Progress
Gujarat State Electricity Corporation Limited (gsecl) Vadodara invites bids for the repair, maintenance and installation of plant/systems/equipment, specifically involving dismantling of an existing mill body and installation/commissioning of a new separator body with journal opening cover, journal spring assembly and mill side components, at Surat, Gujarat 394101. The tender requires an EMD of ₹2,31,915 and adherence to ATC terms; the estimated value and timelines are not disclosed. The scope appears to focus on mechanical refurbishment and integration of critical mill components under the Energy and Petro Chemicals Department. The absence of BOQ items suggests a scope-based or turnkey approach, with ATC-driven pricing. Unique elements include the sequence of dismantling, installation, and commissioning of precision mill parts within a centralized state utility framework.
Scope: dismantling of existing mill body and installation/commissioning of new separator body with journal opening cover and journal spring assembly
EMD: ₹2,31,915
Location: Surat, Gujarat 394101
ATC compliance: adhere to bidder-specific ATC terms and minimum average annual turnover/experience
No BOQ items published; scope based on ATC terms
EMD must be paid as per ATC; amount ₹2,31,915
ATC terms prevail over GeM terms; comply with attached ATC document
No BOQ items; execution based on dismantling and installation of mill components
Payment terms to be governed by ATC; exact schedule not provided in tender data
Delivery timeline to be defined in ATC; installation and commissioning at Surat facility
Penalties, if any, to be specified in ATC; not detailed in available data
Adherence to attached ATC terms and conditions
Demonstrated experience in dismantling/installing mill components or equivalent mechanical assemblies
Minimum average annual turnover as required by ATC and supporting financials
Quantity
1
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
RA Qualification Rule
H1-Highest Priced Bid Elimination
Tech Clarification Time
4 Days
EMD Required
Yes
MSE Purchase Preference
Yes
MSE Preference Band
L1+20%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Min. Avg. Annual Turnover
23
Arbitration Clause
Yes (Arbitration clause document) as per DoE OM No.F.1/2/2024-PPD dated 03.06.2024 Arbitration should not be routinely included in contracts
Mediation Clause
No
Tender Category
Service
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WT5218G The works of dismantling of existing mill body and installation commissioning of New Separator Body with Journal Opening Cover Journal Spring Assbly and Mill Sid..
Advisory Bank
Bank Of Baroda
ePBG Percentage
5%
ePBG Duration (Months)
8
Delivery Locations
1
Delivery Cities
Tapi
Delivery Pincodes
394680
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Divyeshkumar Dipakbhai Patel | 394680,GSECL UKAI TPS, UKAI DAM, DIST: TAPI | Tapi | Gujarat | 394680 | Project / Lumpsum Based | - | Estimated Cost of Spare/Consumable s/Items on Reimbursement basis in Rs (please input 0 if not applicable) : 0 |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
GEM_GENERAL_TERMS_AND_CONDITIONS
Extended Deadline
03-Sep-2026, 9:30 am
Opening Date
03-Sep-2026, 10:00 am
Discover companies most likely to bid on this tender
GST registration certificate
PAN card
Experience certificates demonstrating prior dismantling/installations of mill components
Audited financial statements for the past 3 years
EMD submission proof (online or DD as per ATC)
Technical compliance certificates as per ATC
OEM authorizations or approvals if required by ATC
Any other documents specified in attached ATC document
Key insights about GUJARAT tender market
Bidders must submit ATC-compliant documents, including GST, PAN, experience certificates, and financials, along with EMD of ₹2,31,915. Ensure adherence to ATC terms; no BOQ is provided, implying a turnkey scope requiring detailed technical documentation and a project plan.
Required documents include GST registration, PAN, experience certificates for similar dismantling/installation work, audited financial statements, EMD proof, technical compliance certificates, and OEM authorizations if specified in the ATC. All documents must align with the attached ATC terms.
No explicit technical specs are published; scope references dismantling of the mill body and installation/commissioning of a new separator body with journal opening cover and journal spring assembly. Compliance relies on ATC-provided requirements and performance under installation conditions.
The EMD amount is ₹2,31,915 as specified by ATC. Submit proof of payment or online transfer with the bid; reference the ATC document for any payment milestones or alternative payment methods.
Eligibility follows the attached ATC, requiring minimum average annual turnover and years of past experience in similar dismantling/installation projects. Provide certificates and turnover data from audited financial statements to demonstrate compliance.
The delivery schedule is governed by ATC; the tender specifies installation and commissioning at Surat facility without fixed dates in public data. Review ATC for milestones, site access, and acceptance criteria prior to bid submission.
Obtain and study the attached ATC document, ensure rates reflect ATC requirements, prepare turnover/experience evidence, and align bid pricing with minimum annual turnover as mandated. Include OEM authorizations if demanded by ATC and ensure GST/PAN validity.
Payment terms are specified in the ATC and prevail over GeM terms. Expect staged payments aligned with milestones such as delivery, installation, and commissioning; confirm exact terms within ATC and vendor response.