Tyre with tube size six dot five into ten for three tonne ace fork lifter,Accelerator cable for vol
Indian Army
JABALPUR, MADHYA PRADESH
Bid Publish Date
04-Nov-2025, 9:15 am
Bid End Date
19-Nov-2025, 11:00 am
Location
Progress
RAQuantity
37
Category
Suction Vale Two Inch for Test Bed No Twenty
Bid Type
Two Packet Bid
Organization: Indian Army (Department Of Military Affairs). The tender covers multiple test-bed and maintenance components including Suction Valve Two Inch, Suction Valve Three Inch for Test Bed No Twenty, Spider L 225 for Test Bed No Twenty, Pressure Gauge 0-10 Kg/cm for Test Bed No Twenty, Backing Pad GEX 34-150 BOSCH for Sander Machine, and Engine Overhaul Packing Kit for WO 3235, plus various forklift fleet parts (Eight Ton Godrej). The procurement scope includes 13 BOQ items with undefined quantities, and no explicit estimated value or end-date published. The bid includes GST handling and supplier due diligence. A primary differentiator is the mix of mechanical, hydraulic, and OEM maintenance components intended for military test-bed operations. Unique aspects involve cross-category items from valves to engine kits and forklift bearings, indicating a consolidated maintenance procurement package.
Suction Valve 2" and 3" for Test Bed No Twenty
Pressure Gauge 0-10 Kg/cm for Test Bed No Twenty
Spider L 225 for Test Bed No Twenty
Backing Pad GEX 34-150 BOSCH for Sander Machine
Engine Overhaul Packing Kit for WO 3235
Six Forklift Truck Eight Ton Godrej components: crankshaft bearing, main bearings, oil filter, cylinder liner, timing cover seal, crank seal
Piston rings, crankcase seals, and related wear parts for Godrej forklift models
GST applicability to be self-verified by bidder with reimbursement terms
Upload all required certificates/documents per Bid Document, ATC and Corrigendum
Demonstrate non-liquidation status with a formal undertaking
GST treatment to be determined by bidder; reimbursement as per actuals or applicable rates, subject to quoted GST percentage
Delivery timelines not specified in data; verify in official tender documents and final contract
Not specified in data; confirm LD provisions in final terms and conditions
Not under liquidation or court receivership; provide undertaking
Submit GST, PAN, and experience certificates demonstrating relevant procurement capabilities
Demonstrate financial stability via audited statements and compliance with OEM requirements
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
JABALPUR, MADHYA PRADESH
Indian Army
MEERUT, UTTAR PRADESH
Indian Army
JABALPUR, MADHYA PRADESH
Indian Army
JABALPUR, MADHYA PRADESH
Indian Army
MEERUT, UTTAR PRADESH
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | Suction Vale Two Inch for Test Bed No Twenty | Suction Vale Two Inch for Test Bed No Twenty | 1 | nos | oicpmse | 25 |
| 2 | Suction Vale Three Inch for Test Bed No Twenty | Suction Vale Three Inch for Test Bed No Twenty | 1 | nos | oicpmse | 25 |
| 3 | Spider L Two Two Five for Test Bed No Twenty | Spider L Two Two Five for Test Bed No Twenty | 2 | nos | oicpmse | 25 |
| 4 | Pressure Gauge Zero to Ten Kg by cm for Test Bed No Twenty | Pressure Gauge Zero to Ten Kg by cm for Test Bed No Twenty | 2 | nos | oicpmse | 25 |
| 5 | Backing Pad GEX Three Four to One Five Zero BOSCH for Sander Machine One point Five | Backing Pad GEX Three Four to One Five Zero BOSCH for Sander Machine One point Five | 2 | nos | oicpmse | 25 |
| 6 | Engine Overhaul packing Kit for WO Three Two Three Five Six Forklift Truck Eight Ton Godrej Model No G Eight Zero Zero | Engine Overhaul packing Kit for WO Three Two Three Five Six Forklift Truck Eight Ton Godrej Model No G Eight Zero Zero | 1 | nos | oicpmse | 25 |
| 7 | Piston Ring for WO Three Two Three Five Six Forklift Truck Eight Ton Godrej Model No G Eight Zero Zero | Piston Ring for WO Three Two Three Five Six Forklift Truck Eight Ton Godrej Model No G Eight Zero Zero | 6 | nos | oicpmse | 25 |
| 8 | Crank Shaft main Bearing for WO Three Two Three Five Six Forklift Truck Eight Ton Godrej Model No G Eight Zero Zero | Crank Shaft main Bearing for WO Three Two Three Five Six Forklift Truck Eight Ton Godrej Model No G Eight Zero Zero | 7 | nos | oicpmse | 25 |
| 9 | Big End Bearing for WO Three Two Three Five Six Forklift Truck Eight Ton Godrej Model No G Eight Zero Zero | Big End Bearing for WO Three Two Three Five Six Forklift Truck Eight Ton Godrej Model No G Eight Zero Zero | 6 | nos | oicpmse | 25 |
| 10 | Oil Filter for WO Three Two Three Five Six Forklift Truck Eight Ton Godrej Model No G Eight Zero Zero | Oil Filter for WO Three Two Three Five Six Forklift Truck Eight Ton Godrej Model No G Eight Zero Zero | 1 | nos | oicpmse | 25 |
| 11 | Cylinder Liner for WO Three Two Three Five Six Forklift Truck Eight Ton Godrej Model No G Eight Zero Zero | Cylinder Liner for WO Three Two Three Five Six Forklift Truck Eight Ton Godrej Model No G Eight Zero Zero | 6 | nos | oicpmse | 25 |
| 12 | Timing cover seal Nine Zero to Six Five to One Five for WO Three Two Three Five Six Forklift Truck Eight Ton Godrej Model No G Eight Zero Zero | Timing cover seal Nine Zero to Six Five to One Five for WO Three Two Three Five Six Forklift Truck Eight Ton Godrej Model No G Eight Zero Zero | 1 | nos | oicpmse | 25 |
| 13 | Crank Seal for WO Three Two Three Five Six Forklift Truck Eight Ton Godrej Model No G Eight Zero Zero | Crank Seal for WO Three Two Three Five Six Forklift Truck Eight Ton Godrej Model No G Eight Zero Zero | 1 | nos | oicpmse | 25 |
GST registration certificate
PAN card
Experience certificates for similar maintenance/procurement
Financial statements demonstrating financial stability
EMD/Security deposit documentation (as required by official terms)
Technical bid documents demonstrating compliance with OEM and standards
OEM authorization letters (where applicable for Bosch, Godrej components)
Any other certificates requested in Bid Document, ATC and Corrigendum
Start
29-Nov-2025, 12:00 pm
End
01-Dec-2025, 12:00 pm
Duration: 48 hours
Reverse Auction Document
✅ RA concluded. Check financial results for final rankings.
These are the final prices after the reverse auction event. Prices may be lower than initial bids.
| Rank | Seller | Final Price | Item |
|---|---|---|---|
| L1 | TIME TRADERS(MSE) Under PMA Winner | ₹65,581 | Item Categories : Suction Vale Two Inch for Test Bed No Twenty,Suction Vale Three Inch for Test Bed No Twenty,Spider |
| L2 | M/S K B ENTERPRISES Under PMA | ₹66,610 | Item Categories : Suction Vale Two Inch for Test Bed No Twenty,Suction Vale Three Inch for Test Bed No Twenty,Spider |
| L3 | M/S BHARDWAJ ENTERPRISES (MSE) Under PMA | ₹71,736 | Item Categories : Suction Vale Two Inch for Test Bed No Twenty,Suction Vale Three Inch for Test Bed No Twenty,Spider |
🎉 L1 Winner
TIME TRADERS(MSE) Under PMA
Final Price: ₹65,581
Key insights about UTTAR PRADESH tender market
Bidders must submit GST registration, PAN, experience certificates, financial statements, EMD as required, and OEM authorizations. Ensure technical compliance and upload all documents per Bid Document and ATC. Verify GST calculations and confirm reimbursement terms. Delivery expectations are defined in final terms once issued.
Prepare GST certificate, PAN, 3+ years experience in similar maintenance projects, financial statements, and OEM authorizations for Godrej forklift components. Include technical bid documents and certificates confirming compliance with supplier standards. Ensure bidding company is not under liquidation and submits the undertaking.
Submit OEM authorization for Bosch components and any local quality certifications. While the tender data does not specify IS/ISO numbers, align with BOSCH product quality standards. Include product data sheets, warranty terms, and testing documentation if requested in the final bid package.
Exact delivery deadlines are not published in this data. Verify delivery schedule in the official tender documents and subsequent Addenda. Prepare logistics plans aligning with Army requirements and ensure lead times for valve assemblies and forklift parts are feasible within contract terms.
Bidders must determine applicable GST per their jurisdiction and bid GST accordingly. Army reimbursement is subject to actual rates or the bid GST rate, whichever is lower. Include GST details in the financial bid and provide supporting tax documentation during submission.
The data does not state a specific EMD amount. Confirm the EMD requirement in the Bid Document and ATC. Prepare to furnish the EMD via appropriate mode (DD/online) as per official terms, along with the bid submission.
The BOQ includes 13 items spanning suction valves, pressure gauge, spider fittings, Bosch backing pad, engine overhaul kit, and forklift wear parts. Quantities are not disclosed in the data; verify exact item-wise quantities and unit measurements in the BOQ in the official tender documents.
Obtain OEM authorization letters for each branded item (Bosch, Godrej components) and attach them to the technical bid. If an item lacks an OEM channel partner, provide alternative proof of authorized service or distributor status, along with product conformity data sheets.
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS