Bid Publish Date
24-Jul-2026, 2:29 pm
Bid End Date
03-Aug-2026, 3:00 pm
EMD
₹8,100
Location
Progress
Quantity
60
Bid Type
Two Packet Bid
Chhattisgarh Police invites bids for LED Garden Light (V2) (Q2) in BIJAPUR, CHHATTISGARH. Quantity: 60. Submission Deadline: 03-08-2026 15: 00: 00. Submit your proposal before the deadline.
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
LED Garden Light (V2) (Q2)
Advisory Bank
State Bank of India
Payment Timelines
Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
Raipur
Delivery Pincodes
494444
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Dwarka Prasad Yadav | 494444,Gram Dhanora Main Road Bijapur (C.G.) | Raipur | Chhattisgarh | 494444 | 60 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
CATALOG Specification
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
| Category | Specification | Requirement |
|---|---|---|
| GENERIC | Type of Garden Light | Bollard type with Pole and LED lantern/luminaire |
| GENERIC | Material of Garden Lighting pole including lighting system (lantern/luminaire) (Note: Wherever GI, MS, CI materials used, materials shall be ISI Marked) | Mild steel |
| GENERIC | Pole height inlcluding lantern/luminaire (in m) | 0.5 |
| GENERIC | No.of lantern/luminaire with each pole (in m) | 1 |
| LIGHT SOURCE | Type of light source - BEE star rating of LED Bulb | SMD LED Chip |
| LIGHT SOURCE | LED Rating in each lantern/luminaire/lighting system (in Watts) | 10.0 |
| LIGHT SOURCE | LED Lamp/System efficacy in each lantern / luminaire (in lumen / watt) | ≥ 120 and < 135 |
| LIGHT SOURCE | In case of LED bulb - Cap designation of each lamp and holder in each lantern / luminaire | Not applicable (for SMP LED Chip) |
| PROTECTION | Automatic Lower / Higher Cut off voltage | Yes. Lower cut off 120 V, Higher cut off 300 V |
| PROTECTION | Protection against surges and transients - External | > / = 10 KV Or higher |
| THERMAL MANAGEMENT | Minimum Operating Temperature (in deg. C) | -10 |
| THERMAL MANAGEMENT | Maximum Operating Temperature (in deg. C) | 50 |
| LANTERN/LUMINAIRE - CONSTRUCTION | Impact resistance on diffuser material (in IK) | 7 |
| LANTERN/LUMINAIRE - CONSTRUCTION | Protection of the entire housing (in IP) Protection of the entire housing as per IS:10322 (Part 1):1982 latest | 66 |
| LANTERN/LUMINAIRE - CONSTRUCTION | Length of ISI marked three core connecting wire (Provided along with each lantern/luminiare) - (in m) | 0.5 |
| CERTIFICATIONS | Warranty for free replacement of lighting systems including lightsource (in years) | 2 |
| ADVANCE SAMPLE | Agreed to provide Advance Sample(s) for buyer's approval before commencement of supply. ( hint: Applicable in case of orders placed against bid and not applicable in case of Direct Buying ) | No |
Discover companies most likely to bid on this tender
Experience Criteria
Bidder Turnover
Certificate (Requested in ATC)
Additional Doc 1 (Requested in ATC)
Additional Doc 2 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Sign up now to access all documents
Main Document
CATALOG Specification
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS