Progress
The Indian Army (Department of Military Affairs) based in Patiala, Punjab invites bids for a diverse set of LV7 MG and SAFARI subassemblies and accessories, including brake, filter, ignition, clutch, and wiper blade assemblies. The procurement appears to cover multiple part numbers (e.g., L V7 MG 33705M80C30 Cord Set High Tension, 37100M83100 Lock Assembly Steering, 2920-002294 Coil Ignition, and SAFARI components) without a formal BOQ listed. Estimated value and exact quantities are not disclosed, but the scope spans critical vehicle system components requiring precise OEM/brand alignment and compatibility with specified LV7 platforms. The tender emphasizes option quantities up to 25% during or after contract award and deferential delivery timing tied to the last delivery order date. Unique terms include a 5-day defect rectification window and penalties up to 10% of contract value if unresolved, with PBG implications.
LV7 MG 33705M80C30 Cord Set High Tension
LV7 MG 37100M83100 Lock Assembly Steering
LV7 MG 3120-004922 BRG Clutch Release
LV7 MG 2920-002294 Coil Ignition
LV7 STLN VF B-5A03301 Spring Brake Chamber
LV7 STLN VF 23710M83043 Cable Assembly Clutch
SAFARI 287032110151 Assy Ball Joint
LV7 MG 22400M83060 Disc Clutch
LV7 MG 38340M82C00 Blade Assembly Wiper
SAFARI 278918130104 Oil Filter Assembly
SAFARI S0305-0021N Fuel Filter
SAFARI 278909130106 Air Filter Element
LV7 HH 2530-006260 Shoe Component Brake
LV7 RE 6630-001423 500613 Element Oil Filter
LV7 RE 2940-004922 Air Filter
AMB NK Wind Shield Tank
LV7 STLN 5330-72-0475282 Hub Seal Rear
LV7 T-815 442-954-161-254 Wedge Frame 5870 mm
LV7 T-815 443-612-009-000 Manual Brake Valve
LV7 T-815 443-612-346-000 Control Valve
LV7 T-815 130-976-300-114 Window Dropper
Option quantity up to 25% during contract
Last delivery order date governs delivery timeline with 30-day minimum extension
5-day defect rectification window with 0.5% weekly penalty
Penalty cap at 10% of total contract value; PBG can be forfeited
Past defence sector performance required; sample approval prior to bid opening
Undertaking on financial standing; no liquidation or bankruptcy
Partial or total performance to be backed by OEM authorizations
Penalty payment and PBG recovery possible for defects; no explicit payment schedule provided
Delivery starts after last delivery order; extended period based on increased quantity with minimum 30 days
0.5% unit price per week for defect rectification delay; cumulative cap 10% of contract value
Non-liquidation or bankruptcy; undertakings to that effect
Past performance in defence sector for last 2 financial years
Capability to supply LV7/MG and SAFARI components and maintain warranty service
Quantity
41
Category
LV7 MG 33705M80C30 Cord Set High Tension
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Past Performance
50 %
Warranty Period
5 days
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
LV7 MG 33705M80C30 Cord Set High Tension , LV7 MG 37100M83100 Lock Assy Steering , LV7 MG 3120-004922 BRG Clutch Release , LV7 MG 2920-002294 Coil Ignition , LV7 STLN VF B-5A03301 Spring Brake Chember , LV7 STLN VF 23710M83043 Cable Assy Clutch , SAFARI 287032110151 Assy Ball Joint , LV7 MG 22400M83060 Disc Clutch , LV7 MG 38340M82C00 Blade Assy Wiper , SAFARI G278918130104 Assy Oil Filter , SAFARI S0305-0021N Fuel Filter , SAFARI 278909130106 Air Filter Element , SAFARI 1001CAA14881N Element Kit Fuel Filter , LV7 HH 2530- 006260 Shoe Comp Brake , LV7 RE 6630-001423 500613 Element Oil Filter , LV7 RE 2940-004922 Air Filter , AMB NK Wind Shield Tank , LV7 STLN 5330-72-0475282 Hub Seal Rear , LV7 T-815 442-954-161-254 Wedge Frame 5870 MM , LV7 T-815 443-612-009-000 Manual Brake Valve , LV7 T-815 443-612-346-000 Control Valve , LV7 T-815 130-976-300- 114 Window Dropper
Max Delivery Days
180
Delivery Locations
1
Delivery Cities
Patiala
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | Patiala | Patiala | - | - | 2 | 180 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates (defence sector preferred, last 2 financial years)
Financial statements (audited or track record)
EMD/Security deposit submission proof (as per ATC)
Technical bid documents and OEM authorizations (if applicable)
Past performance certificates for defence sector work
Undertaking on non-liquidity/financial stability
Key insights about PUNJAB tender market
Bidders must submit GST, PAN, financial statements, experience certificates (preferably defence sector), OEM authorizations, and technical bid documents. Ensure past defence performance proof for last two financial years and provide a sample approval before bid opening. Adhere to option quantity up to 25% and delivery terms linked to the last order date.
Submit GST certificate, PAN card, audited financial statements, experience certificates (defence preferred), EMD/security, OEM authorizations, technical bid, and past performance certificates for the last two financial years. Include any warranty and service certificates requested by the buyer terms.
No explicit IS/ISO standards listed; bidders must ensure OEM alignment with LV7/MG and SAFARI part numbers listed. Provide warranty coverage and confirm compatibility with LV7 platforms; sample approval is required prior to bid opening.
Delivery starts from the last date of the original delivery order, with option quantity adjustments up to 25%. If extended, add 30 days minimum; actual dates depend on final order and contract schedule.
Penalties are 0.5% of unit price per week of delay, capped at 10% of total contract value. If unresolved, the buyer may procure from alternative sources at the seller’s risk and cost, and the PBG may be forfeited.
Past performance in defence sector for the last two financial years is required to be accepted. Provide certificates, contract references, and contactable client details to verify defence project delivery and service quality.