TenderDekho Logo
GEM

Indian Army Door Bedding & Hardware Tender Samba Jammu & Kashmir 2026 - ISI/ISO-like Compliance and ATC Clauses

Bid Publish Date

17-Jan-2026, 1:41 pm

Bid End Date

27-Jan-2026, 2:00 pm

Progress

Issue17-Jan-2026, 1:41 pm
Technical26-01-2026 21:03:44
Financial
AwardCompleted
Explore all 4 tabs to view complete tender details

Quantity

18

Category

Door Bedding

Bid Type

Two Packet Bid

Categories 2

Tender Overview

The Indian Army, Department Of Military Affairs, invites bids for multiple door hardware sub-assemblies including door bedding, bolts, hose assemblies and pivot pins in Samba, Jammu & Kashmir (184121). The procurement comprises 5 BOQ items with unspecified quantities, and an estimated value is not disclosed. The contracting authority reserves price and quantity adjustment rights up to 25% during and after award, with delivery timing linked to the original delivery period and extended periods. Pre-sample of all items is mandatory, and critical bid documents include PAN, GSTIN, cancelled cheque, and EFT mandate. This tender emphasizes supplier readiness for production and compliance with ATC terms. Unique terms reflect a flexible delivery window and risk-based contract termination rights, suitable for vendors with readiness for government supply chains and pre-sample demonstrations. Bidder must ensure all required documents are provided before bid participation.

Technical Specifications & Requirements

  • 5 BOQ items with N/A quantities; no explicit technical specs provided in the data
  • Option clause allows +/- 25% quantity variation at award and during currency
  • Delivery period policy ties to original DO dates; extension rules apply with minimum 30 days if applicable
  • Pre-sample of all items required before bid submission
  • Bid must include: PAN, GSTIN, cancelled cheque, EFT mandate (bank-certified)
  • ATC clauses state termination rights for non-delivery, misrepresentation or insolvency
  • No explicit product standards or brand requirements listed; ATC supersede for compliance monitoring
  • All required documents must be provided by seller before participation

Terms, Conditions & Eligibility

  • Quantity/Value: 25% variation rights; delivery schedule aligned to original DO
  • Documentation: PAN, GSTIN, Cancelled cheque, EFT Mandate (bank certified)
  • Termination rights: for non-delivery, misrepresentation, insolvency, or delivery failure
  • Pre-sample: mandatory before bid submission
  • Risk management: price/contract adjustments and extension provisions apply
  • Compliance: bidder must supply all required documents and ATC terms selection

Key Specifications

    • BOQ items: total of 5 items with N/A quantified details
    • Delivery policy: extension rules based on (increased quantity ÷ original quantity) × original delivery period, minimum 30 days
    • Pre-sample requirement: Pre sample of all items is mandatory
    • Documentation: submit PAN Card, GSTIN, Cancelled Cheque, EFT Mandate (bank-certified)
    • ATC rights: purchaser may terminate for non-compliance, delivery failure, insolvency, or misrepresentation

Terms & Conditions

  • Key Term 1: Quantity may vary up to 25% during contract at contracted rates

  • Key Term 2: Delivery period starts after original delivery order; extended period rules apply

  • Key Term 3: Mandatory pre-sample submission and specific financial docs (PAN, GSTIN, EFT mandate)

Important Clauses

Payment Terms

Not specified in data; ATC allows price adjustment and contract termination rights for non-performance

Delivery Schedule

Delivery period commences from last date of original delivery order; extension formula applies with minimum 30 days

Penalties/Liquidated Damages

Not explicitly stated; termination rights cover non-delivery, delays, and misrepresentation

Bidder Eligibility

  • SubmitPAN and GSTIN copies with bid

  • Provide Cancelled Cheque and EFT Mandate certified by bank

  • Comply with ATC clauses on quantity variation and delivery timelines

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Door Bedding , Tooth , Bolt , Hose Assy , Pivot Pin

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-8851461.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 5 Items Sign in for GEM prices

#1

Door Bedding

Door Bedding

2 nos Delivery: 21 days
#2

Tooth

Tooth

8 nos Delivery: 21 days
#3

Bolt

Bolt

4 nos Delivery: 21 days
#4

Hose Assy

Hose Assy

1 nos Delivery: 21 days
#5

Pivot Pin

Pivot Pin

3 nos Delivery: 21 days

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria

5

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Technical Results

S.No Seller Item Date Status
1
AASHIRWAAD AGENCIES   Under PMA
-26-01-2026 21:03:44
2
KHANNA TRADER   Under PMA
-26-01-2026 21:12:04
3
SHIVANSH ENTERPRISES   Under PMA
-26-01-2026 20:53:29

Financial Results

Rank Seller Price Item
L1
AASHIRWAAD AGENCIES(MSE)( MSE Social Category:General )    Under PMA
Item Categories : Door Bedding,Tooth,Bolt,Hose Assy,Pivot Pin
L2
KHANNA TRADER (MSE)( MSE Social Category:General )    Under PMA
Item Categories : Door Bedding,Tooth,Bolt,Hose Assy,Pivot Pin
L3
SHIVANSH ENTERPRISES (MSE)( MSE Social Category:General )    Under PMA
Item Categories : Door Bedding,Tooth,Bolt,Hose Assy,Pivot Pin

Frequently Asked Questions

Key insights about JAMMU AND KASHMIR tender market

How to bid on the Indian Army door hardware tender in Samba?

Bidders must prepare PAN, GSTIN, cancelled cheque, and EFT mandate; submit pre-sample of all items; comply with option clause allowing up to 25% quantity variation; ensure delivery plans align with original DO and follow ATC terms. Ensure documents are attached before bid submission.

What documents are required for bid participation in this Army tender in Samba?

Required documents include PAN card, GSTIN certificate, cancelled cheque, bank-certified EFT mandate; all required documents must be provided prior to bid participation per ATC clauses. Ensure pre-sample submission readiness and compliance with delivery extension terms.

What are the delivery terms and extension rights for this Army procurement?

Delivery terms allow a 25% quantity variation. The delivery period runs from the last date of the original DO; extensions follow the formula (increased quantity / original quantity) × original delivery period, minimum 30 days unless original period is shorter. Extensions may apply within contract limits.

Which items are included in the 5 BOQ components for this tender?

The BOQ lists five items described as door bedding, bolt, hose assembly, pivot pin, and related door hardware components. Quantities are not disclosed in the data, implying the winning bidder must respond to quantity variations as per clause.

What are the termination rights if delivery fails in this Army contract?

The buyer may terminate for material term breach, inability to deliver, misrepresentation, insolvency, or non-delivery. Termination can occur via written notice, and the seller may face price adjustment or other remedies as per the contract ATC.

How will price adjustments be handled under this Army ATC terms?

The ATC permits price adjustment by the buyer for unspecified reasons; however, the clause also allows contract termination for non-compliance. Bidders should prepare competitive pricing while accounting for potential adjustments during currency of contract.

What is the required evidence for pre-sample submission in this tender?

Pre-sample documentation must cover all five items listed in the BOQ context; please arrange samples for initial inspection before bid submission and be prepared for potential sample testing according to Army quality checks.