TenderDekho Logo
Closed GEM

National Disaster Response Force Lightning Protection Tender 2026 Himachal Pradesh ISO Certification Required

Bid Publish Date

30-Jul-2026, 10:18 am

Bid End Date

06-Aug-2026, 1:00 pm

Generate Docs

Progress

Issue30-Jul-2026, 10:18 am
Corrigendum03-Aug-2026
AwardPending

Key Highlights

  • ISO quality certification required from manufacturer
  • NABL/ILAC accredited lab test reports for conformity
  • Three installation sites in Himachal Pradesh (Rampur, Slapper, Nalagarh)
  • 25% quantity variation entitlement during and within contract currency

Tender Overview

National Disaster Response Force (ND RF) through Central Armed Police Forces invites bids for advanced technology lightning protection and building protection systems. The scope references items like Air terminal Rods, Round and Flat conductors, Mast assemblies, Lightning counters, Earthing components, clamps, insulators, and general parameters requiring IS conformity and test certification. Delivery will be to three NDRF deployment sites in Himachal Pradesh with potential 25% quantity variation and a baseline delivery window anchored to original orders, with minimum additional time of 30 days. Proposals must include a data sheet, and manufacturers should hold ISO quality certifications and provide third‑party test reports. Optional site visits are permitted at bidder expense. EMD/financial terms are to be clarified in the bid schedule. This procurement targets robust, standards‑conforming lightning protection suitable for high-altitude installations and government risk reduction programs, including conformity verification by NABL/ILAC accredited laboratories.

Technical Specifications & Requirements

  • Interception probability and lightning current peak values (minimum and maximum) are core electrical safety metrics.
  • Air terminal Rods: height, diameter, and material specifications; Round and Flat conductors: diameter and size; Mast: material and diameter.
  • Lightning counter: protection rating; Earthing: chamber cover size, earthing rod length, diameter, and materials; Patti, Clamp: sizes and materials; Insulator size (HxW).
  • General parameters: conformity to electrical standards, warranty, lightning protection class, required test reports, and ISO certification.
  • Testing: availability of Central Govt/NABL/ILAC‑accredited lab test reports; Data Sheet must align with offered products.

Terms, Conditions & Eligibility

  • Option clause allows ±25% quantity variation during contract and currency; delivery time scales with quantity, minimum 30 days.
  • Delivery and installation sites detailed across three locations in Himachal Pradesh; GST duties and financials remain bidder‑driven.
  • Bidder must be financially healthy (no liquidation or bankruptcy) and provide undertaking; GST as applicable; site visit costs borne by bidder; data sheet alignment required.
  • Manufacturer must hold ISO quality certification; test reports from recognized labs required; data sheet verification is mandatory for bid acceptance.

Key Specifications

  • Interception probability

  • Lightning current peak value (minimum) kA

  • Lightning current peak value (maximum) kA

  • Air terminal Rod height

  • Air terminal Rod Diameter

  • Air terminal Rod Material

  • Round conductor Diameter

  • Round conductor Material

  • Flat Conductor Size (WxH) mm

  • Flat Conductor Material

  • Mast Material

  • Mast Diameter

  • Protection rating for Lightning Counter

  • Chamber Cover Size mm

  • Earthing Rod Length

  • Earthing Rod Diameter

  • Chamber Cover material

  • Earthing Rod Material

  • Patti Size

  • Clamp Size mm

  • Clamp Material

  • Insulator Size (HxW) mm

  • Conformity of Electrical Standards

  • Warranty

  • Lightning protection Class

  • Test Report/Certification availability

  • ISO certification for quality standards

Terms & Conditions

  • 25% quantity increase/decrease option during contract, with adjusted delivery time

  • Delivery to three specified sites in Himachal Pradesh; original delivery timeline governs base schedule

  • Manufacturer must hold ISO quality certification and provide NABL/ILAC test reports

Important Clauses

Payment Terms

GST payable by bidder; payment terms to be specified in bid schedule; no default advance terms beyond standard government contract

Delivery Schedule

Delivery begins after last date of original delivery order; additional time computed as (increased quantity/original quantity) × original delivery period, minimum 30 days

Penalties/Liquidated Damages

Penalties/LD clauses to be defined per contract; implementation for late delivery or non‑compliant installation

Bidder Eligibility

  • No liquidation or bankruptcy proceedings; legal integrity verified

  • Financial statements demonstrating solvency and turnover capacity

  • Experience in supplying/installed lightning protection systems or related high‑altitude electrical protection

Authority & Contact

Department

Central Armed Police Forces

Office Name

14 Bn Ndrf

Grievance Contact

[email protected]

Tender Data

Bid Details

Quantity

3

Bid Type

Two Packet Bid

Bid Validity

90 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

H1-Highest Priced Bid Elimination

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

Yes

Startup Exemption/Relaxation

Yes

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

75

OEM Avg. Turnover

6

Past Performance

20 %

Experience Required

2 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

Advance Technology for Building Protection Lightning Arrester (Q3)

Delivery Details

Max Delivery Days

45

Delivery Locations

1

Delivery Cities

Kangra

Delivery Pincodes

176201

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Pawan Kumar176201,14 Bn National Disaster Response Force (NDRF), Jachh Jassur Camp, Nurpur, Disst- Kangra (HP)KangraHimachal Pradesh176201345-

Authority Records

MINISTRY OF HOME AFFAIRSNATIONAL DISASTER RESPONSE FORCE

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 3

GeM-Bidding-9677246.pdf

Main Document

CATALOG-Specification-1

CATALOG Specification

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Corrigendum Updates

1 Update
#1

Update

03-Aug-2026

Extended Deadline

06-Aug-2026, 7:30 am

Opening Date

06-Aug-2026, 8:00 am

Required Documents

1

GST certificate

2

PAN card

3

Experience certificates (similar projects)

4

Financial statements

5

EMD/Security deposit documentation

6

Technical data sheet for offered products

7

OEM authorizations (if applicable)

8

ISO quality certification proof

9

Test reports from NABL/ILAC accredited labs

10

Declaration of non‑liquidation/bankruptcy

Technical Specifications 1 Item

Item #1 Details

View Catalog
Category Specification Requirement
Specification Interception probability 98.0
Specification Lightning current peak value (minimum),kA 16
Specification Lightning current peak value (maximum),kA 200
Air terminal Rod Air terminal Rod height 3.0
Air terminal Rod Air terminal Rod Diameter 10.0
Air terminal Rod Air terminal Rod Material Copper
Round conductor Round conductor Diameter 8.0
Round conductor Round conductor Material Copper
Flat Conductor Flat Conductor Size(WxH), mm 30x3.5
Flat Conductor Flat Conductor Material Copper
Mast Mast Material Special Concrete Compound
Mast Mast Diameter 289.0
Lighiting Counter Protection rating Other prtection
Earthing Chamber Cover Size , mm 250x320x275
Earthing Earthing Rod Length 1.0
Earthing Earthing Rod Diameter 17.2
Earthing Chamber Cover material PVC Heavy Duty
Earthing Earthing Rod Material Coppper
Patti Patti Size 150x150x6
Clamp Clamp Size, mm 50x5
Clamp Clamp Material Stainless Steel
Insulator Insulator Size(HxW),mm 200x60
General Parameter Conformity of Electrical Standards EN 50164-6
General Parameter Warranty We have provided our product warranty for 5 years. If in that 5 years period lightning stroke occurs your building, equipment & humans are kept to be protected and not cause any injuries to them. But, the Lightning protection system gets damaged and required to install a new lightning protection system.
General Parameter Lightning protection Class LPL III
General Parameter Test Required Corrosion Test, Short time withstand current & peak withstand current, Proof Load Test
Test Report/Certification Availability Of Test Report From Central Govt/Nabl/Ilac Accredited Lab To Prove Conformity To Specification Yes
Test Report/Certification Manufacturer should have ISO certification for quality standards Yes

Frequently Asked Questions

Key insights about HIMACHAL PRADESH tender market

How to bid for the lightning protection tender in Himachal Pradesh?

Bidders must submit GST, PAN, experience certificates, financials, EMD, data sheet, and OEM authorizations. Ensure ISO quality certification and NABL/ILAC test reports. The bid requires alignment with IS standards, and the site locations in HP must be considered for delivery and installation.

What documents are required for the ND RF HP procurement bid 2026?

Required documents include GST certificate, PAN card, company financial statements, experience certificates for similar projects, EMD submission proof, technical data sheet for offered products, and ISO certification proof. OEM authorizations are needed if applicable; site visit documentation may be required.

What are the technical standards for the lightning protection system?

The tender demands conformity to electrical standards with test reports from NABL/ILAC‑accredited labs and ISO quality certification from the manufacturer. Specifications cover air terminal rods, conductors, mast, insulators, clamps, and chamber components with exact dimensions and materials.

What is the delivery timeline and option clause for quantity changes?

Delivery starts after the original delivery order; a 25% quantity variation is allowed. Additional time is calculated as (increase/original quantity) × original delivery period, with a minimum of 30 days. Bidders should plan for site delivery to three HP locations.

What is the role of data sheets in the bidding process?

Data sheets must precisely reflect offered products and match technical parameters. Any mismatch can lead to bid rejection. Include full specifications, materials, and conformity details for air terminal rods, conductors, and earthing components.

What are the required certifications and lab reports?

Manufacturers must provide ISO certification for quality standards and NABL/ILAC accredited lab test reports proving conformity to specification. These documents support compliance with IS standards and acceptance at the three HP installation sites.

Where will the lightning protection equipment be installed?

Installations are planned at three NDRF sites in Himachal Pradesh: Rampur, Slapper (Sundernagar), and Nalagarh. Bidders should factor travel, site readiness, and local regulatory requirements into delivery planning and coordination with the consignee.

What is the emphasis on warranty and post‑sale support?

Warranty terms relate to the lightning protection system and components; the tender requires conformity to minimum warranty standards and potential AMC; ensure the supplier provides clear warranty duration and post‑installation support commitments in the bid.