TenderDekho Logo
Closed GEM

Open Tender for 520900050000 OIL CAN TOOL KIT IX BD80,520900070000 SCREW DRIVER 5X75MM TOOL KIT IX BD80,11Z7180235K in WEST DELHI, DELHI

Bid Publish Date

20-Feb-2026, 12:51 pm

Bid End Date

12-Mar-2026, 1:00 pm

EMD

₹13

Generate Docs

Progress

RA
Issue20-Feb-2026, 12:51 pm
Reverse Auction24-Mar-2026, 3:00 pm
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

4740

Category

520900050000 OIL CAN TOOL KIT IX BD80

Bid Type

Two Packet Bid

Categories 113

Indian Army has released a public tender for 520900050000 OIL CAN TOOL KIT IX BD80, 520900070000 SCREW DRIVER 5X75MM TOOL KIT IX BD80, 11Z7180235K in WEST DELHI, DELHI. Quantity: 4740. Submission Deadline: 12-03-2026 13: 00: 00. Download documents and apply online.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 6

GeM-Bidding-8920036.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 148 Items Sign in for GEM prices

#1

520900050000 OIL CAN TOOL KIT IX BD80

520900050000 OIL CAN TOOL KIT IX BD80

78 nos Delivery: 150 days
#2

520900070000 SCREW DRIVER 5X75MM TOOL KIT IX BD80

520900070000 SCREW DRIVER 5X75MM TOOL KIT IX BD80

42 nos Delivery: 150 days
#3

11Z7180235KS CARTRIDGE FUEL PRE FILTER FILTER AND PIPING IV BD80 ENG

11Z7180235KS CARTRIDGE FUEL PRE FILTER FILTER AND PIPING IV BD80 ENG

90 nos Delivery: 150 days
#4

116TF02029 1543011141 CYLINDER RECOIL SPRING IV BD80

116TF02029 1543011141 CYLINDER RECOIL SPRING IV BD80

50 nos Delivery: 150 days
#5

116AD02013 1547012114 ARM ANGLE BLADE VII BD80

116AD02013 1547012114 ARM ANGLE BLADE VII BD80

10 nos Delivery: 150 days
#6

116MC02154 1501000100 INERTIA BRAKE LEV A MAIN CLUTCH HOUSING II BD80

116MC02154 1501000100 INERTIA BRAKE LEV A MAIN CLUTCH HOUSING II BD80

10 nos Delivery: 150 days
#7

116FP11135 116FP11127 BOARD FLOOR FLOOR BOARD V BD80

116FP11135 116FP11127 BOARD FLOOR FLOOR BOARD V BD80

10 nos Delivery: 150 days
#8

110EG81218 BULB ELECTRICAL SYSTEM 2 BY 2 I BD80 BD50

110EG81218 BULB ELECTRICAL SYSTEM 2 BY 2 I BD80 BD50

22 nos Delivery: 150 days
#9

0743272100 116HM01021 STEERING PUMP ASSY

0743272100 116HM01021 STEERING PUMP ASSY

10 nos Delivery: 150 days
#10

525500000132 1545411310 COVER ENGINE HOOD AND GUARD V BD80

525500000132 1545411310 COVER ENGINE HOOD AND GUARD V BD80

10 nos Delivery: 150 days
#11

CST0113243 SOCKET 32MM

CST0113243 SOCKET 32MM

13 nos Delivery: 150 days
#12

CFN0111967 WASHER SPRING

CFN0111967 WASHER SPRING

47 nos Delivery: 150 days
#13

CFN1921411 150041411 NUT MAIN CLUTCH DISC II BD80

CFN1921411 150041411 NUT MAIN CLUTCH DISC II BD80

10 nos Delivery: 150 days
#14

33Z3100016 3033180167 RING PISTON OIL PISTON AND CONNECTING ROD II BD80 ENGINE

33Z3100016 3033180167 RING PISTON OIL PISTON AND CONNECTING ROD II BD80 ENGINE

375 nos Delivery: 150 days
#15

116TM03247 1501500801 LEVER ASSY F AND R

116TM03247 1501500801 LEVER ASSY F AND R

10 nos Delivery: 150 days
#16

116TM92607 1501412641 SEAL OIL II IX BD80

116TM92607 1501412641 SEAL OIL II IX BD80

53 nos Delivery: 150 days
#17

116MC02105 1501000061 HOUSING COVER ASSY MAIN CLUTCH HOUSING II BD80

116MC02105 1501000061 HOUSING COVER ASSY MAIN CLUTCH HOUSING II BD80

10 nos Delivery: 150 days
#18

CHS0710022 701210022 SEAL OIL II IX BD80

CHS0710022 701210022 SEAL OIL II IX BD80

38 nos Delivery: 150 days
#19

116TF7552 SEAL

116TF7552 SEAL

10 nos Delivery: 150 days
#20

116TF02086 1543011392 COVER LH TRACK FRAME COVER IV BD80

116TF02086 1543011392 COVER LH TRACK FRAME COVER IV BD80

10 nos Delivery: 150 days
#21

CFS032045 SCREW KEY

CFS032045 SCREW KEY

10 nos Delivery: 150 days
#22

116HS11699 1546012390 SPACER HYDRAULIC TANK VI BD80

116HS11699 1546012390 SPACER HYDRAULIC TANK VI BD80

10 nos Delivery: 150 days
#23

30Z5181045KS 30Z5180495KS CARTRIDGE

30Z5181045KS 30Z5180495KS CARTRIDGE

12 nos Delivery: 150 days
#24

116TM11452 COLLER

116TM11452 COLLER

10 nos Delivery: 150 days
#25

116TM41844 BODY VALVE

116TM41844 BODY VALVE

10 nos Delivery: 150 days
#26

130IP91012 ENG OIL PR GUAGE INSTRUMENT PANEL I BD80

130IP91012 ENG OIL PR GUAGE INSTRUMENT PANEL I BD80

59 nos Delivery: 150 days
#27

116TM03044 GEAR DRIVE

116TM03044 GEAR DRIVE

22 nos Delivery: 150 days
#28

116COB0012 1544400411 ACCELERATOR LEVER A ACCELERATOR LEVER I BD80

116COB0012 1544400411 ACCELERATOR LEVER A ACCELERATOR LEVER I BD80

10 nos Delivery: 150 days
#29

116FLB0018 1540400013 TANK ASSY FUEL TANK I BD80

116FLB0018 1540400013 TANK ASSY FUEL TANK I BD80

10 nos Delivery: 150 days
#30

116COB0037 1504301152 ROD AND LEVER ASSY ACCELERATOR LEVER I BD80

116COB0037 1504301152 ROD AND LEVER ASSY ACCELERATOR LEVER I BD80

10 nos Delivery: 150 days
#31

CHS0700030 701200030 SEAL OIL II IX BD80 BD50

CHS0700030 701200030 SEAL OIL II IX BD80 BD50

50 nos Delivery: 150 days
#32

CHS0700032 701200032 SEAL OIL II IX BD80

CHS0700032 701200032 SEAL OIL II IX BD80

28 nos Delivery: 150 days
#33

116EC01013 RADIATOR AND OIL COOLER ASSY

116EC01013 RADIATOR AND OIL COOLER ASSY

11 nos Delivery: 150 days
#34

116TF13289 1503015561 BOLT TRACK ROLLER GUARD IV BD80

116TF13289 1503015561 BOLT TRACK ROLLER GUARD IV BD80

219 nos Delivery: 150 days
#35

116EG02012 LAMP GUARD FRONT RH ELECTRICAL SYSTEM 1 BY 2 I BD80

116EG02012 LAMP GUARD FRONT RH ELECTRICAL SYSTEM 1 BY 2 I BD80

10 nos Delivery: 150 days
#36

116COB0126 1504301131 INTER LOCK ASSY SHIFT CONTROL II BD80

116COB0126 1504301131 INTER LOCK ASSY SHIFT CONTROL II BD80

10 nos Delivery: 150 days
#37

116TFB0092 1543000141 CYLINDER ASSY RECOIL SPRING IV BD80

116TFB0092 1543000141 CYLINDER ASSY RECOIL SPRING IV BD80

10 nos Delivery: 150 days
#38

520900000420 SPANNER TOOL KIT IX BD80

520900000420 SPANNER TOOL KIT IX BD80

10 nos Delivery: 150 days
#39

CTW0511011 30101035100 SPANNER 20X22MM TOOL KIT IX BD80

CTW0511011 30101035100 SPANNER 20X22MM TOOL KIT IX BD80

10 nos Delivery: 150 days
#40

030101038100 SPANNER 24X27MM TOOL KIT IX BD80

030101038100 SPANNER 24X27MM TOOL KIT IX BD80

10 nos Delivery: 150 days
#41

030101043100 SPANNER TOOL KIT IX BD80

030101043100 SPANNER TOOL KIT IX BD80

10 nos Delivery: 150 days
#42

030101052100 030101049100 SPANNER TOOL KIT IX BD80

030101052100 030101049100 SPANNER TOOL KIT IX BD80

12 nos Delivery: 150 days
#43

030101053100 SPANNER TOOL KIT IX BD80

030101053100 SPANNER TOOL KIT IX BD80

10 nos Delivery: 150 days
#44

88190800000 88190800001 SPANNER SET

88190800000 88190800001 SPANNER SET

10 nos Delivery: 150 days
#45

885009000001 SOCKET SET TOOL KIT IX BD80

885009000001 SOCKET SET TOOL KIT IX BD80

105 nos Delivery: 150 days
#46

142004000000 BRACE ASSY

142004000000 BRACE ASSY

10 nos Delivery: 150 days
#47

125IP01035 HRS METER

125IP01035 HRS METER

10 nos Delivery: 150 days
#48

116TM57353 FORWARD GEAR

116TM57353 FORWARD GEAR

10 nos Delivery: 150 days
#49

CHH2200628 CHH2200608 HOSE FUEL TANK I BD80

CHH2200628 CHH2200608 HOSE FUEL TANK I BD80

138 nos Delivery: 150 days
#50

900203032 SPNR OJDE 30X32MM

900203032 SPNR OJDE 30X32MM

10 nos Delivery: 150 days
#51

125HS02009 1546011391 SIGHT GAUGE HYDRAULIC TANK VI BD80

125HS02009 1546011391 SIGHT GAUGE HYDRAULIC TANK VI BD80

37 nos Delivery: 150 days
#52

116TF31643 1503014410 ROLLER CARRIER CARRIER ROLLER IV BD80

116TF31643 1503014410 ROLLER CARRIER CARRIER ROLLER IV BD80

10 nos Delivery: 150 days
#53

116FG02436 143600000003 GUARD RADIATOR ENGINE HOOD AND GUARD V BD80

116FG02436 143600000003 GUARD RADIATOR ENGINE HOOD AND GUARD V BD80

7 nos Delivery: 150 days
#54

116CD11024 182000000321 CUTTING EDGE RH

116CD11024 182000000321 CUTTING EDGE RH

10 nos Delivery: 150 days
#55

41Z3280188 GASKET FLY WHEEL AND FLYWHEEL HOUSING II BD80 ENG

41Z3280188 GASKET FLY WHEEL AND FLYWHEEL HOUSING II BD80 ENG

29 nos Delivery: 150 days
#56

113HC91235 1546111232 SEAL DUST VI IX BD80

113HC91235 1546111232 SEAL DUST VI IX BD80

10 nos Delivery: 150 days
#57

116MC11704 1501112420 SHAFT MAIN CLUTCH DRIVE SHAFT II BD80

116MC11704 1501112420 SHAFT MAIN CLUTCH DRIVE SHAFT II BD80

10 nos Delivery: 150 days
#58

116MC03061 1501011400 BAND ASSY MAIN CLUTCH HOUSING II BD80

116MC03061 1501011400 BAND ASSY MAIN CLUTCH HOUSING II BD80

49 nos Delivery: 150 days
#59

31Z1280114 VALVE EVACUATOR AIR CLEANER I BD80 ENG

31Z1280114 VALVE EVACUATOR AIR CLEANER I BD80 ENG

50 nos Delivery: 150 days
#60

116FG11338 1545411831 BOLT ENGINE HOOD AND GUARD V BD80

116FG11338 1545411831 BOLT ENGINE HOOD AND GUARD V BD80

92 nos Delivery: 150 days
#61

142202003020 1507023312 JOINT ANGLE BLADE VII BD80

142202003020 1507023312 JOINT ANGLE BLADE VII BD80

10 nos Delivery: 150 days
#62

116FG11402 1545412560 SHIM 1 POINT 0MM FENDER AND BRACKET V BD80

116FG11402 1545412560 SHIM 1 POINT 0MM FENDER AND BRACKET V BD80

30 nos Delivery: 150 days
#63

116TM41569 COVER

116TM41569 COVER

10 nos Delivery: 150 days
#64

116CV11324 1754312180 BUSHING STEERING CONTROL VALVE III BD80

116CV11324 1754312180 BUSHING STEERING CONTROL VALVE III BD80

10 nos Delivery: 150 days
#65

390701050001 SELECTOR GEAR CONTROL CABLE

390701050001 SELECTOR GEAR CONTROL CABLE

10 nos Delivery: 150 days
#66

116CO52162 1506125131 LEVER CONTROL LEVER VI BD80

116CO52162 1506125131 LEVER CONTROL LEVER VI BD80

11 nos Delivery: 150 days
#67

116EC03014 SHROUD RADIATOR PIPING AND COVER I BD80

116EC03014 SHROUD RADIATOR PIPING AND COVER I BD80

10 nos Delivery: 150 days
#68

116TM52706 1501513121 FORK GEAR SHIFT GEAR SHIFT FORK II BD80

116TM52706 1501513121 FORK GEAR SHIFT GEAR SHIFT FORK II BD80

5 nos Delivery: 150 days
#69

116CO02314 1544414231 LEVER ACCELERATOR LEVER I BD80

116CO02314 1544414231 LEVER ACCELERATOR LEVER I BD80

10 nos Delivery: 150 days
#70

116PH02035 1546121292 TUBE HYDRAULIC PIPING 2 BY 3 VI BD80

116PH02035 1546121292 TUBE HYDRAULIC PIPING 2 BY 3 VI BD80

10 nos Delivery: 150 days
#71

881908000001 SPANNER SET TOOL KIT IX BD80

881908000001 SPANNER SET TOOL KIT IX BD80

10 nos Delivery: 150 days
#72

520900000920 PINCH BAR TOOL KIT IX BD80

520900000920 PINCH BAR TOOL KIT IX BD80

31 nos Delivery: 150 days
#73

985HM61046 O RING HYDRAULIC PUMP VI BD80

985HM61046 O RING HYDRAULIC PUMP VI BD80

120 nos Delivery: 150 days
#74

116CV19054 PLATE QUICK DROP VALVE VI BD80

116CV19054 PLATE QUICK DROP VALVE VI BD80

23 nos Delivery: 150 days
#75

CFP0101012 405001012 PIN COTTER GEAR SHIFT LEVER II BD80

CFP0101012 405001012 PIN COTTER GEAR SHIFT LEVER II BD80

19 nos Delivery: 150 days
#76

116CO02022 1504332172 LEVER SHIFT CONTROL II BD80

116CO02022 1504332172 LEVER SHIFT CONTROL II BD80

10 nos Delivery: 150 days
#77

116EC03063 GRILL RADIATOR PIPING AND COVER I BD80

116EC03063 GRILL RADIATOR PIPING AND COVER I BD80

10 nos Delivery: 150 days
#78

116EC03055 GRILL RADIATOR PIPING AND COVER I BD80

116EC03055 GRILL RADIATOR PIPING AND COVER I BD80

10 nos Delivery: 150 days
#79

116EC03047 GRILL RADIATOR PIPING AND COVER I BD80

116EC03047 GRILL RADIATOR PIPING AND COVER I BD80

10 nos Delivery: 150 days
#80

116EC03039 GRILL RADIATOR PIPING AND COVER I BD80

116EC03039 GRILL RADIATOR PIPING AND COVER I BD80

10 nos Delivery: 150 days
#81

116EC03022 GRILL RADIATOR PIPING AND COVER I BD80

116EC03022 GRILL RADIATOR PIPING AND COVER I BD80

10 nos Delivery: 150 days
#82

125PO02126 TUBE ASSY POWER TAKE OFF I BD80

125PO02126 TUBE ASSY POWER TAKE OFF I BD80

10 nos Delivery: 150 days
#83

125PO02118 TUBE ASSY POWER TAKE OFF I BD80

125PO02118 TUBE ASSY POWER TAKE OFF I BD80

10 nos Delivery: 150 days
#84

125PO02101 TUBE ASSY POWER TAKE OFF I BD80

125PO02101 TUBE ASSY POWER TAKE OFF I BD80

10 nos Delivery: 150 days
#85

CBB4006212 BEARING POWER TAKE OFF I BD80

CBB4006212 BEARING POWER TAKE OFF I BD80

10 nos Delivery: 150 days
#86

125PO91235 BEARING POWER TAKE OFF I BD80

125PO91235 BEARING POWER TAKE OFF I BD80

5 nos Delivery: 150 days
#87

640000200204 ELBOW INSTRUMENT PANEL I BD80

640000200204 ELBOW INSTRUMENT PANEL I BD80

52 nos Delivery: 150 days
#88

116CO11621 1544441160 ROD ACCELERATOR LEVER I BD80

116CO11621 1544441160 ROD ACCELERATOR LEVER I BD80

10 nos Delivery: 150 days
#89

CES0112420 SWITCH LIGHT INSTRUMENT PANEL I BD80

CES0112420 SWITCH LIGHT INSTRUMENT PANEL I BD80

60 nos Delivery: 150 days
#90

116IP21006 145200010132 INSTRUMENT PANEL INSTRUMENT PANEL I BD80

116IP21006 145200010132 INSTRUMENT PANEL INSTRUMENT PANEL I BD80

10 nos Delivery: 150 days
#91

116CO11832 1504334112 SHAFT ACCELERATOR LEVER I BD80

116CO11832 1504334112 SHAFT ACCELERATOR LEVER I BD80

10 nos Delivery: 150 days
#92

135EG91094 CLAMP ELECTRICAL SYSTEM 2 BY 2 I BD80

135EG91094 CLAMP ELECTRICAL SYSTEM 2 BY 2 I BD80

120 nos Delivery: 150 days
#93

116EI11099 SHIM ENGINE ATT PARTS I BD80

116EI11099 SHIM ENGINE ATT PARTS I BD80

12 nos Delivery: 150 days
#94

125DZ21234 194301003341 NAME PLATE DECAL V BD80

125DZ21234 194301003341 NAME PLATE DECAL V BD80

10 nos Delivery: 150 days
#95

116FG21033 144300001140 NAME PLATE DECAL V BD80

116FG21033 144300001140 NAME PLATE DECAL V BD80

10 nos Delivery: 150 days
#96

116MC11989 PIN

116MC11989 PIN

16 nos Delivery: 150 days
#97

640000378703 CYLINDER FIRE EXTINGUISHER V BD80

640000378703 CYLINDER FIRE EXTINGUISHER V BD80

78 nos Delivery: 150 days
#98

116TM03069 GEAR DRIVEN 4TH

116TM03069 GEAR DRIVEN 4TH

10 nos Delivery: 150 days
#99

CFN4211619 NUT

CFN4211619 NUT

10 nos Delivery: 150 days
#100

116TM51661 GEAR DRIVEN 1ST

116TM51661 GEAR DRIVEN 1ST

10 nos Delivery: 150 days
#101

30Z3240909 FLYWHEEL ENGINE

30Z3240909 FLYWHEEL ENGINE

5 nos Delivery: 150 days
#102

30Z5120254 COVER LUBRICATING OIL COOLER III BD80 ENGINE

30Z5120254 COVER LUBRICATING OIL COOLER III BD80 ENGINE

8 nos Delivery: 150 days
#103

31Z9900313 01 CYLINDER BLOCK GASKET KIT

31Z9900313 01 CYLINDER BLOCK GASKET KIT

27 nos Delivery: 150 days
#104

30Z8280705 HEATER AIR INTAKE MANIFOLD I BD80 ENG

30Z8280705 HEATER AIR INTAKE MANIFOLD I BD80 ENG

5 nos Delivery: 150 days
#105

30Z6140628 HOUSING THERMOSTAT WATER MANIFOLD AND THERMOSTAT I BD80 ENG

30Z6140628 HOUSING THERMOSTAT WATER MANIFOLD AND THERMOSTAT I BD80 ENG

10 nos Delivery: 150 days
#106

31Z5120235 31Z5100082 HEAD OIL FILTER LUBRICATING OIL FILTER III BD80 ENG

31Z5120235 31Z5100082 HEAD OIL FILTER LUBRICATING OIL FILTER III BD80 ENG

10 nos Delivery: 150 days
#107

30Z7181762 FLEX PLATE ASSEMBLY

30Z7181762 FLEX PLATE ASSEMBLY

10 nos Delivery: 150 days
#108

31Z1280406 31Z1280414 AIR CLEANER AIR CLEANER I BD80 ENG

31Z1280406 31Z1280414 AIR CLEANER AIR CLEANER I BD80 ENG

16 nos Delivery: 150 days
#109

30Z4100026 LEVER ASSY CAMSHAFT AND TAPPET II BD80 ENG

30Z4100026 LEVER ASSY CAMSHAFT AND TAPPET II BD80 ENG

10 nos Delivery: 150 days
#110

30Z7111891 NOZZLE HOLDER ASSY NOZZLE FUEL INJECTION PUMP IV BD80 ENG

30Z7111891 NOZZLE HOLDER ASSY NOZZLE FUEL INJECTION PUMP IV BD80 ENG

46 nos Delivery: 150 days
#111

30Z7111923 NOZZLE NOZZLE FUEL INJECTION PUMP IV BD80 ENG

30Z7111923 NOZZLE NOZZLE FUEL INJECTION PUMP IV BD80 ENG

468 nos Delivery: 150 days
#112

30Z2300011 GEAR ASSY FRONT COVER AND SUPPORT II BD80 ENGINE

30Z2300011 GEAR ASSY FRONT COVER AND SUPPORT II BD80 ENGINE

10 nos Delivery: 150 days
#113

727111445 HOSE FIP VALVE PORT 4 AUTO SHUT OFF SYSTEM BD80 ENG

727111445 HOSE FIP VALVE PORT 4 AUTO SHUT OFF SYSTEM BD80 ENG

90 nos Delivery: 150 days
#114

10Z1280019 ELEMENT ASSY OUTER AIR CLEANER I BD80 ENG

10Z1280019 ELEMENT ASSY OUTER AIR CLEANER I BD80 ENG

18 nos Delivery: 150 days
#115

31Z1340095 MANIFOLD EXHAUST MIDDLE EXHAUST MANIFOLD I BD80 ENG

31Z1340095 MANIFOLD EXHAUST MIDDLE EXHAUST MANIFOLD I BD80 ENG

10 nos Delivery: 150 days
#116

30Z3150083 GEAR CRANKSHAFT ENGINE

30Z3150083 GEAR CRANKSHAFT ENGINE

10 nos Delivery: 150 days
#117

30Z7150317 GEAR

30Z7150317 GEAR

10 nos Delivery: 150 days
#118

30Z7111778 COUPLING DISC

30Z7111778 COUPLING DISC

10 nos Delivery: 150 days
#119

30Z2100403 COVER ASSY ENGINE

30Z2100403 COVER ASSY ENGINE

10 nos Delivery: 150 days
#120

30Z8201868 WIRE HARNESS AUTO SHUT OFF SYSTEM BD80 RNF

30Z8201868 WIRE HARNESS AUTO SHUT OFF SYSTEM BD80 RNF

78 nos Delivery: 150 days
#121

412122273 30Z6180804 V BELT CASE ASSEMBLY FAN DRIVE V BD80 ENG

412122273 30Z6180804 V BELT CASE ASSEMBLY FAN DRIVE V BD80 ENG

90 nos Delivery: 150 days
#122

30Z5120643 BODY ADAPTER LUBRICATING OIL PIPING III BD80 ENG

30Z5120643 BODY ADAPTER LUBRICATING OIL PIPING III BD80 ENG

10 nos Delivery: 150 days
#123

31Z2130096 NOZZLE PISTON COOLING CYLINDER BLOCK II BD80 ENG

31Z2130096 NOZZLE PISTON COOLING CYLINDER BLOCK II BD80 ENG

77 nos Delivery: 150 days
#124

30Z1340105 MANIFOLD EXHAUST REAR EXHAUST MANIFOLD I BD80 ENG

30Z1340105 MANIFOLD EXHAUST REAR EXHAUST MANIFOLD I BD80 ENG

10 nos Delivery: 150 days
#125

0807310505 SWITCH ENGINE

0807310505 SWITCH ENGINE

10 nos Delivery: 150 days
#126

30Z5130314 STRAINER LUBRICATING OIL PUMP AND SUCTION PIPE III BD80 ENG

30Z5130314 STRAINER LUBRICATING OIL PUMP AND SUCTION PIPE III BD80 ENG

10 nos Delivery: 150 days
#127

2447222125 HAND PRIMER FEED PUMP FUEL INJECTION PUMP IV BD80 ENG

2447222125 HAND PRIMER FEED PUMP FUEL INJECTION PUMP IV BD80 ENG

60 nos Delivery: 150 days
#128

30Z7110108 SHAFT FULE INJECTION PUMP AND PIPING IV BD80 ENG

30Z7110108 SHAFT FULE INJECTION PUMP AND PIPING IV BD80 ENG

10 nos Delivery: 150 days
#129

31Z5130603 TUBE

31Z5130603 TUBE

10 nos Delivery: 150 days
#130

30Z7140298 CASE

30Z7140298 CASE

10 nos Delivery: 150 days
#131

30Z2100022 COVER ASSY ENGINE

30Z2100022 COVER ASSY ENGINE

12 nos Delivery: 150 days
#132

51Z3230514 TUBE PTO LUBRICATING OIL PIPING III BD80 ENG

51Z3230514 TUBE PTO LUBRICATING OIL PIPING III BD80 ENG

10 nos Delivery: 150 days
#133

30Z6140247 MANIFOLD WATER WATER MANIFOLD AND THERMOSTAT I BD80 ENG

30Z6140247 MANIFOLD WATER WATER MANIFOLD AND THERMOSTAT I BD80 ENG

10 nos Delivery: 150 days
#134

30Z2120184 COVER ENGINE

30Z2120184 COVER ENGINE

14 nos Delivery: 150 days
#135

30Z7180441 HOSE

30Z7180441 HOSE

27 nos Delivery: 150 days
#136

30Z6140255 MANIFOLD WATER WATER MANIFOLD AND THERMOSTAT I BD80 ENG

30Z6140255 MANIFOLD WATER WATER MANIFOLD AND THERMOSTAT I BD80 ENG

10 nos Delivery: 150 days
#137

0727101465 HOSE FUEL

0727101465 HOSE FUEL

103 nos Delivery: 150 days
#138

7427500995 LIQUID GASKET APPLICATOR

7427500995 LIQUID GASKET APPLICATOR

10 nos Delivery: 150 days
#139

727001440 HOSE FIP VALVE PORT 4 AUTO SHUT OFF SYSTEM BD80 ENG

727001440 HOSE FIP VALVE PORT 4 AUTO SHUT OFF SYSTEM BD80 ENG

78 nos Delivery: 150 days
#140

0803800519 CAP INTAKE MANIFOLD I BD80 ENG

0803800519 CAP INTAKE MANIFOLD I BD80 ENG

180 nos Delivery: 150 days
#141

30Z7131688 PLATE STOP LEVER ENGINE STOP SYSTEM IV BD80 ENG

30Z7131688 PLATE STOP LEVER ENGINE STOP SYSTEM IV BD80 ENG

62 nos Delivery: 150 days
#142

30Z7131696 PLATE SPRING ENGINE STOP SYSTEM IV BD80 ENG

30Z7131696 PLATE SPRING ENGINE STOP SYSTEM IV BD80 ENG

16 nos Delivery: 150 days
#143

31Z5110101 CFW0510032 WASHER RADIATOR ASSY I II III IV V VI BD50 BD80 ENG

31Z5110101 CFW0510032 WASHER RADIATOR ASSY I II III IV V VI BD50 BD80 ENG

10 nos Delivery: 150 days
#144

0704011612 PLUG WATER MANIFOLD AND THERMOSTAT I BD80 ENG

0704011612 PLUG WATER MANIFOLD AND THERMOSTAT I BD80 ENG

10 nos Delivery: 150 days
#145

CCC0103510 CLAMP TURBO LUBRICATING OIL PIPING III BD80 ENG

CCC0103510 CLAMP TURBO LUBRICATING OIL PIPING III BD80 ENG

26 nos Delivery: 150 days
#146

CFL0218025 SNAP RING

CFL0218025 SNAP RING

10 nos Delivery: 150 days
#147

0721450510 NIPPLE OIL COOLER ASSEMBLY V BD80 ENG

0721450510 NIPPLE OIL COOLER ASSEMBLY V BD80 ENG

74 nos Delivery: 150 days
#148

30Z2110067 TUBE ENGINE

30Z2110067 TUBE ENGINE

10 nos Delivery: 150 days

Required Documents

1

OEM Authorization Certificate

2

Additional Doc 1 (Requested in ATC)

3

Additional Doc 2 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria

4

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Corrigendum Updates

3 Updates
#1

Update

09-Mar-2026

Extended Deadline

12-Mar-2026, 1:00 pm

Opening Date

12-Mar-2026, 1:30 pm

#2

Update

06-Mar-2026

Extended Deadline

09-Mar-2026, 1:00 pm

Opening Date

09-Mar-2026, 1:30 pm

#3

Update

03-Mar-2026

Extended Deadline

06-Mar-2026, 1:00 pm

Opening Date

06-Mar-2026, 1:30 pm

Reverse Auction Schedule

Completed

Start

24-Mar-2026, 3:00 pm

End

25-Mar-2026, 4:00 pm

Duration: 25 hours

Reverse Auction Document

✅ RA concluded. Check financial results for final rankings.

Technical Results

S.No Seller Item Date Status
1
**********   Under PMA
-03-03-2026 10:07:22
2
**********   Under PMA
-06-03-2026 11:44:33
3
**********   Under PMA
-03-03-2026 08:23:47
4
**********   Under PMA
-03-03-2026 11:47:51
5
**********   Under PMA
-28-02-2026 16:02:42