TenderDekho Logo
Active GEM

Bharat Petroleum Corporation Ltd Security Equipment Tender SAGAR Madhya Pradesh 2026

Bid Publish Date

12-Oct-2026, 5:35 pm

Bid End Date

26-Oct-2026, 12:00 pm

Progress

Issue12-Oct-2026, 5:35 pm
AwardPending

Key Highlights

  • • Purchase preference to MSEs under Micro and Small Enterprises policy with manufacturer-only eligibility
  • • Up to 25% quantity increase during contract and at order placement; extended delivery time formula
  • • Delivery timing calculations: (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days
  • • RFQ Document terms on GeM override standard GeM General Terms and Conditions

Tender Overview

Bharat Petroleum Corporation Ltd invites bids for a security equipment procurement in SAGAR, Madhya Pradesh (470001). The project references a BOQ with 62 items (items listed as N/A in data) and will be governed by RFQ terms uploaded on GeM. The contract may allow quantity variation up to 25% during placement and during the contract period, with a calculated extended delivery time formula. An MSE purchase preference applies if the bidder is the manufacturer and meets policy criteria. Inspection and RFQ-based compliance form key differentiators.

Technical Specifications & Requirements

  • No explicit technical specifications provided in the data; bidders must rely on RFQ documents uploaded on GeM for product/service scope.
  • Key governing clauses include: option to adjust quantity by up to 25%, extended delivery time calculations, and adherence to RFQ Terms overriding GeM GTC.
  • Inspection requirements are defined in the RFQ documents, with the purchase governed by GeM upload terms.
  • The tender origin is BPCL with locality in SAGAR, MP; 62 items indicate broad scope though item details are not disclosed here.

Terms, Conditions & Eligibility

  • Purchase preference for MSEs as per policy; bidder must be the manufacturer of the offered product to avail preference. Traders excluded.
  • Option clause allows quantity variation and extended delivery period; bidders must comply.
  • Tender is governed by RFQ document terms uploaded on GeM; RFQ terms override GTC.
  • Inspection as per RFQ clauses; exact document requirements and EMD details are specified in the RFQ.

Key Specifications

    • Product/service names and category: Security equipment procurement (as per RFQ)
    • Quantity details: 62 BOQ items (specific quantities not disclosed in data)
    • EMD/Estimated value: Not disclosed in provided data; refer to RFQ terms
    • Standards/certifications: Not specified in data; check RFQ
    • Delivery/Installation: Extended delivery period formula; minimum 30 days
    • Warranty/Support: Not specified in data; check RFQ terms

Terms & Conditions

  • Key Term 1: 25% quantity variation allowed during order and contract execution

  • Key Term 2: MSE purchase preference available only to manufacturers; traders excluded

  • Key Term 3: RFQ Document terms govern inspection and compliance; GeM GTC overridden

Important Clauses

Option Clause - Quantity Variation

Purchaser may increase/decrease quantity up to 25% at contract placement and during currency, with delivery time adjusted accordingly.

MSE Purchase Preference

Only manufacturers qualify for MSE preference; price matching within L1+15% for 25% contract value if applicable.

Inspection & RFQ Terms

Inspection as per RFQ documents uploaded on GeM; terms override GeM GTC and other disclaimers.

Bidder Eligibility

  • Manufacturer status required for MSE preference

  • Compliance with RFQ terms and inspection clauses

  • Submission of all mandatory documents listed in RFQ and GeM portal

Advertisement

Tender Data

Bid Details

Quantity

73

Category

Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 1

Bid Type

Two Packet Bid

Bid Validity

120 (Days)

Bid Type

Service

Evaluation

Item wise evaluation

Inspection Required

No

Tech Clarification Time

3 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Advisory Bank

ICICI

ePBG Percentage

5%

ePBG Duration (Months)

29

Payment Timelines

Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

150

Delivery Locations

1

Delivery Cities

Sagar

Delivery Pincodes

470113

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Shahazade Salim Shakil Ahmed470113,Administrative Building, Bharat Petroleum Corporation Limited, BinaSagarMadhya Pradesh4701131150-

Authority Records

MINISTRY OF PETROLEUM AND NATURAL GASBHARAT PETROLEUM CORPORATION LTD

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-10023248.pdf

Main Document

Other Documents

OTHER

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Office Name

Bina Petchem And Refinery Expansion Project

Grievance Contact

[email protected]

Bill of Quantities (BOQ) 62 Items Sign in for GEM prices

#1

Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 1

AS PER MR

1 nos Delivery: 150 days
#2

Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 2

AS PER MR

1 nos Delivery: 150 days
#3

Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 3

AS PER MR

1 nos Delivery: 150 days
#4

Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 4

AS PER MR

1 nos Delivery: 150 days
#5

Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 5

AS PER MR

1 nos Delivery: 150 days
#6

Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 6

AS PER MR

1 nos Delivery: 150 days
#7

Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 7

AS PER MR

1 nos Delivery: 150 days
#8

Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 8

AS PER MR

1 nos Delivery: 150 days
#9

Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 9

AS PER MR

2 nos Delivery: 150 days
#10

Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 10

AS PER MR

2 nos Delivery: 150 days
#11

Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 11

AS PER MR

1 nos Delivery: 150 days
#12

Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 12

AS PER MR

1 nos Delivery: 150 days
#13

Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 13

AS PER MR

1 nos Delivery: 150 days
#14

Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 14

AS PER MR

2 nos Delivery: 150 days
#15

Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 15

AS PER MR

1 nos Delivery: 150 days
#16

Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 16

AS PER MR

1 nos Delivery: 150 days
#17

Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 17

AS PER MR

1 nos Delivery: 150 days
#18

Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 18

AS PER MR

1 nos Delivery: 150 days
#19

Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 19

AS PER MR

2 nos Delivery: 150 days
#20

Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 20

AS PER MR

2 nos Delivery: 150 days
#21

Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 21

AS PER MR

2 nos Delivery: 150 days
#22

Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 22

AS PER MR

2 nos Delivery: 150 days
#23

Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 23

AS PER MR

2 nos Delivery: 150 days
#24

Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 24

AS PER MR

2 nos Delivery: 150 days
#25

Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 25

AS PER MR

1 nos Delivery: 150 days
#26

Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 26

AS PER MR

1 nos Delivery: 150 days
#27

Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 27

AS PER MR

1 nos Delivery: 150 days
#28

Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 28

AS PER MR

1 nos Delivery: 150 days
#29

Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 29

AS PER MR

1 nos Delivery: 150 days
#30

Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 30

AS PER MR

2 nos Delivery: 150 days
#31

Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 31

AS PER MR

2 nos Delivery: 150 days
#32

Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 32

AS PER MR

1 nos Delivery: 150 days
#33

Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 33

AS PER MR

1 nos Delivery: 150 days
#34

Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 34

AS PER MR

1 nos Delivery: 150 days
#35

Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 35

AS PER MR

1 nos Delivery: 150 days
#36

Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 36

AS PER MR

1 nos Delivery: 150 days
#37

Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 37

AS PER MR

1 nos Delivery: 150 days
#38

Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 38

AS PER MR

1 nos Delivery: 150 days
#39

Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 39

AS PER MR

1 nos Delivery: 150 days
#40

Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 40

AS PER MR

1 nos Delivery: 150 days
#41

Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 41

AS PER MR

1 nos Delivery: 150 days
#42

Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 42

AS PER MR

1 nos Delivery: 150 days
#43

Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 43

AS PER MR

1 nos Delivery: 150 days
#44

Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 44

AS PER MR

1 nos Delivery: 150 days
#45

Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 45

AS PER MR

1 nos Delivery: 150 days
#46

Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 46

AS PER MR

1 nos Delivery: 150 days
#47

Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 47

AS PER MR

1 nos Delivery: 150 days
#48

Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 48

AS PER MR

1 nos Delivery: 150 days
#49

Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 49

AS PER MR

1 nos Delivery: 150 days
#50

Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 50

AS PER MR

1 nos Delivery: 150 days
#51

Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 51

AS PER MR

1 nos Delivery: 150 days
#52

Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 52

AS PER MR

1 nos Delivery: 150 days
#53

Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 53

AS PER MR

1 nos Delivery: 150 days
#54

Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 54

AS PER MR

1 nos Delivery: 150 days
#55

Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 55

AS PER MR

1 nos Delivery: 150 days
#56

Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 56

AS PER MR

1 nos Delivery: 150 days
#57

Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 57

AS PER MR

1 nos Delivery: 150 days
#58

Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 58

AS PER MR

1 nos Delivery: 150 days
#59

Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 59

AS PER MR

1 nos Delivery: 150 days
#60

Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 60

AS PER MR

1 nos Delivery: 150 days
#61

Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 61

AS PER MR

1 nos Delivery: 150 days
#62

Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 62

AS PER MR

1 nos Delivery: 150 days
Advertisement

Categories 2

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

PAN card

3

Experience certificates for similar security equipment procurements

4

Financial statements / solvency certificate

5

EMD/Security deposit as per RFQ terms

6

Technical bid documents and compliance certificates

7

OEM authorizations (if applicable)

Frequently Asked Questions

Key insights about MADHYA PRADESH tender market

How to participate in BPCL security equipment tender in SAGAR 2026

Bidders should review the RFQ on GeM for BPCL SAGAR. Prepare GST, PAN, experience certificates, financials, and EMD per RFQ terms. Ensure you are the manufacturer to claim MSE preference and submit OEM authorizations if required. Follow inspection criteria in the RFQ documents.

What documents are required for BPCL GeM tender submission in Madhya Pradesh

Submit GST registration, PAN, experience certificates for similar security equipment, financial statements, EMD, technical bid documents, and OEM authorizations if applicable. Ensure all documents align with GeM RFQ terms and the BPCL inspection requirements.

What does the 25% quantity variation clause mean in this BPCL tender

The purchaser may increase or decrease the bid quantity by up to 25% at contract placement and during the currency. Delivery time adjusts using the formula: (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days.

What are the inspection requirements for BPCL SAGAR tender

Inspection will be conducted as per RFQ documents uploaded on GeM. Ensure compliance with listed inspection criteria, and be prepared to provide relevant quality assurances, certifications, and on-site verification as defined in the RFQ.

What is the MSE purchase preference criteria for this BPCL tender in MP

MSE preference applies to bidders who are manufacturers of the offered product; traders are excluded. If L1 is not an MSE and an MSE supplier quotes within L1+15%, they may get an opportunity to match L1 price for up to 25% of contract value.

Where can I find the exact BOQ items and quantities for BPCL SAGAR

The tender indicates 62 BOQ items with quantities not disclosed here. Refer to the GeM RFQ document for itemized list, specifications, and quantity ranges; ensure your bid aligns with the official BOQ in the RFQ.

What are the delivery terms for BPCL SAGAR security equipment tender

Delivery period is linked to the original and extended delivery periods per the option clause. If extended due to quantity changes, the new period is calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days.

What standards or certifications are mandated for BPCL security procurement 2026

The tender data provided does not specify standards; bidders must consult the RFQ documents on GeM for any ISI, ISO, or other certifications required and include them in the technical bid and compliance certificates.

Advertisement