TenderDekho Logo
Active GEM

Indian Army Carrier Spare Parts Tender Hisar Haryana 2026 — Dozer Engine & Track Components ISO/IS Standards

Bid Publish Date

19-Sep-2026, 7:03 pm

Bid End Date

17-Oct-2026, 11:00 am

Generate Docs

Progress

Issue19-Sep-2026, 7:03 pm
Corrigendum06-Oct-2026
AwardPending

Key Highlights

  • • Military procurement context: Indian Army (Department Of Military Affairs) for heavy Dozer spare parts
  • • Location specificity: HISAR, HARYANA (125001)
  • • 15-item BOQ scope: Dozer components including Engine Kits, Piston rings, and Oil Filters
  • • Quantity variation: up to 25% increase/decrease at contract placement and during currency

Tender Overview

The Indian Army, Department Of Military Affairs, invites bids for a set of Dozer spare parts and related assemblies, including Carrier Roller, Universal Joint Assembly, Master Pin, Track Roller Assembly, Engine Kits and associated components such as Engine Oil Filters and Nozzle Pistons for the D80A12 Dozer. Located in HISAR, HARYANA, the procurement encompasses multiple components (15 items listed in the BOQ) with an unspecified estimated value and no explicit EMD amount disclosed in the tender data. The tender emphasizes a quantity variation clause of up to 25% at contract award and again during the currency of the contract, with delivery timelines linked to the original delivery order. An ATC document has been uploaded, indicating special terms to bidders. This opportunity targets OEMs or suppliers capable of delivering heavy equipment spares with military procurement rigor.

Technical Specifications & Requirements

  • No explicit technical specifications are published in the provided data; BOQ lists 15 items across spare parts for the D80A12 Dozer.
  • Items include: Carrier Roller, Universal Joint Assembly, Master Pin, Track Roller Assembly, Starter, Main Bearing, Nozzle Piston Cooling, Piston B Type, Engine Overall Kit, Engine Fuel Filter, Sprocket, Oil Ring Piston, Ring Piston Top, Ring Piston Second, Engine Oil Filter.
  • The Buyer Added Terms include an option clause allowing quantity adjustment up to 25% and a derived delivery extension rule: additional time = (additional quantity / original quantity) × original delivery period, with a minimum of 30 days; if original period < 30 days, time equals the original delivery period.
  • The ATC document suggests there are additional bidder requirements beyond standard tender terms.

Terms, Conditions & Eligibility

  • EMD and specific payment terms are not disclosed in the excerpt; bidders must comply with the Buyer Added Terms and ATC for delivery and variation of quantities.
  • Delivery period will be determined by the original delivery order, with scope to extend following the option clause; extensions follow the formula and minimum 30 days.
  • The procurement requires bidders to adhere to the option clause, ensuring compliance with quantity changes and contract rates across the extended period. Relevant documentation and vendor credentials should align with standard defense procurement practices and any OEM authorizations noted in the ATC.

Key Specifications

    • Product names and categories: Dozer spare parts for D80A12 family (15 items listed in BOQ)
    • Quantities: not specified in data; variation allowance up to 25% over contract quantity
    • EMD/Estimated value: not disclosed in provided excerpt
    • Experience: not stated; defense procurement context implies OEM/approved supplier capability
    • Standards/certifications: not specified in data; refer to ATC for required standards

Terms & Conditions

  • Option clause allowing ±25% quantity variation during contract

  • Delivery period linked to the last date of original delivery order with extended time rules

  • Delivery extensions calculated as (increased quantity ÷ original quantity) × original delivery period, minimum 30 days

Important Clauses

Delivery Terms

Delivery timeline starts from the last date of the original delivery order; option clause allows extended delivery time with calculated formula and minimum 30 days

Quantity Variation

Purchaser may increase or decrease quantity by up to 25% of bid/contract quantity at award and during contract currency at contracted rates

ATC Compliance

Bid submissions must adhere to Buyer Added Terms and Terms in the ATC document uploaded by Buyer

Bidder Eligibility

  • Ability to supply 15 listed Dozer spare parts for D80A12 Dozer

  • Compliance with ATC terms and any OEM authorizations

  • Financial stability demonstrated via annual turnover and financial statements

Advertisement

Tender Data

Bid Details

Quantity

54

Category

Carrier Roller

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

50% Lowest Priced Technically Qualified Bidders

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

Yes

Startup Exemption/Relaxation

Yes

Bid Splitting Applied

No

Requirements

Past Performance

50 %

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

Carrier Roller , Universal Joint Assy , Master Pin , Track Roller Assy , Starter , Cap Main Bearing , Nozzle Piston Cooling , Pistan B Type , Engine Overall Kit , Engine Fuel Filter , Sprocket for D80A12 Dozer , Oil Ring Piston for D80A12 Type Dozer , Ring Piston Top for D80A12 Type Dozer , Ring Piston Second for D80A12 Type Dozer , Engine Oil Filter for D80A12 Type Dozer

Advisory Bank

State Bank of India

ePBG Percentage

5%

ePBG Duration (Months)

12

Delivery Details

Max Delivery Days

30

Delivery Locations

1

Delivery Cities

Hisar

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-HisarHisar--430-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9916971.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

Indian Army

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Corrigendum Updates

4 Updates
#1

Update

06-Oct-2026

Extended Deadline

17-Oct-2026, 5:30 am

Opening Date

18-Oct-2026, 5:30 am

#2

Update

06-Oct-2026

Extended Deadline

09-Oct-2026, 5:30 am

Opening Date

10-Oct-2026, 5:30 am

#3

Update

03-Oct-2026

Extended Deadline

06-Oct-2026, 5:30 am

Opening Date

07-Oct-2026, 5:30 am

#4

Update

30-Sep-2026

Extended Deadline

03-Oct-2026, 5:30 am

Opening Date

04-Oct-2026, 5:30 am

Advertisement

Bill of Quantities (BOQ) 15 Items Sign in for GEM prices

#1

Carrier Roller

116TFB0181

4 pieces Delivery: 30 days
#2

Universal Joint Assy

116UJ02017

1 pieces Delivery: 30 days
#3

Master Pin

1408037190

2 pieces Delivery: 30 days
#4

Track Roller Assy

1543000400

4 pieces Delivery: 30 days
#5

Starter

41Z 8280804

1 pieces Delivery: 30 days
#6

Cap Main Bearing

31Z 2140115

6 pieces Delivery: 30 days
#7

Nozzle Piston Cooling

31Z 2100011

6 pieces Delivery: 30 days
#8

Pistan B Type

30Z 3180759

6 pieces Delivery: 30 days
#9

Engine Overall Kit

NaN

1 pieces Delivery: 30 days
#10

Engine Fuel Filter

41Z 7181537

1 pieces Delivery: 30 days
#11

Sprocket for D80A12 Dozer

116FD31329

2 pieces Delivery: 30 days
#12

Oil Ring Piston for D80A12 Type Dozer

30Z 3180167

6 pieces Delivery: 30 days
#13

Ring Piston Top for D80A12 Type Dozer

30Z 3180215

6 pieces Delivery: 30 days
#14

Ring Piston Second for D80A12 Type Dozer

30Z 3180678

6 pieces Delivery: 30 days
#15

Engine Oil Filter for D80A12 Type Dozer

30Z 5180443

2 pieces Delivery: 30 days

Categories 24

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates for similar Dozer spare parts supply

4

Financial statements for the last 2-3 years

5

EMD/Security deposit as per tender terms (amount not disclosed here)

6

Technical bid documents showing compliance with ATC

7

OEM authorization letters (if bidding as authorized distributor/partner)

8

Any specific certifications mentioned in the ATC

Frequently Asked Questions

Key insights about HARYANA tender market

How to bid for Dozer spare parts tender in Hisar?

Access the ATC document, confirm OEM authorizations, and ensure compliance with the option clause allowing 25% quantity variation. Prepare GST, PAN, experience evidence, financials, and EMD per terms; submit technical and commercial bids as required by the ATC.

What documents are required for Indian Army Dozer parts procurement?

Submit GST registration, PAN, 2-3 years of financial statements, prior experience certificates in similar Dozer spares, EMD/security deposit, OEM authorization letters, and technical bid documents detailing compliance with ATC standards and the 15-item BOQ.

What is the delivery extension formula for this tender?

If quantity increases, delivery time extends by (additional quantity ÷ original quantity) × original delivery period, with a minimum extension of 30 days; if original is under 30 days, extension equals the original period.

What are the key eligibility criteria for Dozer spare parts suppliers?

Demonstrate capability to supply D80A12 components, provide OEM authorizations if bidding as distributor, show financial stability via statements, and comply with ATC / GEM terms, including potential quantity variations.

What standards or certifications are required for Dozer spares procurement?

The tender data references ATC; bidders should verify IS/defense-related standards in the ATC and ensure any OEM certifications or parts compliance as specified by the Indian Army.

When is bid submission for the D80A12 spare parts tender due in Hisar?

Exact submission deadlines are not provided here; bidders must consult the ATC document and procurement portal updates for the bid notice date and last date of submission.

What is the scope of the 15-item BOQ for D80A12 Dozer spares?

BOQ includes Carrier Roller, Universal Joint Assembly, Master Pin, Track Roller Assembly, Starter, Main Bearing, Nozzle Piston Cooling, Piston B Type, Engine Kit, Engine Oil Filter, Sprocket, and ring/piston components for D80A12 Dozer; quantities are not disclosed in the excerpt.

How to verify OEM authorization for Dozer spare parts bidding?

Obtain OEM authorization letter or distributor agreement showing authorized supply rights for D80A12 components; submit with technical bid per ATC requirements and ensure correspondence with Army procurement standards.

Advertisement