Indian Army Split AC Supply Install and Testing 1.5 Ton Bardhaman West Bengal 5-Star ISO 9001 2026

Bid Publish Date

14-Aug-2026, 7:02 pm

Bid End Date

24-Aug-2026, 8:00 pm

Progress

Issue14-Aug-2026, 7:02 pm
Technical23-08-2026 19:54:43
Financial
AwardCompleted

Key Highlights

  • ISO 9001 certification mandatory for bidder or OEM
  • Scope includes full Supply, Installation, Testing and Commissioning (SITC) of 1.5 Ton split AC
  • Electrical & cabling specifics: 6 sqmm FRLSH and 4 sqmm FRLSH cables, SPN DB enclosures
  • 25% quantity variation allowed during procurement and currency of contract

Tender Overview

The Indian Army, Department Of Military Affairs, invites bids for the Supply Install and Testing of Split AC systems with a capacity of 1.5 Ton and a 5 Star rating, along with associated electrical and civil works. The procurement location is BARDHAMAN, WEST BENGAL - 713101. Scope includes M & L sub-main wiring with two single core 6 sqmm FRLSH PVC Cable and two single core 4 sqmm FRLSH PVC Cable, plus supply and fixing of indoor/outdoor copper pipes, PVC drain pipes, SPN DB enclosures (8 and 4 way), MCBs, and modular AC sockets. The package covers all components under Supply Installation Testing and Commissioning. The contract may be scaled with quantity variation up to 25% during procurement and during the currency of the contract. ISO 9001 certification is mandatory for the bidder or OEM. This tender emphasizes compliance with prescribed ATC and Corrigendum documents.

Keyword rich location and product context: tender in Bardhaman, Rajasthan-like procurement mindset, Indian Army security and climate control equipment procurement, 1.5 Ton AC solution for military spaces.

Key Specifications

  • 1.5 Ton Split AC, 5 Star energy rating

  • FRLSH copper cabling: 6 sqmm and 4 sqmm

  • SPN 8-way and 4-way sheet metal enclosures

  • S and F MCB SP 6-32 Amps, 240V 50 Hz

  • Indoor/outdoor copper pipe and drain pipe supply & fix

  • ISO 9001 certified bidder or OEM

Terms & Conditions

  • 25% quantity variation allowed at contract and during currency

  • ISO 9001 certification mandatory for bidder or OEM

  • SITC scope includes installation, testing, commissioning

Important Clauses

Payment Terms

Not explicitly stated; project will follow government ATC terms with standard bid payment rules.

Delivery Schedule

Delivery period subject to option clause; additional time calculated as (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days.

Penalties/Liquidated Damages

Penalties not detailed in provided data; likely governed by ATC and contract conditions.

Bidder Eligibility

  • Must hold ISO 9001 certification (bidder or OEM)

  • Experience in SITC of HVAC systems within defence/government sectors preferred

  • Submit all required documents: GST, PAN, OEM authorizations, financials, and bid certificates

Authority & Contact

Organization

Indian Army

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Technical Results

S.No Seller Item Date Status
1
ARCHAN MARKETING   Under PMA
-23-08-2026 19:54:43
2
IONSTAR INDIA PRIVATE LIMITED   Under PMA
-24-08-2026 15:50:14
3
MAHAJAN ENTERPRISE   Under PMA
-23-08-2026 17:34:49
4
NISTTHA TRADING AND CO   Under PMA
-23-08-2026 18:06:36

Financial Results

Rank Seller Price Item
L1
MAHAJAN ENTERPRISE(MSE,MII)( MSE Social Category:General )    Under PMA
Item Categories : Supply Install and testing Split AC of Capacity 1 point 5 Ton Star rating 5 Star,M and L sub main w
L2
ARCHAN MARKETING (MSE,MII)( MSE Social Category:General )    Under PMA
Item Categories : Supply Install and testing Split AC of Capacity 1 point 5 Ton Star rating 5 Star,M and L sub main w
L3
NISTTHA TRADING AND CO (MSE,MII)( MSE Social Category:General )    Under PMA
Item Categories : Supply Install and testing Split AC of Capacity 1 point 5 Ton Star rating 5 Star,M and L sub main w

Tender Data

Bid Details

Quantity

222

Category

Supply and fix PVC Drain pipe of suitable size for drain of water form AC indoor

Bid Type

Two Packet Bid

Bid Validity

120 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Past Performance

40 %

Experience Required

2 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Supply Install and testing Split AC of Capacity 1 point 5 Ton Star rating 5 Star , M and L sub main wiring with two single core 6 sqmm FRLSH PVC Cable , M and L sub main wiring with two single core 4 sqmm FRLSH PVC Cable , Supply and fix Copper pipe for fixing AC indoor and outdoor , Supply and fix PVC Drain pipe of suitable size for drain of water form AC indoor , S and F Mcb Spn 32 Amps 240 volts C Curve , S and F Modular Type AC Socket with MCB all as specified , S and F sheet metal enclosure SPN DB 8 Way , S and F sheet metal enclosure SPN DB 4 Way , S and F MCB SP 6 to 32 Amps 240 Volts 50 Hz

Advisory Bank

State Bank of India

ePBG Percentage

2%

ePBG Duration (Months)

12

Delivery Details

Max Delivery Days

90

Delivery Locations

1

Delivery Cities

Bardhaman

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-BardhamanBardhaman--590-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9739382.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 10 Items Sign in for GEM prices

#1

Supply Install and testing Split AC of Capacity 1 point 5 Ton Star rating 5 Star

Supply Install and testing Split AC of Capacity 1 point 5 Ton Star rating 5 Star

5 each Delivery: 90 days
#2

M and L sub main wiring with two single core 6 sqmm FRLSH PVC Cable

M and L sub main wiring with two single core 6 sqmm FRLSH PVC Cable

60 rm Delivery: 90 days
#3

M and L sub main wiring with two single core 4 sqmm FRLSH PVC Cable

M and L sub main wiring with two single core 4 sqmm FRLSH PVC Cable

105 rm Delivery: 90 days
#4

Supply and fix Copper pipe for fixing AC indoor and outdoor

Supply and fix Copper pipe for fixing AC indoor and outdoor

20 rm Delivery: 90 days
#5

Supply and fix PVC Drain pipe of suitable size for drain of water form AC indoor

Supply and fix PVC Drain pipe of suitable size for drain of water form AC indoor

15 rm Delivery: 90 days
#6

S and F Mcb Spn 32 Amps 240 volts C Curve

S and F Mcb Spn 32 Amps 240 volts C Curve

2 each Delivery: 90 days
#7

S and F Modular Type AC Socket with MCB all as specified

S and F Modular Type AC Socket with MCB all as specified

5 each Delivery: 90 days
#8

S and F sheet metal enclosure SPN DB 8 Way

S and F sheet metal enclosure SPN DB 8 Way

1 each Delivery: 90 days
#9

S and F sheet metal enclosure SPN DB 4 Way

S and F sheet metal enclosure SPN DB 4 Way

1 each Delivery: 90 days
#10

S and F MCB SP 6 to 32 Amps 240 Volts 50 Hz

S and F MCB SP 6 to 32 Amps 240 Volts 50 Hz

8 each Delivery: 90 days

Categories 16

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

ISO 9001 certification (bidder or OEM)

4

OEM authorization letter (if applicable)

5

Experience certificates for SITC of HVAC systems

6

Financial statements (audited, last 3 years)

7

Technical bid documents as per ATC

8

EMD/Security deposit documentation (as per ATC)

9

Bid documents uploaded per Seller’s Terms (ATC)

Frequently Asked Questions

Key insights about WEST BENGAL tender market

How to bid for the Indian Army split AC tender in Bardhaman?

Bidders must meet ISO 9001 certification, submit GST and PAN, provide OEM authorization if required, and attach technical bid documents plus financial statements. Ensure SITC scope is clearly priced and quantities allow up to 25% variation per ATC terms; comply with all ATC/Corrigendum documents.

What documents are required for the 1.5 ton AC SITC tender in West Bengal?

Required documents include GST certificate, PAN, ISO 9001 certification, OEM authorization, experience certificates of HVAC SITC, audited financial statements, and all bid certificates as per ATC. Upload technical bid and EMD documentation where applicable.

What are the technical specifications for the 1.5 ton AC in this tender?

Specifications focus on a 1.5 TON, 5 STAR split AC with FRLSH cabling in 6 sqmm and 4 sqmm, SPN enclosures (8W/4W), MCBs from 6 to 32 Amps at 240V 50 Hz, and necessary copper and drain pipes for indoor/outdoor units; ISO 9001 compliance is mandatory.

What are the delivery terms and variation clauses for this Army tender?

Delivery terms allow up to 25% quantity variation both at order and during currency. Additional time is calculated by the formula (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days; extension allowed per contract terms.

What standards must bidders meet for this Indian Army procurement?

Bidders must hold ISO 9001 certification for themselves or the OEM. The scope includes SITC of HVAC equipment; compliance with ATC/Corrigendum is mandatory, and upload of required certificates is essential for bid validity.

Which location and organization are associated with this HVAC tender 2026?

Tender relates to the Indian Army's Department of Military Affairs, located in BARDHAMAN, WEST BENGAL. It involves supply, installation, testing, and commissioning of a 1.5 Ton split AC unit for military infrastructure.

What is the role of SPN DB enclosures in this bid?

Bid must include S and F sheet metal SPN DB enclosures: 8 Way and 4 Way units, along with MCBs and modular AC sockets, ensuring safe electrical distribution for the air conditioning installation.

What is the scope of supply for this Army HVAC project?

Scope encompasses Supply Installation Testing and Commissioning of 1.5 Ton split AC including electrical cabling, piping, condensate drainage, SPN DBs, MCBs, and compliant safety components, all delivered under ISO 9001 compliance.