TenderDekho Logo
Closed GEM

Open Tender for As per deliverables stage 1 indicated at SCC,Receipt of new LARS from NIOT OEM and safe storage at in KANCHIPURAM, TAMIL NADU

Bid Publish Date

03-Dec-2025, 10:55 am

Bid End Date

26-Mar-2026, 11:00 am

EMD

₹24,00,000

Value

₹12,00,00,000

Generate Docs

Progress

Issue03-Dec-2025, 10:55 am
Technical26-03-2026 09:50:55
Financial
AwardCompleted
Explore all 4 tabs to view complete tender details

Quantity

7

Category

As per deliverables stage 1 indicated at SCC

Bid Type

Two Packet Bid

Categories 14

National Institute Of Ocean Technology (niot) has released a public tender for As per deliverables stage 1 indicated at SCC, Receipt of new LARS from NIOT OEM and safe storage at shipyard premises as specified in the scope of work, stage 2 point f, Removal of the existing A Frame onboard Ship incl. of two hyd. cylinders, pistons, foundation and existing deep sea winch. Handing over the two items to NIOT nominated contractor with full Docs, Modification of ship structure and other systems along with cabling, piping and necessary power points as mentioned in the proposed modification report approved by both class IRS and DNV in dry dock, Completion of intgr of LARS by successfully completing of inst comm and HAT of new LARS onboard Ship alongwith OEM Necessary support for SAT will be carried out by NIOT and OEM, Cost for per kg steel weight renewal in case of additional repair work with maximum additional steel work be limited to 5 Tons, All risk insurance for new LARS and from date of receipt at Shipyard till successful completion of HAT and SAT All risk insurance for the ship, people, NIOT property during drydock period as per NIT in KANCHIPURAM, TAMIL NADU. Quantity: 7. Submission Deadline: 26-03-2026 11: 00: 00. Download documents and apply online.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

As per deliverables stage 1 indicated at SCC , Receipt of new LARS from NIOT OEM and safe storage at shipyard premises as specified in the scope of work, stage 2 point f , Removal of the existing A Frame onboard Ship incl. of two hyd.cylinders, pistons, foundation and existing deep sea winch. Handing over the two items to NIOT nominated contractor with full Docs , Modification of ship structure and other systems along with cabling, piping and necessary power points as mentioned in the proposed modification report approved by both class IRS and DNV in dry dock , Completion of intgr of LARS by successfully completing of inst comm and HAT of new LARS onboard Ship alongwith OEM Necessary support for SAT will be carried out by NIOT and OEM , Cost for per kg steel weight renewal in case of additional repair work with maximum additional steel work be limited to 5 Tons , All risk insurance for new LARS and from date of receipt at Shipyard till successful completion of HAT and SAT All risk insurance for the ship, people, NIOT property during drydock period as per NIT

Authority Records

MINISTRY OF EARTH SCIENCESEARTH SCIENCES DEPARTMENTNATIONAL INSTITUTE OF OCEAN TECHNOLOGY

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-8665629.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 7 Items Sign in for GEM prices

#1

As per deliverables stage 1 indicated at SCC

Replacement of Existing LARS and Class Approval

1 lumpsum Delivery: 100 days
#2

Receipt of new LARS from NIOT OEM and safe storage at shipyard premises as specified in the scope of work, stage 2 point f

Receipt of New LARS

1 lumpsum Delivery: 100 days
#3

Removal of the existing A Frame onboard Ship incl. of two hyd.cylinders, pistons, foundation and existing deep sea winch. Handing over the two items to NIOT nominated contractor with full Docs

Removal of Existing LARS

1 lumpsum Delivery: 100 days
#4

Modification of ship structure and other systems along with cabling, piping and necessary power points as mentioned in the proposed modification report approved by both class IRS and DNV in dry dock

Modification of ship structures

1 lumpsum Delivery: 100 days
#5

Completion of intgr of LARS by successfully completing of inst comm and HAT of new LARS onboard Ship alongwith OEM Necessary support for SAT will be carried out by NIOT and OEM

Completion of Integration of LARS

1 lumpsum Delivery: 100 days
#6

Cost for per kg steel weight renewal in case of additional repair work with maximum additional steel work be limited to 5 Tons

Additional Repair Works

1 lumpsum Delivery: 100 days
#7

All risk insurance for new LARS and from date of receipt at Shipyard till successful completion of HAT and SAT All risk insurance for the ship, people, NIOT property during drydock period as per NIT

All Risk Insurance

1 lumpsum Delivery: 100 days

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

OEM Annual Turnover

7

Additional Doc 1 (Requested in ATC)

8

Additional Doc 2 (Requested in ATC)

9

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

10

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Corrigendum Updates

11 Updates
#1

Update

11-Mar-2026
#2

Update

11-Mar-2026

Extended Deadline

26-Mar-2026, 11:00 am

Opening Date

26-Mar-2026, 11:30 am

#3

Update

11-Mar-2026
#4

Update

09-Mar-2026

Extended Deadline

24-Mar-2026, 11:00 am

Opening Date

24-Mar-2026, 11:30 am

#5

Update

02-Mar-2026

Extended Deadline

10-Mar-2026, 11:00 am

Opening Date

10-Mar-2026, 11:30 am

#6

Update

16-Feb-2026

Extended Deadline

03-Mar-2026, 11:00 am

Opening Date

03-Mar-2026, 11:30 am

#7

Update

03-Feb-2026

Extended Deadline

17-Feb-2026, 11:00 am

Opening Date

17-Feb-2026, 11:30 am

#8

Update

21-Jan-2026

Extended Deadline

04-Feb-2026, 11:00 am

Opening Date

04-Feb-2026, 11:30 am

#9

Update

01-Jan-2026
#10

Update

01-Jan-2026

Extended Deadline

22-Jan-2026, 11:00 am

Opening Date

22-Jan-2026, 11:30 am

#11

Update

15-Dec-2025

Technical Results

S.No Seller Item Date Status
1
COCHIN SHIPYARD LIMITED   Under PMA
-26-03-2026 09:50:55
2
LARSEN AND TOUBRO LIMITED   Under PMA
-26-03-2026 10:38:54

Financial Results

Rank Seller Price Item
L1
LARSEN AND TOUBRO LIMITED(MII)   Under PMA
Item Categories : As per deliverables stage 1 indicated at SCC,Receipt of new LARS from NIOT OEM and safe storage at