TenderDekho Logo
Active GEM

Indian Air Force UPS Repair & Overhaul Tender Nalya Abdasa - IS 550/UPS Maintenance 2026

Bid Publish Date

08-Oct-2026, 1:50 pm

Bid End Date

19-Oct-2026, 2:00 pm

Value

₹2,04,518

Progress

Issue08-Oct-2026, 1:50 pm
AwardPending

Key Highlights

  • • Exact project scope includes UPS repair/overhaul and securing bolts/helicon coil spring work for runway inset lights
  • • Delivery location explicitly defined: AIR FORCE STATION NALIYA, ABDASA, KACHCHH
  • • Bid value: estimated ₹204,518.00 with potential 50% variation under ATC
  • • ATC requires ink-signed terms and scope; SDAC/invoice past performance proof mandatory

Tender Overview

The Indian Air Force, Department Of Military Affairs, invites bids for a Repair and Overhauling Service focused on Uninterruptible Power Supply (UPS) systems and ancillary tasks including securing bolts and Helicon coil spring work on runway inset lights. The estimated value is ₹204,518.00 with potential scope adjustments up to 50% under the buyer’s quantity/duration variation clause. Delivery and installation are to occur at the AIR FORCE STATION NALIYA, ABDASA, KACHCHH, PIN-370655, aligning with the unit’s maintenance cycle and hospital/airfield infrastructure needs. The BOQ shows zero defined items, signaling a broad-scope service engagement rather than a line-item purchase, and the contract likely emphasizes performance and timely commissioning.

Technical Specifications & Requirements

  • Scope includes UPS repair/overhaul and associated runway inset light components (securing bolts, Helicon coil springs).
  • Location: AIR FORCE STATION NALIYA, ABDASA, KACHCHH; delivery/installation at the specified address.
  • Estimated contract value: ₹204,518.00; quantity flexibility up to 50% per ATC.
  • No explicit technical specs in the BOQ; bidders must rely on the stated scope of work and ATC directions, with emphasis on past performance.
  • Special ATC clauses mandate ink-signed bid terms, past performance proof via SDAC/invoice, and disqualification for non-submission.
  • Emphasizes compliance with bid terms and prior contracts of similar nature.

Terms, Conditions & Eligibility

  • 50% order variation permitted before contract issue and up to 50% after award.
  • Delivery/installation at the specified AIR FORCE STATION address; acceptance through SDAC and invoicing proof is mandatory.
  • Bidders must submit ink-signed terms, scope, and ATC; non-submission leads to disqualification.
  • Past performance is a key eligibility filter; poor performance on similar contracts may lead to rejection.
  • No BOQ items; emphasis on scope fulfillment, quality adherence, and timely delivery.

Key Specifications

    • Product/Service: Repair and Overhauling Service for UPS systems and runway inset light accessories
    • Location: AIR FORCE STATION NALIYA, ABDASA, KACHCHH
    • Estimated value: ₹204,518.00
    • Quantity flexibility: up to 50% variation
    • Documentation: SDAC + past performance proof required

Terms & Conditions

  • 50% contract quantity/duration variation allowed before and after award

  • Delivery and installation at the specified Air Force Station Nalya address

  • Mandatory submission of ink-signed bid terms and ATC documents

  • Past performance proof via SDAC and invoice required for technical evaluation

  • Contract copy uploaded by bidder deemed invalid

Important Clauses

Payment Terms

Not explicitly specified; evaluation hinges on SDAC and invoicing post-delivery

Delivery Schedule

Delivery to AIR FORCE STATION NALIYA, ABDASA within scope of work and after award per ATC

Penalties/Liquidated Damages

Not specified in data; potential LD considerations implied by performance-based acceptance

Bidder Eligibility

  • Demonstrated experience in UPS repair/overhaul and runway lighting components

  • Past performance evidence via SDAC and invoices for similar work

  • Compliance with ink-signed terms, ATC, and scope of work

Advertisement

Tender Data

Bid Details

Quantity

29

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

RA Qualification Rule

H1-Highest Priced Bid Elimination

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Compliance

Yes

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

Yes

Startup Exemption/Relaxation

Yes

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

1

Experience Required

2 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Service

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

Repair and Overhauling Service - Uninterruptible Power Supply (Ups) (DFM); REPAIR REMOVAL FITMENT OF SECURING BOLTS AND HELICON COIL SPRING OF RUNWAY INSET LIGHTS MAFI LIGHT; Yes; Buyer Premises

Delivery Details

Delivery Locations

1

Delivery Cities

Kachchh

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-KachchhKachchh--29--

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENTINDIAN AIR FORCE

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 7

GeM-Bidding-9974263.pdf

Main Document

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

Indian Air Force

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Categories 9

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Ink-signed bid terms and scope of work uploaded with ATC

2

Past performance proof: Service Delivery Acceptance Certificate (SDAC) and invoices

3

Evidence of past performance in similar UPS repair/overhaul or runway light components

4

Contract copy uploaded by bidder (not acceptable if missing)

5

Disqualification if poor performance on similar contracts is shown

6

Proof of address for delivery site (Air Force Station Nalya, Abdasa, Kachchh)

Frequently Asked Questions

Key insights about GUJARAT tender market

How to bid on the UPS repair tender in Nalya Abdasa 2026?

Bidders must submit ink-signed Terms and Conditions, Scope of Work, and ATC. Provide SDAC and past performance invoices as proof. Ensure past similar UPS repair experience and delivery readiness at AIR FORCE STATION NALIYA, ABDASA, KACHCHH. Include contract variation acceptance up to 50% if required.

What documents are required for Air Force UPS maintenance bid 2026?

Submit ink-signed bid terms, ATC, and Scope of Work; SDAC with past performance invoices; evidence of UPS repair experience; contract copy; proof of delivery address; and any OEM authorizations if applicable for runway light components.

What is the estimated contract value and variation allowed for this tender?

Estimated value is ₹204,518.00. Variation up to 50% of contract quantity or duration is permitted at bid issuance and post-award, subject to buyer consent and feasibility.

What are the delivery requirements for the Nalya Abdasa tender?

Delivery/installation must occur at AIR FORCE STATION NALIYA, ABDASA, KACHCHH as per scope. The acceptance will rely on SDAC and certified invoices; non-submission leads to technical disqualification.

What performance evidence must be provided for eligibility in this Air Force bid?

Provide SDAC and past invoices for similar UPS repair/overhaul or runway-light maintenance contracts. Poor past performance can lead to rejection; ensure documentation demonstrates successful completion.

Are there any mandatory prerequisites regarding scope of work submission?

Yes. Upload ink-signed Terms & Conditions and Scope of Work with ATC documents. Non-submission results in disqualification; ensure all pages are signed and stamped.

What is the acceptance criterion for this Air Force maintenance tender?

Acceptance relies on SDAC verification and invoice substantiation that the work has been completed per scope. The buyer may verify past performance before technical evaluation, affecting eligibility.

How does the 50% variation clause impact project planning for this tender?

Procurement planners should budget for possible scope changes up to 50% and prepare resources accordingly. Ensure supplier readiness for potential scope expansion before contract finalization.

Advertisement