Bid Publish Date
03-Dec-2025, 10:55 am
Bid End Date
26-Mar-2026, 11:00 am
EMD
₹24,00,000
Value
₹12,00,00,000
Location
Progress
Quantity
7
Category
As per deliverables stage 1 indicated at SCC
Bid Type
Two Packet Bid
National Institute Of Ocean Technology (niot) has released a public tender for As per deliverables stage 1 indicated at SCC, Receipt of new LARS from NIOT OEM and safe storage at shipyard premises as specified in the scope of work, stage 2 point f, Removal of the existing A Frame onboard Ship incl. of two hyd. cylinders, pistons, foundation and existing deep sea winch. Handing over the two items to NIOT nominated contractor with full Docs, Modification of ship structure and other systems along with cabling, piping and necessary power points as mentioned in the proposed modification report approved by both class IRS and DNV in dry dock, Completion of intgr of LARS by successfully completing of inst comm and HAT of new LARS onboard Ship alongwith OEM Necessary support for SAT will be carried out by NIOT and OEM, Cost for per kg steel weight renewal in case of additional repair work with maximum additional steel work be limited to 5 Tons, All risk insurance for new LARS and from date of receipt at Shipyard till successful completion of HAT and SAT All risk insurance for the ship, people, NIOT property during drydock period as per NIT in KANCHIPURAM, TAMIL NADU. Quantity: 7. Submission Deadline: 26-03-2026 11: 00: 00. Download documents and apply online.
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
As per deliverables stage 1 indicated at SCC , Receipt of new LARS from NIOT OEM and safe storage at shipyard premises as specified in the scope of work, stage 2 point f , Removal of the existing A Frame onboard Ship incl. of two hyd.cylinders, pistons, foundation and existing deep sea winch. Handing over the two items to NIOT nominated contractor with full Docs , Modification of ship structure and other systems along with cabling, piping and necessary power points as mentioned in the proposed modification report approved by both class IRS and DNV in dry dock , Completion of intgr of LARS by successfully completing of inst comm and HAT of new LARS onboard Ship alongwith OEM Necessary support for SAT will be carried out by NIOT and OEM , Cost for per kg steel weight renewal in case of additional repair work with maximum additional steel work be limited to 5 Tons , All risk insurance for new LARS and from date of receipt at Shipyard till successful completion of HAT and SAT All risk insurance for the ship, people, NIOT property during drydock period as per NIT
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
As per deliverables stage 1 indicated at SCC
Replacement of Existing LARS and Class Approval
Receipt of new LARS from NIOT OEM and safe storage at shipyard premises as specified in the scope of work, stage 2 point f
Receipt of New LARS
Removal of the existing A Frame onboard Ship incl. of two hyd.cylinders, pistons, foundation and existing deep sea winch. Handing over the two items to NIOT nominated contractor with full Docs
Removal of Existing LARS
Modification of ship structure and other systems along with cabling, piping and necessary power points as mentioned in the proposed modification report approved by both class IRS and DNV in dry dock
Modification of ship structures
Completion of intgr of LARS by successfully completing of inst comm and HAT of new LARS onboard Ship alongwith OEM Necessary support for SAT will be carried out by NIOT and OEM
Completion of Integration of LARS
Cost for per kg steel weight renewal in case of additional repair work with maximum additional steel work be limited to 5 Tons
Additional Repair Works
All risk insurance for new LARS and from date of receipt at Shipyard till successful completion of HAT and SAT All risk insurance for the ship, people, NIOT property during drydock period as per NIT
All Risk Insurance
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | As per deliverables stage 1 indicated at SCC | Replacement of Existing LARS and Class Approval | 1 | lumpsum | snpabove25 | 100 | |
| 2 | Receipt of new LARS from NIOT OEM and safe storage at shipyard premises as specified in the scope of work, stage 2 point f | Receipt of New LARS | 1 | lumpsum | snpabove25 | 100 | |
| 3 | Removal of the existing A Frame onboard Ship incl. of two hyd.cylinders, pistons, foundation and existing deep sea winch. Handing over the two items to NIOT nominated contractor with full Docs | Removal of Existing LARS | 1 | lumpsum | snpabove25 | 100 | |
| 4 | Modification of ship structure and other systems along with cabling, piping and necessary power points as mentioned in the proposed modification report approved by both class IRS and DNV in dry dock | Modification of ship structures | 1 | lumpsum | snpabove25 | 100 | |
| 5 | Completion of intgr of LARS by successfully completing of inst comm and HAT of new LARS onboard Ship alongwith OEM Necessary support for SAT will be carried out by NIOT and OEM | Completion of Integration of LARS | 1 | lumpsum | snpabove25 | 100 | |
| 6 | Cost for per kg steel weight renewal in case of additional repair work with maximum additional steel work be limited to 5 Tons | Additional Repair Works | 1 | lumpsum | snpabove25 | 100 | |
| 7 | All risk insurance for new LARS and from date of receipt at Shipyard till successful completion of HAT and SAT All risk insurance for the ship, people, NIOT property during drydock period as per NIT | All Risk Insurance | 1 | lumpsum | snpabove25 | 100 |
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
OEM Annual Turnover
Additional Doc 1 (Requested in ATC)
Additional Doc 2 (Requested in ATC)
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Extended Deadline
26-Mar-2026, 11:00 am
Opening Date
26-Mar-2026, 11:30 am
Extended Deadline
24-Mar-2026, 11:00 am
Opening Date
24-Mar-2026, 11:30 am
Extended Deadline
10-Mar-2026, 11:00 am
Opening Date
10-Mar-2026, 11:30 am
Extended Deadline
03-Mar-2026, 11:00 am
Opening Date
03-Mar-2026, 11:30 am
Extended Deadline
17-Feb-2026, 11:00 am
Opening Date
17-Feb-2026, 11:30 am
Extended Deadline
04-Feb-2026, 11:00 am
Opening Date
04-Feb-2026, 11:30 am
Extended Deadline
22-Jan-2026, 11:00 am
Opening Date
22-Jan-2026, 11:30 am
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | COCHIN SHIPYARD LIMITED Under PMA | - | 26-03-2026 09:50:55 | |
| 2 | LARSEN AND TOUBRO LIMITED Under PMA | - | 26-03-2026 10:38:54 |
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | LARSEN AND TOUBRO LIMITED(MII) Under PMA | Item Categories : As per deliverables stage 1 indicated at SCC,Receipt of new LARS from NIOT OEM and safe storage at |
Sign up now to access all documents
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS