SUPERDUTY BURNER BLOCK ( MAT CODE - 251051042)
Alloy Steel Plant
BARDHAMAN, WEST BENGAL
Bid Publish Date
12-Jun-2026, 12:52 pm
Bid End Date
22-Jun-2026, 6:00 pm
Location
Progress
Quantity
2
Category
Burner RLNG for Fire Tube Boiler Left side (Mat code: 261155801)
Bid Type
Two Packet Bid
The Alloy Steel Plant, a unit of Steel Authority of India Limited, seeks supply of Burner RLNG assemblies for Fire Tube Boilers—Left side (Mat code: 261155801) and Right side (Mat code: 261155802). No BOQ quantities are published, and the estimated contract value remains undisclosed. The scope centers on dual boiler burner components with distinct mat codes, under a single procurement umbrella by SAIL’s Alloy Steel Plant. Key differentiators include option clauses permitting up to 25% quantity variation and a risk-purchase clause for non-delivery, emphasizing delivery reliability and post-award flexibility. This tender uses standard vendor code creation requirements and indemnifies against partial delivery failure through risk purchase. The location and start/end dates are not disclosed, but the procurement is tied to burner RLNG for fire-tube boiler configurations.
Product: Burner RLNG assemblies for Fire Tube Boiler
Mat codes: 261155801 (Left side), 261155802 (Right side)
Inspection: Post Receipt Inspection at INDENTOR at ASP
Delivery: Based on last date of original delivery order with option for extension
ATC: Includes Risk Purchase and Bid Securing Declaration
Delivery quantity may vary up to 25% during contract
Bid Security Declaration required for participation
Post receipt inspection at ASP; pre-dispatch inspection not indicated
Details not provided in extract; terms to be clarified in RFP/ATC.
Delivery period begins from last date of original delivery order; extension rules apply up to original period with minimum 30 days.
Risk purchase option allows procurement elsewhere at supplier's cost; price differential borne by defaulting supplier.
Must submit PAN Card, GSTIN, cancelled cheque, and EFT mandate
Provide Bid Securing Declaration as per ATC
Must meet post-award inspection requirement at ASP
No BOQ items published; bidders should be prepared for quantity variation up to 25%
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Burner RLNG for Fire Tube Boiler Left side (Mat code: 261155801) , Burner RLNG for Fire Tube Boiler Right side (Mat code: 261155802)
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Alloy Steel Plant
BARDHAMAN, WEST BENGAL
Alloy Steel Plant
BARDHAMAN, WEST BENGAL
Alloy Steel Plant
BARDHAMAN, WEST BENGAL
Bharat Heavy Electricals Limited (bhel)
Indian Navy
MUMBAI, MAHARASHTRA
Tender Results
Loading results...
Discover companies most likely to bid on this tender
Copy of PAN Card
Copy of GSTIN
Copy of Cancelled Cheque
Copy of EFT Mandate certified by Bank
Bid Securing Declaration (Annexure-1) as part of ATC
Any OEM authorizations or technical compliance certificates if applicable
Experience certificates and financial statements (as applicable under ATC)
Key insights about WEST BENGAL tender market
Bidders must submit PAN, GSTIN, cancelled cheque, and EFT mandate; sign the Bid Securing Declaration, and comply with ATC risk-purchase provisions. Deliver RLNG burner assemblies for Fire Tube Boilers Left (261155801) and Right (261155802). Ensure readiness for post-receipt inspection at ASP and align with 25% quantity variation rights.
Submit PAN Card, GSTIN, Cancelled Cheque, and EFT Mandate certified by bank; include Bid Securing Declaration and any OEM authorizations if applicable. Prepare experience certificates and financial statements to support eligibility for Alloy Steel Plant procurement.
The tender specifies RLNG burners for Fire Tube Boilers with mat codes 261155801 (Left) and 261155802 (Right). No explicit dimensional or performance specs are published in this extract; bidders should reference the ATC for standards and any OEM requirements during bid submission.
Delivery starts from the last date of the original delivery order; option to increase quantity up to 25% may extend the period. If extension occurs, additional time is calculated as (increased/original) × original period, with a minimum of 30 days.
If the supplier fails to deliver, the purchaser may procure from an alternate source at the supplier's risk and cost; the price differential becomes the supplier's responsibility, and the defaulting supplier has no claim on undelivered quantities.
Post receipt inspection will be conducted at the indentor ASP site; pre-dispatch inspection is not specified in this ATC. Suppliers should be prepared for post-delivery verification and acceptance testing.
Alloy Steel Plant
📍 BARDHAMAN, WEST BENGAL
Alloy Steel Plant
📍 BARDHAMAN, WEST BENGAL
Alloy Steel Plant
📍 BARDHAMAN, WEST BENGAL
Alloy Steel Plant
📍 BARDHAMAN, WEST BENGAL
Alloy Steel Plant
📍 BARDHAMAN, WEST BENGAL
Sign up now to access all documents
Main Document
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS