Bid Publish Date
23-Aug-2025, 12:55 pm
Bid End Date
09-Sep-2025, 1:00 pm
Location
Progress
Quantity
45
Category
Replacement of engine oil CK410W30
Bid Type
Two Packet Bid
Indian Air Force invites bids for Replacement of engine oil CK410W30, Replacement of gear box oil 80W90LL, Replacement of rear axle oil, Replacement of break oil tata genine brake fluid DOT4, Replacement of steering oil, Job in BANASKANTHA, GUJARAT. Quantity: 45. Submission Deadline: 09-09-2025 13: 00: 00. Submit your proposal before the deadline.
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Replacement of engine oil CK410W30 , Replacement of gear box oil 80W90LL , Replacement of rear axle oil , Replacement of break oil tata genine brake fluid DOT4 , Replacement of steering oil , Job
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Replacement of engine oil CK410W30
Replacement of engine oil CK410W30
Replacement of gear box oil 80W90LL
Replacement of gear box oil 80W90LL
Replacement of rear axle oil
Replacement of rear axle oil
Replacement of break oil tata genine brake fluid DOT4
Replacement of break oil tata genine brake fluid DOT4
Replacement of steering oil
Replacement of steering oil
Job
Repalcement of coolant water tata genuine coolant
Job
Replacement of fuel filter
Job
Replacement of oil filter
Job
Replacement of air filter element
Job
M&L for making grease into the bearing complete and checking
Job
Checking proper functioning of switches gauges warning lamps in instrument cluster all light the veh and replace the same of superior quality and testing complete
Job
M and L for check all drive belt and replace the power steering pump
Job
Wheels and tyres check tyre pressure whell mounting nuts and tighten rotate the tyres and wheel balancing of four numbers wheel with weight and through computer and testing complete
Job
Material for replacement of front brake pad set
Job
Material for replacement of rear brake disc
Job
Labour for checking for external clogging of intercooler and radiator clean with comressed air water
Job
Labour for check of air intake system lubrication windshield washing system by checking hose and pipe condition proper tightness of clamps
Job
M and L for replacement of damaged indicating light assembly rear side with light wiring work and bulb etc
Job
M and L for replacement of door mirror left side
Job
M and L for replacement of pinion inner bearing
Job
M and L for replacement of head light assembly left side
Job
M and L for replacement of back light tail light right side
Job
M and L for replacement of brake hoses and pipes
Job
Checking for free play movement of clutch pedal and overhaul clutch master and slave cylinder
Job
M and L for replace clutch fluid and carryout bleeding of clutch actuation system
Job
M and L for replace clutch disc assembly
Job
Labour for checking for ECU error with diagnostic system based on error indication in cluster
Job
M and L for replacement master cylinder front caliper wheel cylinder and the seal rubber parts
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Replacement of engine oil CK410W30 | Replacement of engine oil CK410W30 | 8 | litre | age@deesa | 15 | |
| 2 | Replacement of gear box oil 80W90LL | Replacement of gear box oil 80W90LL | 2 | litre | age@deesa | 15 | |
| 3 | Replacement of rear axle oil | Replacement of rear axle oil | 2 | litre | age@deesa | 15 | |
| 4 | Replacement of break oil tata genine brake fluid DOT4 | Replacement of break oil tata genine brake fluid DOT4 | 1 | litre | age@deesa | 15 | |
| 5 | Replacement of steering oil | Replacement of steering oil | 2 | litre | age@deesa | 15 | |
| 6 | Job | Repalcement of coolant water tata genuine coolant | 7 | litre | age@deesa | 15 | |
| 7 | Job | Replacement of fuel filter | 2 | each | age@deesa | 15 | |
| 8 | Job | Replacement of oil filter | 1 | each | age@deesa | 15 | |
| 9 | Job | Replacement of air filter element | 1 | each | age@deesa | 15 | |
| 10 | Job | M&L for making grease into the bearing complete and checking | 1 | kg | age@deesa | 15 | |
| 11 | Job | Checking proper functioning of switches gauges warning lamps in instrument cluster all light the veh and replace the same of superior quality and testing complete | 1 | job | age@deesa | 15 | |
| 12 | Job | M and L for check all drive belt and replace the power steering pump | 1 | each | age@deesa | 15 | |
| 13 | Job | Wheels and tyres check tyre pressure whell mounting nuts and tighten rotate the tyres and wheel balancing of four numbers wheel with weight and through computer and testing complete | 1 | job | age@deesa | 15 | |
| 14 | Job | Material for replacement of front brake pad set | 1 | set | age@deesa | 15 | |
| 15 | Job | Material for replacement of rear brake disc | 1 | nos | age@deesa | 15 | |
| 16 | Job | Labour for checking for external clogging of intercooler and radiator clean with comressed air water | 1 | job | age@deesa | 15 | |
| 17 | Job | Labour for check of air intake system lubrication windshield washing system by checking hose and pipe condition proper tightness of clamps | 1 | job | age@deesa | 15 | |
| 18 | Job | M and L for replacement of damaged indicating light assembly rear side with light wiring work and bulb etc | 1 | job | age@deesa | 15 | |
| 19 | Job | M and L for replacement of door mirror left side | 1 | nos | age@deesa | 15 | |
| 20 | Job | M and L for replacement of pinion inner bearing | 1 | nos | age@deesa | 15 | |
| 21 | Job | M and L for replacement of head light assembly left side | 1 | nos | age@deesa | 15 | |
| 22 | Job | M and L for replacement of back light tail light right side | 1 | nos | age@deesa | 15 | |
| 23 | Job | M and L for replacement of brake hoses and pipes | 1 | nos | age@deesa | 15 | |
| 24 | Job | Checking for free play movement of clutch pedal and overhaul clutch master and slave cylinder | 1 | job | age@deesa | 15 | |
| 25 | Job | M and L for replace clutch fluid and carryout bleeding of clutch actuation system | 1 | job | age@deesa | 15 | |
| 26 | Job | M and L for replace clutch disc assembly | 1 | job | age@deesa | 15 | |
| 27 | Job | Labour for checking for ECU error with diagnostic system based on error indication in cluster | 1 | job | age@deesa | 15 | |
| 28 | Job | M and L for replacement master cylinder front caliper wheel cylinder and the seal rubber parts | 1 | job | age@deesa | 15 |
Discover companies most likely to bid on this tender
Experience Criteria
Past Performance
Bidder Turnover *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Extended Deadline
09-Sep-2025, 1:00 pm
Opening Date
09-Sep-2025, 1:30 pm
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS