PRESSURE PIPE WITH COUPLING,BENDIX DRIVE,COVER ASSY,HOSE ASSY,WEATHER STRIP,ROTARY SWITCH,LOCK ASSY
Indian Army
JHANSI, UTTAR PRADESH
Bid Publish Date
08-Nov-2025, 2:09 pm
Bid End Date
08-Dec-2025, 3:00 pm
Location
Progress
Quantity
142
Category
Double Door Hose Box
Bid Type
Two Packet Bid
The north eastern electric power corporation limited (NEEPCO) invites bids for procurement of safety and firefighting accessories including Double Door Hose Box, Double Door Hose Reel Box, Canvas Hose Pipe with GM Male Female Coupling, RRL with GM Male Female Coupling, and Hose reel hose per IS 884 fitted with copper nozzle and short branch nozzle at Dikrong Power House, Panyor Lower Hydro Power Station, Arunachal Pradesh. Scope covers equipment supply and installation/commissioning (if within scope). The procurement location is Papum Pare, Arunachal Pradesh 791109, with delivery to Dikrong Power House. TheTender includes an option clause allowing up to 25% quantity variation at contracted rates, with delivery time adjustments tied to original/extended schedules. A 3-year turnover review is required for eligibility, and GST compliance is noted. A detailed price/technical bid is expected for the six BOQ items. Unique aspects include in-field delivery to a hydro power facility and compliance with OEM life-cycle and market viability requirements.
Product scope includes: Double Door Hose Box, Double Door Hose Reel Box, Canvas Hose Pipe with GM Male Female Coupling, RRL with GM Male Female Coupling, Hose reel hose per IS 884 with copper nozzle and short branch nozzle
Delivery location: Dikrong Power House, Panyor Lower Hydro Power Station, Arunachal Pradesh
Standards: IS 884 for hoses and fittings; IS 550 not indicated, IS 884 explicitly called out
Installation: If included in scope, commissioning to be performed at NEPPO facility in Arunachal Pradesh
Life-cycle requirement: Offer must ensure at least 7 years residual market life for each product
25% quantity variation allowed at contract and during currency of contract
Delivery to Dikrong Power House, with on-site installation/commissioning if included
Turnover, financial stability, and non-end-of-life product requirements for eligibility
GST as applicable; bidder bears tax; no explicit EMI; payment terms aligned with standard procurement practice and delivery milestones
Delivery period to commence after original/extended delivery orders; option clause may extend time with minimum 30 days; final delivery timeline tied to last date of delivery orders
LD provisions not explicitly stated; refer to standard tender terms for non-performance and delays
Minimum average annual turnover as per last 3 financial years
Not under liquidation or bankruptcy; provide undertaking
Products not end-of-life within 7 years residual market life; OEM-authenticated
GST compliance and proper documentation
Main Document
BOQ
BOQ
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
JHANSI, UTTAR PRADESH
Indian Air Force
Indian Army
Samba, JAMMU & KASHMIR
Indian Army
JALANDHAR, PUNJAB
Indian Army
GURDASPUR, PUNJAB
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | Double Door Hose Box | Hose Box Size 800x600x300 mm | 25 | nos | ajitsarmah | 90 |
| 2 | Double Door Hose Reel Box | Hose Box size 900x700x520 mm | 7 | nos | ajitsarmah | 90 |
| 3 | Canvas Hose Pipe with GM Male Female Coupling | Dia 63 mm Length 15 m 8 to20Kg per square cm | 35 | nos | ajitsarmah | 90 |
| 4 | RRL with GM Male Female Coupling | Dia 63 mm Length 15m 8 to 20Kg per square cm | 35 | nos | ajitsarmah | 90 |
| 5 | Hose reel hose as per IS 884 Fitted with Copper Nozzle | Dia 25 mm Length 30m 8 to 12Kg per square cm | 15 | nos | ajitsarmah | 90 |
| 6 | Short Branch Pipe Nozzle | Dia 63 mm 8 to 20 Kg per square cm | 25 | nos | ajitsarmah | 90 |
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Audited financial statements for last 3 years or CA certificate indicating turnover
Certificate of non-liquidation/non-bankruptcy undertakings
OEM authorization or product certifications for IS 884 compliant hoses
Technical bid and price bid documents
Experience certificates for similar procurement of hose boxes/reels
Any certificates requested under ATC/Corrigendum
Key insights about ARUNACHAL PRADESH tender market
Bidders must submit GST, PAN, turnover certificates, and experience in similar procurement. Ensure IS 884 compliant hoses and GM couplings are quoted. Include OEM authorizations and installation capability if required; provide delivery schedule to Dikrong Power House and confirm 25% quantity variation rights at contract.
Required documents include GST certificate, PAN, audited turnover for last 3 years or CA certificate, non-liability undertaking, OEM authorization, technical and price bids, experience certificates for similar work, and compliance certificates for IS 884 devices.
Delivery is to Dikrong Power House, Panyor Lower Hydro Power Station, Arunachal Pradesh. Installation/commissioning is included only if within scope; delivery timelines start after original or extended orders, with potential 30-day minimum extension under the option clause.
Bidders must show average annual turnover for the last 3 years as specified in the bid document, with certified audited statements or CA certificates. No liquidation or bankruptcy status is allowed; provide an explicit undertaking.
Hoses and fittings must be IS 884 compliant as per the tender terms. Suppliers should provide OEM certifications or IS 884 compliant product documentation to verify conformance and performance.
The purchaser may increase or decrease quantity up to 25% at contract and during the contract period at contracted rates. Delivery time adapts using (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days.
Bidder bears GST responsibility; reimbursement will be at actuals or applicable rates, whichever is lower, up to the quoted GST percentage. Ensure correct GST registration and compliance in the bid submission.
Yes, OEM authorizations or supplier certifications for IS 884 compliant equipment are expected. Include relevant manufacturer documentation and ensure products have market life of at least 7 years remaining.
Sign up now to access all documents
Main Document
BOQ
BOQ
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS