Bid Publish Date
20-Jul-2026, 8:55 am
Bid End Date
30-Jul-2026, 9:00 am
Location
Progress
Quantity
6
Category
working platfrom rubber wood
Bid Type
Two Packet Bid
Organization: Hqids, under the Department Of Military Affairs. Procures customized storage cabinets and related tools, including working platform rubber wood, auto trim removal tool kit, and TCCO impact universal joint socket set. Scope references customized storage cabinet sizes 5ft x 3ft x 3inch and 5ft x 3ft x 2inch, with 5 total items listed in the BOQ (N/A for quantities). Delivery location is the STATIC WKSP EME, NEAR CT NT POOL, SRINAGAR COLONY, MINNIE BAY, SOUTH ANDAMAN 744103. Estimated value and EMD are not disclosed; the tender emphasizes option quantity adjustments up to 25% and an approval-driven design phase. This tender targets suppliers capable of fabrication per approved drawings and timely delivery, with GST considerations handled by bidders. Unique terms include detailed design drawings submission within 5 days of award and potential delivery period adjustments if drawings are delayed. The procurement seems oriented toward military or defence-adjacent workshops requiring controlled delivery.
Product names and categories: working platform rubber wood; customized storage cabinets (5ft x 3ft x 3inch and 5ft x 3ft x 2inch); auto trim removal tool kit; TCCO impact universal joint socket set
Quantities: 5 total items in BOQ, exact quantities not disclosed
Delivery location: STATIC WKSP EME, NEAR CT NT POOL, SRINAGAR COLONY, MINNIE BAY, SOUTH ANDAMAN 744103
Delivery & design: Detailed Design Drawings required within 5 days of award; buyer approval or modification list within 5 days
Delivery period: Option to increase quantity up to 25%; min 30 days for additional delivery time; extended period calculations based on original quantities
Option to increase/decrease quantity by up to 25% at contract placement and during currency
Buyer to approve Detailed Design Drawings within 5 days post-award; modifications provided within 5 days
GST borne by bidder; reimbursement as actuals or applicable rate, not to exceed quoted GST
GST handling by bidder; reimbursement to be at actuals or applicable rate, not exceeding quoted GST; exact payment terms not defined in tender
Delivery to STATIC WKSP EME, SRINAGAR COLONY, MINNIE BAY, SOUTH ANDAMAN; option-based quantity adjustments with minimum 30 days extension
Not explicitly stated; delivery delays tied to drawing approvals could refix delivery period without LD
Non-liquidation and non-bankrupt status with undertakings
Not obsolete in market with at least 1 year residual life per OEM, not end-of-life
Capability to submit Detailed Design Drawings within 5 days of award and obtain buyer approval
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
working platfrom rubber wood , customized storage cabinet size 5ft x 3ft x 3inch , customized storage cabinet size 5ft x 3ft x 2inch , auto trim removal tool kit , TCCO impact universal joint socket set
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
South Andaman
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | South Andaman | South Andaman | - | - | 1 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
working platfrom rubber wood
working platfrom rubber wood
customized storage cabinet size 5ft x 3ft x 3inch
customized storage cabinet size 5ft x 3ft x 3inch
customized storage cabinet size 5ft x 3ft x 2inch
customized storage cabinet size 5ft x 3ft x 2inch
auto trim removal tool kit
auto trim removal tool kit
TCCO impact universal joint socket set
TCCO impact universal joint socket set
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | working platfrom rubber wood | working platfrom rubber wood | 1 | pieces | vedparakash | 15 | |
| 2 | customized storage cabinet size 5ft x 3ft x 3inch | customized storage cabinet size 5ft x 3ft x 3inch | 2 | pieces | vedparakash | 15 | |
| 3 | customized storage cabinet size 5ft x 3ft x 2inch | customized storage cabinet size 5ft x 3ft x 2inch | 1 | pieces | vedparakash | 15 | |
| 4 | auto trim removal tool kit | auto trim removal tool kit | 1 | pieces | vedparakash | 15 | |
| 5 | TCCO impact universal joint socket set | TCCO impact universal joint socket set | 1 | pieces | vedparakash | 15 |
Discover companies most likely to bid on this tender
GST certificate
PAN card
Cancelled cheque
EFT mandate certified by bank
Detailed Design Drawings (within 5 days of award)
OEM authorizations (if applicable)
Evidence of non-bankruptcy and financial stability (undertaking)
Experience certificates or OEM-backed credentials
Bidders must submit GSTIN, PAN, cancelled cheque, and EFT mandate with the bid. Include Detailed Design Drawings within 5 days of award, and ensure products are not end-of-life with at least 1 year residual life. Ensure compliance with buyer-approved drawings and delivery schedule; GST reimbursement follows actuals or applicable rate.
Required submissions include PAN, GSTIN, cancelled cheque, EFT mandate, and OEM authorizations if applicable. Also provide experience certificates and financial statements; ensure vendor code creation documents are complete for vendor onboarding.
Cabinets include 5ft x 3ft x 3inch and 5ft x 3ft x 2inch dimensions. Items fall under customized storage cabinets; quantities are listed in BOQ as 5 items, with exact numbers not disclosed. Fabrication must follow buyer-approved drawings with design approval within 5 days.
Delivery window can extend if the option clause is exercised, with a minimum of 30 days additional time. If buyer delays drawing approvals, the delivery period is refixed without liquidated damages for the delay caused by approval proceedings.
Bid price GST is bidder-borne; reimbursement to be at actuals or applicable rate, whichever is lower, up to the quoted GST percentage. Bidder must determine GST impact independently prior to submission.
Submit Detailed Design Drawings within 5 days of award. Buyer will approve or issue modifications within 5 days. Fabrication must follow approved drawings; any modifications must be incorporated with revised timelines; no LD applies for buyer-delayed approvals.
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS