Bid Publish Date
24-Feb-2026, 12:02 pm
Bid End Date
05-Mar-2026, 12:00 pm
Location
Progress
Central Ground Water Board (cgwb) has released a public tender for Groundwater modelling System Software (Q2) in RAIPUR, CHHATTISGARH. Quantity: 1. Submission Deadline: 05-03-2026 12: 00: 00. Download documents and apply online.
Quantity
1
Bid Type
Two Packet Bid
Bid Validity
30 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
RA Qualification Rule
50% Lowest Priced Technically Qualified Bidders
Tech Clarification Time
2 Days
Min. Avg. Annual Turnover
2
OEM Avg. Turnover
2
Past Performance
10 %
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Groundwater modelling System Software (Q2)
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
CATALOG Specification
GEM_GENERAL_TERMS_AND_CONDITIONS
Extended Deadline
05-Mar-2026, 6:30 am
Opening Date
05-Mar-2026, 7:00 am
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
OEM Annual Turnover *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
| Category | Specification | Requirement |
|---|---|---|
| FEATURES AND FUNCTIONALITY PARAMETERS | Modules available in the offered software | MODFLOW – Grid Approach, MODFLOW-USG, MODFLOW – ZONEBUDGET, MODFLOW – Recharge, MODFLOW-USG Converting from MODFLOW-2005, MODFLOW – Model Calibration, MODFLOW – Automated Parameter Estimation, MODFLOW - Advanced PEST, MODFLOW –Transient Calibration, MODFLOW-USG – PEST, MODFLOW Model & Interface, MODFLOW-LGR(for Local Grid Refinement) Model & Interface, MODPATH Model & Interface, MT3DMS Model & Interface (Modular Transport, 3-Dimensional, Multi-Species model), RT3D Model & Interface (Reactive multi-species Transport in 3-Dimensional groundwater systems), SEAWAT Model & Interface, PHT3D Model & Interface, Other |
| FEATURES AND FUNCTIONALITY PARAMETERS | Types of Groundwater Tracking simulation available | MODPATH Particle tracking code, MODPATH 3DU, MODPATH 3DU Transient, Others |
| FEATURES AND FUNCTIONALITY PARAMETERS | Capability of software to integrate with other software to | Native MODFLOW files, Visual MODFLOW, Groundwater Vistas and PM Win ( Processing Modflow for Windows), Other |
| FEATURES AND FUNCTIONALITY PARAMETERS | Types of tools associated with Groundwater modelling Software | 3D Grid tools, 3D Animation tools, Conceptual Modelling Tools, GIS Tools, Annotation Tools, Geostatistics and Scatter Data Tools, Subsurface Characterization Tools, Stochastic Modelling Tools, Others |
| FEATURES AND FUNCTIONALITY PARAMETERS | Types of Utilities supported by Groundwater modelling System Software | Zone Budget utility, PEST ( parameter estimation package) Utility-Single Core, Parallel PEST Utility-Multi Core, SAMG Solver Utility (Systems Algebraic Multi-Grid), T-PROGS Utility (Transition Probability GeoStatistical), Other |
| FEATURES AND FUNCTIONALITY PARAMETERS | Types of Analyst tools for ArcGIS (Geographic information System) | Arc Hydro Groundwater Analyst for ArcGIS, MODFLOW Analyst for ArcGIS, Other |
| BASIC INFORMATION OF GROUNDWATER MODELLING SYSTEM SOFTWARE | Software Domain / Type | Modeling Sotware, GIS Based Groundwater Modeling Software |
| BASIC INFORMATION OF GROUNDWATER MODELLING SYSTEM SOFTWARE | Types of License | Perptual, Subscription, Renewal of licence for one year |
| BASIC INFORMATION OF GROUNDWATER MODELLING SYSTEM SOFTWARE | Number of years upto which support is available from OEM | 1, 2, 3, 5 |
| GENERIC PARAMETERS OF GROUNDWATER MODELLING SYSTEM SOFTWARE | No of days Training Provided at Site | 0, upto to 5, 6 to 10, 11 to 20, 21 to 30 |