TenderDekho Logo
Closed GEM

Open Tender for Water Purification System with UV (Ultra-Violet Process) or UV (Ultra-Violet Process)+UF (Ultra-Fil in CUTTACK, ODISHA

Bid Publish Date

24-Aug-2026, 6:55 pm

Bid End Date

18-Sep-2026, 12:00 pm

EMD

₹14,000

Generate Docs

Progress

Issue24-Aug-2026, 6:55 pm
Corrigendum14-Sep-2026
AwardPending

Odisha Police invites bids for Water Purification System with UV (Ultra-Violet Process) or UV (Ultra-Violet Process)+UF (Ultra-Filtration Process) (V2) (Q2) in CUTTACK, ODISHA. Quantity: 35. Submission Deadline: 18-09-2026 12: 00: 00. Submit your proposal before the deadline.

Advertisement

Authority & Contact

Organization

Odisha Police

Office Name

State Police Headquarters

Grievance Contact

[email protected]

Tender Data

Bid Details

Quantity

35

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

H1-Highest Priced Bid Elimination

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

No

MSE Purchase Preference

No

MSE Exemption/Relaxation

Yes

Startup Exemption/Relaxation

Yes

Bid Splitting Applied

No

Requirements

OEM Avg. Turnover

14

Past Performance

10 %

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

Water Purification System with UV (Ultra-Violet Process) or UV (Ultra-Violet Process)+UF (Ultra-Filtration Process) (V2) (Q2)

Advisory Bank

State Bank of India

ePBG Percentage

5%

ePBG Duration (Months)

26

Delivery Details

Max Delivery Days

30

Delivery Locations

1

Delivery Cities

Cuttack

Delivery Pincodes

754005

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
LAXMIKANTA HOTA754005,Office of the Commandant, SOG,At/Po/PS- Chandaka, Dist-Khurda, BhubaneswarCuttackOdisha7540053530-

Authority Records

HOME DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9723513.pdf

Main Document

CATALOG-Specification-1

CATALOG Specification

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Categories 17

Advertisement

Corrigendum Updates

1 Update
#1

Update

14-Sep-2026

Extended Deadline

18-Sep-2026, 6:30 am

Opening Date

19-Sep-2026, 6:30 am

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

OEM Annual Turnover

7

Additional Doc 1 (Requested in ATC)

8

Additional Doc 2 (Requested in ATC)

9

Additional Doc 3 (Requested in ATC)

10

Additional Doc 4 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria

11

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Technical Specifications 1 Item

Item #1 Details

View Catalog
Category Specification Requirement
Features and Performance Type of Water Purification Technology Generally Conformity to IS 14724 for Ultraviolet (UV)
Features and Performance Rate of Flow (In LPH) of purified water upto 200 LPH
Features and Performance Method of Mounting Countertop/Wall Mount
Features and Performance Input Water Source Connection Plumber-In
Features and Performance Additional Water Conditioning and Other Features Sediment Filter, Activated Carbon Media, Normal Water Dispensing
Features and Performance Maximum Feed Water TDS (ppm) at which the machine LPH and Guaranteed output water quality is ensured upto 500
Features and Performance Guaranteed output water quality As per IS 10500 or better
Water Storage Storage Tank (inclusive in the scope of supply) No
Water Storage Type of Water Tank / Location Without Storage Tank
Water Storage Storage Tank Material NA
Water Storage Storage Tank Capacity (in Ltr) NA
Water Storage Self Contained Water Cooler NA
Controller and Display Type of Controller Fully Automatic
Controller and Display Controller and Display Features Auto cut-off
Service, Warranty, Installation and Commissioning Training and Demonstration The installation and demonstration of the machine at the consignee place shall be carried out as part of installation and commissioning
Certification / Test Report Availability of Test Report From Central Govt/Nabl/Ilac Accredited Lab to Prove Conformity to Specification Yes
Advertisement