TRANSFORMER,RSDL VLTG,11KV 3,50VA,CL1 AND 3P,CAPACITOR UNIT,171.56KVAR,7.43KV,SHREEM,CAPACITOR UNIT
Hindustan Petroleum Corporation Ltd
VISAKHAPATNAM, ANDHRA PRADESH
Bid Publish Date
14-Feb-2026, 11:02 am
Bid End Date
07-Mar-2026, 9:00 am
Location
Progress
Quantity
28
Category
FIXED CONTACT BREAKER 400A
Bid Type
Two Packet Bid
Eastern Coalfields Limited has released a public tender for INSULATOR, BSHNG, 11KV, PRCLN, ISOLATOR ELECTRIC, 40A, CONTACTOR, AUX, 550V, 3P, 10A, PILOT RELAY, PLANETORY PINION 70 TEETH, CARRIER MOVING CONTACT WITH SUPPORT 200A, FIXED CONTACT BREAKER 400A in BARDHAMAN, WEST BENGAL. Quantity: 28. Submission Deadline: 07-03-2026 09: 00: 00. Download documents and apply online.
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Hindustan Petroleum Corporation Ltd
VISAKHAPATNAM, ANDHRA PRADESH
Eastern Coalfields Limited
BARDHAMAN, WEST BENGAL
Eastern Coalfields Limited
BARDHAMAN, WEST BENGAL
Eastern Coalfields Limited
BARDHAMAN, WEST BENGAL
Eastern Coalfields Limited
BARDHAMAN, WEST BENGAL
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | INSULATOR, BSHNG, 11KV, PRCLN | As Per Technical Specification Sheet | 4 | pieces | [email protected] | 15 |
| 2 | ISOLATOR ELECTRIC, 40A | As Per Technical Specification Sheet | 4 | pieces | [email protected] | 15 |
| 3 | CONTACTOR, AUX, 550V, 3P, 10A | As Per Technical Specification Sheet | 4 | pieces | [email protected] | 15 |
| 4 | PILOT RELAY | As Per Technical Specification Sheet | 4 | pieces | [email protected] | 15 |
| 5 | PLANETORY PINION 70 TEETH | As Per Technical Specification Sheet | 2 | pieces | [email protected] | 15 |
| 6 | CARRIER MOVING CONTACT WITH SUPPORT 200A | As Per Technical Specification Sheet | 4 | pieces | [email protected] | 15 |
| 7 | FIXED CONTACT BREAKER 400A | As Per Technical Specification Sheet | 6 | pieces | [email protected] | 15 |
Discover companies most likely to bid on this tender
Experience Criteria
Certificate (Requested in ATC)
OEM Authorization Certificate
Additional Doc 1 (Requested in ATC)
Additional Doc 2 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Sign up now to access all documents
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS