Bid Publish Date
12-Oct-2026, 5:35 pm
Bid End Date
26-Oct-2026, 12:00 pm
Location
Progress
Bharat Petroleum Corporation Ltd invites bids for a security equipment procurement in SAGAR, Madhya Pradesh (470001). The project references a BOQ with 62 items (items listed as N/A in data) and will be governed by RFQ terms uploaded on GeM. The contract may allow quantity variation up to 25% during placement and during the contract period, with a calculated extended delivery time formula. An MSE purchase preference applies if the bidder is the manufacturer and meets policy criteria. Inspection and RFQ-based compliance form key differentiators.
Key Term 1: 25% quantity variation allowed during order and contract execution
Key Term 2: MSE purchase preference available only to manufacturers; traders excluded
Key Term 3: RFQ Document terms govern inspection and compliance; GeM GTC overridden
Purchaser may increase/decrease quantity up to 25% at contract placement and during currency, with delivery time adjusted accordingly.
Only manufacturers qualify for MSE preference; price matching within L1+15% for 25% contract value if applicable.
Inspection as per RFQ documents uploaded on GeM; terms override GeM GTC and other disclaimers.
Manufacturer status required for MSE preference
Compliance with RFQ terms and inspection clauses
Submission of all mandatory documents listed in RFQ and GeM portal
Quantity
73
Category
Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 1
Bid Type
Two Packet Bid
Bid Validity
120 (Days)
Bid Type
Service
Evaluation
Item wise evaluation
Inspection Required
No
Tech Clarification Time
3 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Advisory Bank
ICICI
ePBG Percentage
5%
ePBG Duration (Months)
29
Payment Timelines
Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
150
Delivery Locations
1
Delivery Cities
Sagar
Delivery Pincodes
470113
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Shahazade Salim Shakil Ahmed | 470113,Administrative Building, Bharat Petroleum Corporation Limited, Bina | Sagar | Madhya Pradesh | 470113 | 1 | 150 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 1
AS PER MR
Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 2
AS PER MR
Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 3
AS PER MR
Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 4
AS PER MR
Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 5
AS PER MR
Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 6
AS PER MR
Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 7
AS PER MR
Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 8
AS PER MR
Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 9
AS PER MR
Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 10
AS PER MR
Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 11
AS PER MR
Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 12
AS PER MR
Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 13
AS PER MR
Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 14
AS PER MR
Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 15
AS PER MR
Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 16
AS PER MR
Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 17
AS PER MR
Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 18
AS PER MR
Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 19
AS PER MR
Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 20
AS PER MR
Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 21
AS PER MR
Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 22
AS PER MR
Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 23
AS PER MR
Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 24
AS PER MR
Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 25
AS PER MR
Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 26
AS PER MR
Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 27
AS PER MR
Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 28
AS PER MR
Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 29
AS PER MR
Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 30
AS PER MR
Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 31
AS PER MR
Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 32
AS PER MR
Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 33
AS PER MR
Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 34
AS PER MR
Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 35
AS PER MR
Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 36
AS PER MR
Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 37
AS PER MR
Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 38
AS PER MR
Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 39
AS PER MR
Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 40
AS PER MR
Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 41
AS PER MR
Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 42
AS PER MR
Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 43
AS PER MR
Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 44
AS PER MR
Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 45
AS PER MR
Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 46
AS PER MR
Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 47
AS PER MR
Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 48
AS PER MR
Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 49
AS PER MR
Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 50
AS PER MR
Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 51
AS PER MR
Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 52
AS PER MR
Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 53
AS PER MR
Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 54
AS PER MR
Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 55
AS PER MR
Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 56
AS PER MR
Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 57
AS PER MR
Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 58
AS PER MR
Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 59
AS PER MR
Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 60
AS PER MR
Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 61
AS PER MR
Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 62
AS PER MR
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 1 | AS PER MR | 1 | nos | bprepbuyer3 | 150 | |
| 2 | Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 2 | AS PER MR | 1 | nos | bprepbuyer3 | 150 | |
| 3 | Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 3 | AS PER MR | 1 | nos | bprepbuyer3 | 150 | |
| 4 | Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 4 | AS PER MR | 1 | nos | bprepbuyer3 | 150 | |
| 5 | Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 5 | AS PER MR | 1 | nos | bprepbuyer3 | 150 | |
| 6 | Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 6 | AS PER MR | 1 | nos | bprepbuyer3 | 150 | |
| 7 | Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 7 | AS PER MR | 1 | nos | bprepbuyer3 | 150 | |
| 8 | Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 8 | AS PER MR | 1 | nos | bprepbuyer3 | 150 | |
| 9 | Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 9 | AS PER MR | 2 | nos | bprepbuyer3 | 150 | |
| 10 | Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 10 | AS PER MR | 2 | nos | bprepbuyer3 | 150 | |
| 11 | Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 11 | AS PER MR | 1 | nos | bprepbuyer3 | 150 | |
| 12 | Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 12 | AS PER MR | 1 | nos | bprepbuyer3 | 150 | |
| 13 | Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 13 | AS PER MR | 1 | nos | bprepbuyer3 | 150 | |
| 14 | Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 14 | AS PER MR | 2 | nos | bprepbuyer3 | 150 | |
| 15 | Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 15 | AS PER MR | 1 | nos | bprepbuyer3 | 150 | |
| 16 | Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 16 | AS PER MR | 1 | nos | bprepbuyer3 | 150 | |
| 17 | Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 17 | AS PER MR | 1 | nos | bprepbuyer3 | 150 | |
| 18 | Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 18 | AS PER MR | 1 | nos | bprepbuyer3 | 150 | |
| 19 | Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 19 | AS PER MR | 2 | nos | bprepbuyer3 | 150 | |
| 20 | Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 20 | AS PER MR | 2 | nos | bprepbuyer3 | 150 | |
| 21 | Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 21 | AS PER MR | 2 | nos | bprepbuyer3 | 150 | |
| 22 | Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 22 | AS PER MR | 2 | nos | bprepbuyer3 | 150 | |
| 23 | Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 23 | AS PER MR | 2 | nos | bprepbuyer3 | 150 | |
| 24 | Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 24 | AS PER MR | 2 | nos | bprepbuyer3 | 150 | |
| 25 | Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 25 | AS PER MR | 1 | nos | bprepbuyer3 | 150 | |
| 26 | Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 26 | AS PER MR | 1 | nos | bprepbuyer3 | 150 | |
| 27 | Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 27 | AS PER MR | 1 | nos | bprepbuyer3 | 150 | |
| 28 | Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 28 | AS PER MR | 1 | nos | bprepbuyer3 | 150 | |
| 29 | Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 29 | AS PER MR | 1 | nos | bprepbuyer3 | 150 | |
| 30 | Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 30 | AS PER MR | 2 | nos | bprepbuyer3 | 150 | |
| 31 | Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 31 | AS PER MR | 2 | nos | bprepbuyer3 | 150 | |
| 32 | Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 32 | AS PER MR | 1 | nos | bprepbuyer3 | 150 | |
| 33 | Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 33 | AS PER MR | 1 | nos | bprepbuyer3 | 150 | |
| 34 | Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 34 | AS PER MR | 1 | nos | bprepbuyer3 | 150 | |
| 35 | Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 35 | AS PER MR | 1 | nos | bprepbuyer3 | 150 | |
| 36 | Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 36 | AS PER MR | 1 | nos | bprepbuyer3 | 150 | |
| 37 | Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 37 | AS PER MR | 1 | nos | bprepbuyer3 | 150 | |
| 38 | Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 38 | AS PER MR | 1 | nos | bprepbuyer3 | 150 | |
| 39 | Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 39 | AS PER MR | 1 | nos | bprepbuyer3 | 150 | |
| 40 | Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 40 | AS PER MR | 1 | nos | bprepbuyer3 | 150 | |
| 41 | Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 41 | AS PER MR | 1 | nos | bprepbuyer3 | 150 | |
| 42 | Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 42 | AS PER MR | 1 | nos | bprepbuyer3 | 150 | |
| 43 | Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 43 | AS PER MR | 1 | nos | bprepbuyer3 | 150 | |
| 44 | Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 44 | AS PER MR | 1 | nos | bprepbuyer3 | 150 | |
| 45 | Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 45 | AS PER MR | 1 | nos | bprepbuyer3 | 150 | |
| 46 | Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 46 | AS PER MR | 1 | nos | bprepbuyer3 | 150 | |
| 47 | Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 47 | AS PER MR | 1 | nos | bprepbuyer3 | 150 | |
| 48 | Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 48 | AS PER MR | 1 | nos | bprepbuyer3 | 150 | |
| 49 | Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 49 | AS PER MR | 1 | nos | bprepbuyer3 | 150 | |
| 50 | Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 50 | AS PER MR | 1 | nos | bprepbuyer3 | 150 | |
| 51 | Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 51 | AS PER MR | 1 | nos | bprepbuyer3 | 150 | |
| 52 | Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 52 | AS PER MR | 1 | nos | bprepbuyer3 | 150 | |
| 53 | Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 53 | AS PER MR | 1 | nos | bprepbuyer3 | 150 | |
| 54 | Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 54 | AS PER MR | 1 | nos | bprepbuyer3 | 150 | |
| 55 | Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 55 | AS PER MR | 1 | nos | bprepbuyer3 | 150 | |
| 56 | Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 56 | AS PER MR | 1 | nos | bprepbuyer3 | 150 | |
| 57 | Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 57 | AS PER MR | 1 | nos | bprepbuyer3 | 150 | |
| 58 | Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 58 | AS PER MR | 1 | nos | bprepbuyer3 | 150 | |
| 59 | Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 59 | AS PER MR | 1 | nos | bprepbuyer3 | 150 | |
| 60 | Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 60 | AS PER MR | 1 | nos | bprepbuyer3 | 150 | |
| 61 | Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 61 | AS PER MR | 1 | nos | bprepbuyer3 | 150 | |
| 62 | Unit Supply Price on FOT site basis including P and F Freight and GST for MR S No 62 | AS PER MR | 1 | nos | bprepbuyer3 | 150 |
Discover companies most likely to bid on this tender
GST registration certificate
PAN card
Experience certificates for similar security equipment procurements
Financial statements / solvency certificate
EMD/Security deposit as per RFQ terms
Technical bid documents and compliance certificates
OEM authorizations (if applicable)
Key insights about MADHYA PRADESH tender market
Bidders should review the RFQ on GeM for BPCL SAGAR. Prepare GST, PAN, experience certificates, financials, and EMD per RFQ terms. Ensure you are the manufacturer to claim MSE preference and submit OEM authorizations if required. Follow inspection criteria in the RFQ documents.
Submit GST registration, PAN, experience certificates for similar security equipment, financial statements, EMD, technical bid documents, and OEM authorizations if applicable. Ensure all documents align with GeM RFQ terms and the BPCL inspection requirements.
The purchaser may increase or decrease the bid quantity by up to 25% at contract placement and during the currency. Delivery time adjusts using the formula: (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days.
Inspection will be conducted as per RFQ documents uploaded on GeM. Ensure compliance with listed inspection criteria, and be prepared to provide relevant quality assurances, certifications, and on-site verification as defined in the RFQ.
MSE preference applies to bidders who are manufacturers of the offered product; traders are excluded. If L1 is not an MSE and an MSE supplier quotes within L1+15%, they may get an opportunity to match L1 price for up to 25% of contract value.
The tender indicates 62 BOQ items with quantities not disclosed here. Refer to the GeM RFQ document for itemized list, specifications, and quantity ranges; ensure your bid aligns with the official BOQ in the RFQ.
Delivery period is linked to the original and extended delivery periods per the option clause. If extended due to quantity changes, the new period is calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days.
The tender data provided does not specify standards; bidders must consult the RFQ documents on GeM for any ISI, ISO, or other certifications required and include them in the technical bid and compliance certificates.