TenderDekho Logo
Closed GEM

Indian Army Bathinda Bathroom Fixtures Tender 2026 IS 8931 IS 9763 ISO 9001 Compliant

Bid Publish Date

03-Oct-2026, 1:53 pm

Bid End Date

15-Oct-2026, 2:00 pm

Progress

Issue03-Oct-2026, 1:53 pm
AwardPending

Key Highlights

  • • IS 8931 and IS 9763 compliance for taps/valves and related fixtures
  • • IS 778 copper alloy gate valves specification reference
  • • ISO 9001 certification mandatory for bidder or OEM
  • • Option clause allowing up to 25% quantity variation during contract

Tender Overview

The Indian Army, Department Of Military Affairs, seeks procurement of bathroom fittings and related fixtures for the Bathinda, Punjab location. The scope references copper alloy taps/stop valves conforming to IS 8931 (Q3), plastic bib taps, pillar taps, angle valves & stop valves for hot & cold water (IS 8931), towel rails, connector pipes for washbasins/sinks/geyser, and copper alloy gate valves for waterworks (IS 778, Q3/Q2). Estimated quantity and value are not disclosed. Delivery obligations include an option to increase quantity by up to 25% at contracted rates, with delivery time adjustments based on proportional quantity changes and a minimum 30-day extension. ISO 9001 certification is mandatory for bidders or OEMs. The contract includes NDA requirements and specific past-experience proof accepted via contracts, execution certificates, or client-issued documents.

Key Specifications

  • IS 8931: copper alloy taps/stop valves conforming to Q3

  • IS 9763: bathroom fittings conforming to Q3

  • IS 778: copper alloy gate valves for waterworks

  • Towel rail, connector pipes for washbasins/sinks/geyser

  • Plastic bib taps, pillar taps, angle valves & stop valves for hot & cold water

Terms & Conditions

  • Option Clause: +25% quantity at contracted rates

  • ISO 9001 certification mandatory for bidder or OEM

  • ND Declaration required with bid

  • Warranty as per installation/acceptance date

  • Past experience proofs acceptable via contracts or client docs

Important Clauses

Payment Terms

Payment terms to be specified in bid documents; verify milestone-based payments aligned to delivery/installation.

Delivery Schedule

Delivery period starts from last date of original delivery order; option-based extension with minimum 30 days.

Penalties/Liquidated Damages

Penalties or LD terms to be defined in contract; reference IS standards and delivery schedules.

Bidder Eligibility

  • Must hold ISO 9001 certification (bidder or OEM)

  • Demonstrated past experience with similar bathroom fittings or valves

  • Capability to supply IS 8931/IS 9763/IS 778 compliant products

Advertisement

Authority & Contact

Organization

Indian Army

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Tender Data

Bid Details

Quantity

3689

Category

PLASTIC BIB TAPS, PILLAR TAPS, ANGLE VALVES & STOP VALVES FOR HOT & COLD WATER SERVICES Conforming to IS 9763

Bid Type

Two Packet Bid

Bid Validity

120 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

H1-Highest Priced Bid Elimination

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

Yes

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

12

OEM Avg. Turnover

100

Past Performance

50 %

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

Bathroom or Toilet Mirror (V3) (Q4) , Copper alloy Taps/Stop Valves (V2) Conforming to IS 8931 (Q3) , PLASTIC BIB TAPS, PILLAR TAPS, ANGLE VALVES & STOP VALVES FOR HOT & COLD WATER SERVICES Conforming to IS 9763 (Q3) , Towel Rail (Q3) , Connector Pipes for Washbasins/ Sinks/ Geyser (Q3) , Copper Alloy Gate Valve For Waterworks Purpose (V2) Conforming to IS 778 (Q3)

Advisory Bank

State Bank of India

ePBG Percentage

3%

ePBG Duration (Months)

14

Delivery Details

Max Delivery Days

25

Delivery Locations

2

Delivery Cities

Bathinda

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-BathindaBathinda--5025-
-BathindaBathinda--5025-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 2

GeM-Bidding-9921056.pdf

Main Document

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Categories 29

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

ISO 9001 certificate (bidder or OEM)

4

Past experience proof: contract copies, invoices with self-certification, client execution certificate

5

ND Declaration on bidder letterhead

6

Technical bid documents and any OEM authorization

7

Any other certificates requested in ATC/Corrigendum

8

EMD submission documents (as applicable per bid)

Frequently Asked Questions

Key insights about PUNJAB tender market

How to bid in Bathinda bathroom fittings tender for Indian Army?

Bidders must submit ISO 9001 certification, Non-Disclosure Declaration, and past-experience proofs (contracts or client certificates). Ensure IS 8931/IS 9763/IS 778 compliance, provide NDA-compliant documents, and prepare for potential up to 25% quantity variation with corresponding delivery adjustments.

What documents are required for IS standards bathroom tender in Bathinda?

Required documents include GST certificate, PAN, ISO 9001 certificate (bidder or OEM), past-experience proofs (contracts, invoices, client certificates), Non-Disclosure Declaration, OEM authorizations if applicable, and technical bid documents; ensure all ATC requirements are satisfied.

What are the technical standards for taps and valves in this Bathinda tender?

Taps/valves must comply with IS 8931 (Q3) for copper alloy fittings and IS 778 for copper alloy gate valves; additional components include IS 9763 conforming products; ensure all components are IS-certified and tested before delivery.

When is the delivery timeline for Bathinda Army bathroom fixtures?

Delivery extends from the last date of the original delivery order; if quantity increases by up to 25%, the extension is calculated as (additional quantity/original quantity) × original delivery period with a minimum of 30 days.

What is required for warranty and post-installation support?

Warranty is as per the supplier’s specifications once final acceptance or commissioning is completed; ensure coverage for defects and timely service under AMC terms, if applicable, and document warranty duration clearly in bid.

What is the role of NDA in the Bathinda bathroom fixtures bid?

An ND declaration on bidder letterhead must be uploaded; it prohibits disclosure of contract specifics, design plans, or any provided information to third parties during and after the contract period.

What qualifies as past project experience for eligibility?

Accepted proofs include contract copies with invoices and self-certification, execution certificates from clients, or third-party inspection release notes; these demonstrate supply or service execution for similar bathroom fittings projects.

How does ISO 9001 impact eligibility for this Army procurement?

ISO 9001 certification is mandatory for bidders or OEMs; non-compliance leads to rejection. Ensure current certification documents are uploaded with the bid and maintained throughout the contract term.

Advertisement