Self Priming Centrifugal Pump as per IS 5120
Urban Administration And Devlopment
GUNA, MADHYA PRADESH
Bid Publish Date
01-Dec-2025, 4:31 pm
Bid End Date
14-Jan-2026, 11:00 am
Location
Progress
Quantity
4
Bid Type
Two Packet Bid
The Directorate Of Purchase And Stores under the Department Of Atomic Energy invites bids in Indore, Madhya Pradesh for a Self Priming Centrifugal Pump conforming to IS 5120 (Q3). The scope is limited to the supply of goods, with a mandatory 2-year warranty from final acceptance or after installation testing. OEM warranty certificates are required at delivery, and service network details must be provided for India-based installation, commissioning, and maintenance. A mandatory annexure and country of origin checklist must be submitted, and packaging must reflect a GeM contract number and consignee details. This tender emphasizes post-sale service capability and fixed-rate supply logistics within the purchaser’s terms, with GST considerations clarified by the bidder.
Product category: Self priming centrifugal pump
Standard: IS 5120 (Q3) compliance
Warranty: 2 years from final acceptance or post-installation testing
Delivery: Goods supply only; installation/commissioning included per ATC terms
Documentation: OEM warranty certificates at delivery; country of origin format
Packaging: GeM contract number and consignee/consignor details on packages
EMD not explicitly stated in provided data; verify during bid readiness
Quantity variation allowed up to 25% of bid/contract quantity
GST to be borne by bidder; reimbursement capped to actuals or quoted rate
Mandatory annexure and country-of-origin documentation required
2-year warranty with OEM support and India-based service network
GST treatment with reimbursement at actuals or capped rate; payment terms aligned with GeM/contract norms
Delivery to commence from last date of original delivery order; extended timelines via option clause with minimum 30 days
Option to increase quantity by up to 25%; adherence to delivery and performance terms to avoid LD
Experience in supplying IS 5120-compliant pumps or equivalent
Evidence of India-based installation, commissioning, and service capability
Valid GST registration and PAN
OEM authorization for the pump model (where applicable)
Urban Administration And Devlopment
GUNA, MADHYA PRADESH
Urban Administration And Devlopment
GUNA, MADHYA PRADESH
E-nagar Palika Government Of Madhya Pradesh
SHAJAPUR, MADHYA PRADESH
N/a
RAJGARH, MADHYA PRADESH
Indian Army
UDHAM SINGH NAGAR, UTTARAKHAND
Tender Results
Loading results...
Discover companies most likely to bid on this tender
GST registration certificate
PAN card
OEM authorization certificate (where applicable)
Technical compliance certificates confirming IS 5120 (Q3) standard
Warranty certificates from OEM
Installation/commissioning & maintenance capability proof (service centers in India)
Country of origin declaration per annexure
Signed, stamped checklist as per annexure
Extended Deadline
14-Jan-2026, 11:00 am
Opening Date
14-Jan-2026, 11:30 am
Extended Deadline
12-Jan-2026, 9:00 am
Opening Date
12-Jan-2026, 9:30 am
Extended Deadline
10-Jan-2026, 9:00 am
Opening Date
10-Jan-2026, 9:30 am
Key insights about MADHYA PRADESH tender market
Bidders must submit GST, PAN, OEM authorization, and IS 5120 (Q3) compliance certificates. Include OEM warranty, installation capability proof, and a signed annexure with COUNTRY OF ORIGIN. Follow GeM packaging requirements and ensure delivery terms match the 25% variation clause.
Required documents include GST registration, PAN, OEM authorization, IS 5120 compliance certificate, OEM warranty, installation/maintenance capability proof, country-of-origin declaration, and a signed mandatory checklist. All items must be uploaded with the bid submission.
The bid specifies a 2-year warranty from final acceptance or after installation/commissioning testing. OEM warranty certificates must be provided at the time of delivery, and after-sales support must be available across India.
Delivery terms allow a quantity variation up to 25% of bid quantity during contract and currency. Additional time is calculated as (increased quantity/original quantity) × original delivery period, with a minimum of 30 days.
Pumps must conform to IS 5120 (Q3). Ensure technical certificates explicitly state compliance to IS 5120, enabling acceptance at consignee location after final testing.
Packages must be labeled with the GeM Contract Number, consignee name, consignor name, and contact details. OTP delivery is not accepted; ensure all labels are legible and matching the GeM contract data.
GST is the bidder’s responsibility; reimbursement will be as per actuals or the quoted rate, whichever is lower, subject to the tender’s GST cap. Bidder should quote inclusive/exclusive GST clearly.
Proven capability to install, commission, train, troubleshoot, and maintain pumps in India; provide service centers near consignee locations and show prior experience with similar IS 5120 equipment.
Sign up now to access all documents
Main Document
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS