TenderDekho Logo
Closed GEM

Government Tender Published for COOKING EQUIPMENT,STORAGE AND UTENSILS,INFRASTRUCTURE,EARTH WORK,ROOF WORK,BRICK WORK,IRON WORK,PAI in LUCKNOW, UTTAR PRADESH

Bid Publish Date

27-Aug-2026, 2:14 pm

Bid End Date

07-Sep-2026, 3:00 pm

Progress

Issue27-Aug-2026, 2:14 pm
AwardPending

Indian Army invites bids for COOKING EQUIPMENT, STORAGE AND UTENSILS, INFRASTRUCTURE, EARTH WORK, ROOF WORK, BRICK WORK, IRON WORK, PAINTING WORK, ELECTRICAL WORK, CEMENT WORK, SAFETY AND HYGIENE EQUIPMENT in LUCKNOW, UTTAR PRADESH. Quantity: 2063. Submission Deadline: 07-09-2026 15: 00: 00. Submit your proposal before the deadline.

Authority & Contact

Organization

Indian Army

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Tender Data

Bid Details

Quantity

2063

Category

COOKING EQUIPMENT

Bid Type

Two Packet Bid

Bid Validity

65 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

H1-Highest Priced Bid Elimination

Tech Clarification Time

3 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Past Performance

80 %

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

COOKING EQUIPMENT , STORAGE AND UTENSILS , INFRASTRUCTURE , EARTH WORK , ROOF WORK , BRICK WORK , IRON WORK , PAINTING WORK , ELECTRICAL WORK , CEMENT WORK , SAFETY AND HYGIENE EQUIPMENT

Pre-Bid & Qualification

Pre-Bid Date

31-08-2026 11:00:00

Pre-Bid Venue

TA GROUP HQ CC 226008

Delivery Details

Max Delivery Days

25

Delivery Locations

1

Delivery Cities

Lucknow

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-LucknowLucknow--625-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9674931.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 11 Items Sign in for GEM prices

#1

COOKING EQUIPMENT

VEGETABLE CUTTING MACHINE HEAVY DUTY 2 HP LARGE CAPACITY VESSELS STEEL 30 KG

6 pieces Delivery: 25 days
#2

STORAGE AND UTENSILS

CHAIR EXHAUST FAN HEAVY DUTY

7 pieces Delivery: 25 days
#3

INFRASTRUCTURE

FLOOR TILLING GOOD QUALITY WITH INSTALLATION

408 sqft Delivery: 25 days
#4

EARTH WORK

EXCAVATION IN FOUNDATION IN ORDINARY SOIL 1.5 FEET DEEP

408 sqft Delivery: 25 days
#5

ROOF WORK

PROVIDING AND FIXING IN POSITION THE PLAIN GALVANIZED STEEL SHEET IN FRAME AND OTHER LOCATIONS FIXED WITH SELF TAPING SS SCREWSOR POLYMER COTED

1 job Delivery: 25 days
#6

BRICK WORK

THICK OF WALL 9 INCH HIGHT OF WALL 11 FRONT AND 15 FT BOTH SIDES

624 sqft Delivery: 25 days
#7

IRON WORK

02 X DOOR 3 5X7 FT 02 WINDOW 3X2 FT IRON RODS 450 KG IRON RING FOR ROOF STRUCTURE 65 KG 2X2 FRT 12 PCS

1 job Delivery: 25 days
#8

PAINTING WORK

APPLY TWO UNDERCOATED AND ONE FINISHING COAT OF GLOSS ON IRON AND STEEL SURFACES APPLY COAT OF PREMIER AND ALLOW TO DRY APPLY TWO UNDERCOATED AND ONE FINISHING COAT OF GLOSS PAINT TO GERNAL SURFACES

600 sqft Delivery: 25 days
#9

ELECTRICAL WORK

OPEN WIRING 04 TUBE LIGHTS 08 SWITCH 04 SOCKETS

1 job Delivery: 25 days
#10

CEMENT WORK

ALL WALL WILL BE BOTH SIDE PLASTER

1 job Delivery: 25 days
#11

SAFETY AND HYGIENE EQUIPMENT

4 KG ABC FIRE EXTINGUISHER SINK WITH ALL ACESSESORIES SINK WITH ALL ACESSESORIES

6 nos Delivery: 25 days

Categories 45

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Annual Turnover

6

Additional Doc 1 (Requested in ATC)

7

Additional Doc 2 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria

8

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer