technical specification at slno 14

1 nos Delivery: 180 days
#15

AIRCRAFT DESIGN 2 VOLS PAPERS PRESENTED AT THE AIAA SCITECH FORUM AND EXPOSITION 2025

see technical specification at slno 15

1 nos Delivery: 180 days
#16

AIRCRAFT DIGITAL ELECTRONIC AND COMPUTER SYSTEMS

see technical specification at slno 16

1 nos Delivery: 180 days
#17

AIRCRAFT PROPULSION TOWARD NET ZERO AVIATION

see technical specification at slno 17

1 nos Delivery: 180 days
#18

AVIATION SAFETY AND SECURITY UTILIZING TECHNOLOGY TO PREVENT AIRCRAFT FATALITY

see technical specification at slno 18

1 nos Delivery: 180 days
#19

BLADE ELEMENT ROTOR THEORY

see technical specification at slno 19

1 nos Delivery: 180 days
#20

CLEARANCE OF FLIGHT CONTROL LAWS OPTIMAL CONTROL APPROACH

see technical specification at slno 20

1 nos Delivery: 180 days
#21

DEFENCE OFFSETS AND THE GLOBAL ARMS TRADE EXPLAINING CROSS NATIONAL VARIATIONS

see technical specification at slno 21

1 nos Delivery: 180 days
#22

DERIVATIVE FREE ADAPTIVE CONTROL

see technical specification at slno 22

1 nos Delivery: 180 days
#23

DRONES AND GLOBAL ORDER IMPLICATIONS OF REMOTE WARFARE FOR INTERNATIONAL SOCIETY

see technical specification at slno 23

1 nos Delivery: 180 days
#24

EXPERIMENTAL STATISTICS AND DATA ANALYSIS FOR MECHANICAL AND AEROSPACE ENGINEERS

see technical specification at slno 24

1 nos Delivery: 180 days
#25

FAILURE IN AIRCRAFT MATERIALS

see technical specification at slno 25

1 nos Delivery: 180 days
#26

FLAPPING WING VEHICLES NUMERICAL AND EXPERIMENTAL APPROACH

see technical specification at slno 26

1 nos Delivery: 180 days
#27

FLIGHT TESTING PAPERS PRESENTED AT THE AIAA SCITECH FORUM AND EXPOSITION 2025

see technical specification at slno 27

1 nos Delivery: 180 days
#28

FORMATION TRACKING CONTROL FOR HETEROGENEOUS SWARM SYSTEMS

see technical specification at slno 28

1 nos Delivery: 180 days
#29

FUNDAMENTALS AND AEROSPACE APPLICATIONS OF PRESCRIBED PERFORMANCE CONTROL

see technical specification at slno 29

1 nos Delivery: 180 days
#30

GAMERA A HUMAN POWERED HELICOPTER IN PURSUIT OF AN AVIATION MILESTONE

see technical specification at slno 30

1 nos Delivery: 180 days
#31

HISTORY AND DEVELOPMENT OF AIRLINE CABIN SAFETY

see technical specification at slno 31

1 nos Delivery: 180 days
#32

HUMAN FACTORS ON THE FLIGHT DECK A PRACTICAL GUIDE FOR DESIGN MODELLING AND EVALUATION

see technical specification at slno 32

1 nos Delivery: 180 days
#33

HYBRID ENERGY CUTTING OF AEROSPACE ALLOYS

see technical specification at slno 33

1 nos Delivery: 180 days
#34

INTERNATIONAL COOPERATION IN THE AEROSPACE INDUSTRY ECONOMICS POLITICS ORGANIZATION AND MANAGEMENT OF TECHNOLOGY

see technical specification at slno 34

1 nos Delivery: 180 days
#35

JANES AERO ENGINES 2025 26

see technical specification at slno 35

1 nos Delivery: 180 days
#36

JANES FLIGHT AVIONICS 2025 26

see technical specification at slno 36

1 nos Delivery: 180 days
#37

JANES SIMULATION AND TRAINING SYSTEMS YEARBOOK 2025 26

see technical specification at slno 37

1 nos Delivery: 180 days
#38

JET SENSE THE PHILOSOPHY AND THE ART OF JET TRANSPORT DESIGN

see technical specification at slno 38

1 nos Delivery: 180 days
#39

MACHINE LEARNING FOR DRONE ENABLED IOT NETWORKS OPPORTUNITIES DEVELOPMENTS AND TRENDS

see technical specification at slno 39

1 nos Delivery: 180 days
#40

MASTER AIRLINE PILOT APPLYING HUMAN FACTORS TO REACH PEAK PERFORMANCE AND OPERATIONAL RESILIENCE

see technical specification at slno 40

1 nos Delivery: 180 days
#41

MATHEMATICAL MODELLING OF AEROSPACE DYNAMIC SYSTEMS WITH PRACTICAL APPLICATIONS

see technical specification at slno 41

1 nos Delivery: 180 days
#42

MOTION AND GESTURE SENSING WITH RADAR

see technical specification at slno 42

1 nos Delivery: 180 days
#43

MULTI UAV PLANNING AND TASK ALLOCATION

see technical specification at slno 43

1 nos Delivery: 180 days
#44

NANOMATERIALS FOR DEFENSE AERONAUTICAL AND AEROSPACE APPLICATIONS

see technical specification at slno 44

1 nos Delivery: 180 days
#45

OPTIMAL TRAJECTORY ESTIMATION FOR MISSILE DEFENSE APPLICATIONS

see technical specification at slno 45

1 nos Delivery: 180 days
#46

OPTIMIZING SMALL MULTI ROTOR UNMANNED AIRCRAFT A PRACTICAL DESIGN GUIDE

see technical specification at slno 46

1 nos Delivery: 180 days
#47

PRESSURE ACTUATED CELLULAR STRUCTURES FOR ADAPTIVE WINGTIPS

see technical specification at slno 47

1 nos Delivery: 180 days
#48

PROCEEDINGS OF THE 1ST INTERNATIONAL CONFERENCE ON ADVANCES IN AEROSPACE AND NAVIGATION SYSTEMS 2024

see technical specification at slno 48

1 nos Delivery: 180 days
#49

PROCEEDINGS OF THE 7TH CHINA AERONAUTICAL SCIENCE AND TECHNOLOGY CONFERENCE

see technical specification at slno 49

1 nos Delivery: 180 days
#50

ROTATION SEQUENCES AND THE THEORY OF VECTORS AND COORDINATES

see technical specification at slno 50

1 nos Delivery: 180 days
#51

SENSORS AND INSTRUMENTATION AND AIRCRAFT AEROSPACE TESTING TECHNIQUES VOL 8 PROCEEDINGS OF THE 42ND IMAC ACONFERENCE AND EXPOSITION ON STRUCTURAL DYNAMICS 2024

see technical specification at slno 51

1 nos Delivery: 180 days
#52

SIGNAL DESIGN FOR MODERN RADAR SYSTEMS

see technical specification at slno 52

1 nos Delivery: 180 days
#53

SUPERSONIC EFFECTS ON RIVETS

see technical specification at slno 53

1 nos Delivery: 180 days
#54

SUSTAINABLE AVIATION FUELS RECENT ADVANCES AND FUTURE CHALLENGES

see technical specification at slno 54

1 nos Delivery: 180 days
#55

THE LEGITIMACY OF DRONE WARFARE EVALUATING PUBLIC PERCEPTIONS

see technical specification at slno 55

1 nos Delivery: 180 days
#56

THE RAH 66 COMANCHE HELICOPTER TECHNICAL ACCOMPLISHMENT PROGRAM FRUSTRATION

see technical specification at slno 56

1 nos Delivery: 180 days
#57

THROUGH OPTIMIZATION OF AEROSPACE VEHICLE TRAJECTORIES BY THE PONTRYAGIN MAXIMUM PRINCIPLE

see technical specification at slno 57

1 nos Delivery: 180 days
#58

UNIQUE AND TRANSFORMATIONAL FLIGHT SYSTEMS PAPERS PRESENTED AT THE AIAA SCITECH FORUM AND EXPOSITION 2025

see technical specification at slno 58

1 nos Delivery: 180 days
#59

UNMANNED AIRCRAFT DESIGN A REVIEW OF FUNDAMENTALS

see technical specification at slno 59

1 nos Delivery: 180 days
#60

STRUCTURAL HEALTH MONITORING WITH PIEZOELECTRIC WAFER ACTIVE SENSORS

see technical specification at slno 60

1 nos Delivery: 180 days
#61

DEVELOPMENT HISTORY OF THE GAS TURBINE TECHNOLOGY FOR AIR LAND AND SEA

see technical specification at slno 61

1 nos Delivery: 180 days
#62

SYSTEMS ENGINEERING FOR COMMERCIAL AIRCRAFT A DOMAIN SPECIFIC ADAPTATION

see technical specification at slno 62

1 nos Delivery: 180 days
#63

SOFTWARE TESTING A CRAFTSMAN S APPROACH

see technical specification at slno 63

1 nos Delivery: 180 days
#64

AN INTRODUCTION TO PASSIVE RADAR

see technical specification at slno 64

1 nos Delivery: 180 days
#65

CHIPLESS RFID SYSTEMS USING ADVANCED ARTIFICIAL INTELLIGENCE

see technical specification at slno 65

1 nos Delivery: 180 days
#66

COMPLEX SYSTEMS ENGINEERING THEORY AND PRACTICE

see technical specification at slno 66

1 nos Delivery: 180 days
#67

COMPUTATIONAL FLUID FLOW AND HEAT TRANSFER ADVANCES DESIGN CONTROL AND APPLICATIONS

see technical specification at slno 67

1 nos Delivery: 180 days
#68

EXACTLY HOW PRECISION ENGINEERS CREATED THE MODERN WORLD

see technical specification at slno 68

1 nos Delivery: 180 days
#69

EXPLAINABLE ARTIFICIAL INTELLIGENCE FOR AUTONOMOUS VEHICLES CONCEPTS CHALLENGES AND APPLICATIONS

see technical specification at slno 69

1 nos Delivery: 180 days
#70

FLEXIBLE SENSORS MATERIALS DEVICES AND APPLICATIONS

see technical specification at slno 70

1 nos Delivery: 180 days
#71

FREQUENCY DOMAIN NONLINEAR VIBRATION FEATURES FOR FAULT DIAGNOSIS IN COMPLEX STRUCTURES

see technical specification at slno 71

1 nos Delivery: 180 days
#72

INTEGRATING ARTIFICIAL AND HUMAN INTELLIGENCE THROUGH AGENT ORIENTED SYSTEMS DESIGN

see technical specification at slno 72

1 nos Delivery: 180 days
#73

INTRODUCTION TO ANTENNAS AND RF PROPAGATION ANALYSIS

see technical specification at slno 73

1 nos Delivery: 180 days
#74

INTRODUCTION TO SYNTHETIC APERTURE RADAR USING PYTHON AND MATLAB

see technical specification at slno 74

1 nos Delivery: 180 days
#75

LATEST TRENDS IN ENGINEERING AND TECHNOLOGY

see technical specification at slno 75

1 nos Delivery: 180 days
#76

LAYOUT TECHNIQUES FOR INTEGRATED CIRCUIT DESIGNERS

see technical specification at slno 76

1 nos Delivery: 180 days
#77

MACHINERYS HANDBOOK LARGE PRINT

see technical specification at slno 77

1 nos Delivery: 180 days
#78

MAINTENANCE AND RELIABILITY BEST PRACTICES

see technical specification at slno 78

1 nos Delivery: 180 days
#79

MULTIFIDELITY MODELING IN VIBRATION ANALYSIS

see technical specification at slno 79

1 nos Delivery: 180 days
#80

OPTIMAL EVENT TRIGGERED CONTROL USING ADAPTIVE DYNAMIC PROGRAMMING

see technical specification at slno 80

1 nos Delivery: 180 days
#81

THE STOREROOM ROADMAP 32 PROCESSES FOR EFFICIENCY AND SUSTAINABILITY

see technical specification at slno 81

1 nos Delivery: 180 days
#82

THEORY AND PRACTICE OF DECISION MAKING IN REGULATION DIAGNOSTICS AND RELIABILITY OF MACHINES

see technical specification at slno 82

1 nos Delivery: 180 days
#83

BLOCKCHAIN FOR INDUSTRY 4 EMERGENCE CHALLENGES AND OPPORTUNITIES

see technical specification at slno 83

1 nos Delivery: 180 days
#84

INTELLIGENT ANALYTICS FOR INDUSTRY 4 APPLICATIONS

see technical specification at slno 84

1 nos Delivery: 180 days
#85

RECENT TRENDS AND BEST PRACTICES IN INDUSTRY 4

see technical specification at slno 85

1 nos Delivery: 180 days
#86

AI DRIVEN IOT SYSTEMS FOR INDUSTRY 4

see technical specification at slno 86

1 nos Delivery: 180 days
#87

INDUSTRY 6 TECHNOLOGY PRACTICES CHALLENGES AND APPLICATIONS

see technical specification at slno 87

1 nos Delivery: 180 days
#88

ROBOTIC PROCESS AUTOMATION TECHNOLOGY IN SUPPLY CHAIN MANAGEMENT PRACTICAL APPLICATIONS FOR SIMPLIFYING WORKFLOWS

see technical specification at slno 88

1 nos Delivery: 180 days
#89

SMART MANUFACTURING TECHNOLOGIES FOR INDUSTRY 4 INTEGRATION BENEFITS AND OPERATIONAL ACTIVITIES

see technical specification at slno 89

1 nos Delivery: 180 days
#90

THE CNC HANDBOOK DIGITAL MANUFACTURING AND AUTOMATION FROM CNC TO INDUSTRY 4

see technical specification at slno 90

1 nos Delivery: 180 days
#91

APPLICATIONS AND CHALLENGES OF MAINTENANCE AND SAFETY ENGINEERING IN INDUSTRY 4

see technical specification at slno 91

1 nos Delivery: 180 days
#92

GEARBOX VIBRATIONS ANALYSIS AND REDUCTION

see technical specification at slno 92

1 nos Delivery: 180 days
#93

3D PRINTING AND SUSTAINABLE PRODUCT DEVELOPMENT

see technical specification at slno 93

1 nos Delivery: 180 days
#94

HANDBOOK OF RESEARCH ON AI AND ML FOR INTELLIGENT MACHINES AND SYSTEMS

see technical specification at slno 94

1 nos Delivery: 180 days
#95

INDUSTRY 4 AND ADVANCED MANUFACTURING VOLUME 1

see technical specification at slno 95

1 nos Delivery: 180 days
#96

INDUSTRY 4 AND ADVANCED MANUFACTURING VOLUME 2

see technical specification at slno 96

1 nos Delivery: 180 days
#97

PRACTICAL HEAT TREATING PROCESSES AND PRACTICES

see technical specification at slno 97

1 nos Delivery: 180 days
#98

SUSTAINABILITY IN SMART MANUFACTURING TRENDS SCOPE AND CHALLENGES

see technical specification at slno 98

1 nos Delivery: 180 days
#99

SAMPE CONFERENCE AND EXHIBITION 2024 3 VOLS

see technical specification at slno 99

1 nos Delivery: 180 days
#100

PHILOSOPHIES OF STRUCTURAL SAFETY AND RELIABILITY

see technical specification at slno 100

1 nos Delivery: 180 days
#101

AN INTRODUCTION TO PARALLEL PROGRAMMING

see technical specification at slno 101

1 nos Delivery: 180 days
#102

A 360 DEGREE VIEW OF IOT TECHNOLOGIES

see technical specification at slno 102

1 nos Delivery: 180 days
#103

BIG DATA AND EDGE INTELLIGENCE FOR ENHANCED CYBER DEFENSE PRINCIPLES AND RESEARCH

see technical specification at slno 103

1 nos Delivery: 180 days
#104

CYBERWARFARE AN INTRODUCTION TO INFORMATION AGE CONFLICT

see technical specification at slno 104

1 nos Delivery: 180 days
#105

INFORMATION TECHNOLOGY SECURITY AND RISK MANAGEMENT INDUCTIVE CASES FOR INFORMATION SECURITY

see technical specification at slno 105

1 nos Delivery: 180 days
#106

MACHINE LEARNING WITH PYTHON PRINCIPLES AND PRACTICAL TECHNIQUES

see technical specification at slno 106

1 nos Delivery: 180 days
#107

GUIDE TO PROJECT MANAGEMENT BODY OF KNOWLEDGE PMBOK GUIDE AND STANDARD FOR PROJECT MANAGEMENT ANI PMI 99 001 2021

see technical specification at slno 107

1 nos Delivery: 180 days
#108

RITA MULCAHYS PMP EXAM PREP

see technical specification at slno 108

1 nos Delivery: 180 days
#109

THE POWER OF MATTERING HOW LEADERS CAN CREATE A CULTURE OF SIGNIFICANCE

see technical specification at slno 109

1 nos Delivery: 90 days
#110

AI FIRST THE PLAYBOOK FOR A FUTURE PROOF BUSINESS AND BRAND

see technical specification at slno 110

1 nos Delivery: 90 days
#111

GRIT THE POWER OF PASSION AND PERSEVERANCE

see technical specification at slno 111

1 nos Delivery: 90 days
#112

ORGANIZATION WIDE PHYSICAL ASSET MANAGEMENT A SYSTEMS APPROACH

see technical specification at slno 112

1 nos Delivery: 90 days
#113

THERE IS NOTHING LIKE THIS THE STRATEGIC GENIUS OF TAYLOR SWIFT

see technical specification at slno 113

1 nos Delivery: 90 days
#114

NAGROTA UNDER SIEGE

see technical specification at slno 114

1 nos Delivery: 90 days
#115

LIVE WHILE YOU ARE ALIVE OVERCOME STRESS AND LIVE A MEANINGFUL LIFE

see technical specification at slno 115

1 nos Delivery: 90 days
#116

SING DANCE AND PRAY THE INSPIRATIONAL STORY OF SRILA PRABHUPADA FOUNDER ACHARYA OF ISKCON

see technical specification at slno 116

1 nos Delivery: 90 days
#117

HEART LAMP

see technical specification at slno 117

1 nos Delivery: 90 days
#118

OPEN WHEN A COMPANION FOR LIFES TWISTS AND TURNS

see technical specification at slno 118

1 nos Delivery: 90 days
#119

THE ART OF LETTING GO MOVE BEYOND THE HURT FIND EMOTIONAL FREEDOM AND RESTORE YOUR INNER PEACE

see technical specification at slno 119

1 nos Delivery: 90 days
#120

THE LET THEM THEORY A LIFE CHANGING TOOL THAT MILLIONS OF PEOPLE CAN T STOP TALKING ABOUT

see technical specification at slno 120

1 nos Delivery: 90 days
#121

THE NOT TO DO LIST THE LIFE CHANGING INSTANT BESTSELLER FROM THE AUTHOR OF THE ART OF THINKING CLEARLY

see technical specification at slno 121

1 nos Delivery: 90 days
#122

NIRMALA HINDI

see technical specification at slno 122

1 nos Delivery: 90 days
#123

CHANAKYA NEETI HINDI

see technical specification at slno 123

1 nos Delivery: 90 days
#124

JEEVAN KE ANJANE SABAK EK AATMAKATHA HINDI

see technical specification at slno 124

1 nos Delivery: 90 days
#125

MUJHE CHAND CHAHIYE HINDI

see technical specification at slno 125

1 nos Delivery: 90 days
#126

KHAIYE AUR VAJAN GHATAIYE HINDI

see technical specification at slno 126

1 nos Delivery: 90 days
#127

DARK HORSE EK ANKAHI DASTAN HINDI

see technical specification at slno 127

1 nos Delivery: 90 days
#128

KITNE PAKISTAN HINDI

see technical specification at slno 128

1 nos Delivery: 90 days
#129

THE WHITE TIGER HINDI

see technical specification at slno 129

1 nos Delivery: 90 days
#130

MUSAFIR CAFE HINDI

see technical specification at slno 130

1 nos Delivery: 90 days
#131

DOPEHARI HINDI

see technical specification at slno 131

1 nos Delivery: 90 days
#132

CHAURASI HINDI

see technical specification at slno 132

1 nos Delivery: 90 days
#133

GANDHIJI SAMAGRA DHARSHANA KANNADA

see technical specification at slno 133

1 nos Delivery: 90 days
#134

GOKAKARA NATAKAGALU KANNADA

see technical specification at slno 134

1 nos Delivery: 90 days
#135

HAREYADAVARA MANOLO KAKANNADA

see technical specification at slno 135

1 nos Delivery: 90 days
#136

LOKA KATHANA SAHITYA PRABANDHAGALU KANNADA

see technical specification at slno 136

1 nos Delivery: 90 days
#137

SAMAGRA AROGYAKKE SAMRUDHA VAIDYA SAAHITYA KANNADA

see technical specification at slno 137

1 nos Delivery: 90 days
#138

SWAMI VIVEKANANDA VYAKTITVADA NAIJA ANAAVARANA KANNADA

see technical specification at slno 138

1 nos Delivery: 90 days
#139

VIJNANA DEEPAGALU KANNADA

see technical specification at slno 139

1 nos Delivery: 90 days
#140

YERUGHATTADA NADIGE KANNADA

see technical specification at slno 140

1 nos Delivery: 90 days
#141

PRINCIPLES OF OPERATIONS MANAGEMENT SUSTAINABILITY AND SUPPLY CHAIN MANAGEMENT

see technical specification at slno 141

1 nos Delivery: 180 days
#142

A PRACTICAL GUIDE TO DESIGN FOR ADDITIVE MANUFACTURING

see technical specification at slno 142

1 nos Delivery: 180 days
#143

INTERNET OF THINGS A HANDS ON APPROACH

see technical specification at slno 143

1 nos Delivery: 180 days
#144

OPTIMIZATION OF MANUFACTURING SYSTEMS USING THE INTERNET OF THINGS

see technical specification at slno 144

1 nos Delivery: 180 days
#145

PRECISION MANUFACTURING

see technical specification at slno 145

1 nos Delivery: 180 days

Reverse Auction Schedule

Completed

Start

18-Nov-2025, 11:00 am

End

20-Nov-2025, 2:00 pm

Duration: 51 hours

Reverse Auction Document

✅ RA concluded. Check financial results for final rankings.

Technical Results

S.No Seller Item Date Status
1
**********   Under PMA
-10-10-2025 12:18:29
2
**********   Under PMA
-17-10-2025 09:26:02
3
**********   Under PMA
-17-10-2025 10:43:58
4
**********   Under PMA
-17-10-2025 09:16:22
5
**********   Under PMA
-17-10-2025 07:15:19
6
**********   Under PMA
-16-10-2025 18:25:57
7
**********   Under PMA
-16-10-2025 16:31:21
8
**********   Under PMA
-14-10-2025 15:51:26
9
**********   Under PMA
-17-10-2025 11:34:57
10
**********   Under PMA
-17-10-2025 13:32:26
11
**********   Under PMA
-17-10-2025 10:55:02
12
**********   Under PMA
-17-10-2025 13:59:52