TenderDekho Logo
Active GEM

Procurement Opportunity: 12W Modular Box,12W Plate,6W Modular Box,6W Plate,4W Modular Box,4W Plate,3W Modular Box,3W Plate,2 in WEST TRIPURA, TRIPURA

Bid Publish Date

13-Oct-2026, 12:36 pm

Bid End Date

27-Oct-2026, 1:00 pm

EMD

₹30,731

Value

₹15,36,551

Progress

Issue13-Oct-2026, 12:36 pm
AwardPending

North Eastern Electric Power Corporation Limited invites bids for 12W Modular Box, 12W Plate, 6W Modular Box, 6W Plate, 4W Modular Box, 4W Plate, 3W Modular Box, 3W Plate, 2W Modular Box, 2W Plate, Blanking Plate, 20A Switch, 10A Switch, 6A Switch, 20A Socket, 10A Socket, Fan Regulator, 40A 220V DP Isolator, 40A DP RCCB 100mA, 16A SP MCB 220V, 10A SP MCB 220V, 6A SP MCB 220V, 1200 mm Ceiling Fan 5 star, 900mm Exhaust Fan, Time Switch 24 hours format, 9W LED lamp, 20W LED Tube Light, MK1 230 Volt AC Starter, 24Watt Down Light, 15Watt Down Light, 1 sqmm Copper wire, 2W striker LED, 6W 12W Panel in WEST TRIPURA, TRIPURA. Quantity: 3095. Submission Deadline: 27-10-2026 13: 00: 00. Submit your proposal before the deadline.

Advertisement

Tender Data

Bid Details

Quantity

3095

Category

1200 mm Ceiling Fan 5 star

Bid Type

Two Packet Bid

Bid Validity

120 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

H1-Highest Priced Bid Elimination

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

Bid Splitting Applied

No

Requirements

OEM Avg. Turnover

30

Past Performance

80 %

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

12W Modular Box , 12W Plate , 6W Modular Box , 6W Plate , 4W Modular Box , 4W Plate , 3W Modular Box , 3W Plate , 2W Modular Box , 2W Plate , Blanking Plate , 20A Switch , 10A Switch , 6A Switch , 20A Socket , 10A Socket , Fan Regulator , 40A 220V DP Isolator , 40A DP RCCB 100mA , 16A SP MCB 220V , 10A SP MCB 220V , 6A SP MCB 220V , 1200 mm Ceiling Fan 5 star , 900mm Exhaust Fan , Time Switch 24 hours format , 9W LED lamp , 20W LED Tube Light , MK1 230 Volt AC Starter , 24Watt Down Light , 15Watt Down Light , 1 sqmm Copper wire , 2W striker LED , 6W 12W Panel

Advisory Bank

State Bank of India

ePBG Percentage

5%

ePBG Duration (Months)

12

Payment Timelines

Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

60

Delivery Locations

1

Delivery Cities

West Tripura

Delivery Pincodes

799008

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Sandipan Sarkar799008,AGTCCPP, NEEPCO Ltd., R C Nagar, Agartala, Tripura Opposite NIELIT Agartala, Near Bodhjung Nagar Police StationWest TripuraTripura7990085060-

Authority Records

MINISTRY OF POWER

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 6

GeM-Bidding-10026435.pdf

Main Document

Other Documents

OTHER

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Department

Hydro Power

Office Name

Agartala Tripura

Grievance Contact

[email protected]

Bill of Quantities (BOQ) 33 Items Sign in for GEM prices

#1

12W Modular Box

12W Modular Box

50 no Delivery: 60 days
#2

12W Plate

12W Plate

50 no Delivery: 60 days
#3

6W Modular Box

6W Modular Box

50 no Delivery: 60 days
#4

6W Plate

6W Plate

50 no Delivery: 60 days
#5

4W Modular Box

4W Modular Box

50 no Delivery: 60 days
#6

4W Plate

4W Plate

50 no Delivery: 60 days
#7

3W Modular Box

3W Modular Box

75 no Delivery: 60 days
#8

3W Plate

3W Plate

75 no Delivery: 60 days
#9

2W Modular Box

2W Modular Box

25 no Delivery: 60 days
#10

2W Plate

2W Plate

25 no Delivery: 60 days
#11

Blanking Plate

Blanking Plate

50 no Delivery: 60 days
#12

20A Switch

20A Switch

100 no Delivery: 60 days
#13

10A Switch

10A Switch

100 no Delivery: 60 days
#14

6A Switch

6A Switch

200 no Delivery: 60 days
#15

20A Socket

20A Socket

100 no Delivery: 60 days
#16

10A Socket

10A Socket

100 no Delivery: 60 days
#17

Fan Regulator

Fan Regulator

50 no Delivery: 60 days
#18

40A 220V DP Isolator

40A 220V DP Isolator

50 no Delivery: 60 days
#19

40A DP RCCB 100mA

40A DP RCCB 100mA

50 no Delivery: 60 days
#20

16A SP MCB 220V

16A SP MCB 220V

50 no Delivery: 60 days
#21

10A SP MCB 220V

10A SP MCB 220V

50 no Delivery: 60 days
#22

6A SP MCB 220V

6A SP MCB 220V

100 no Delivery: 60 days
#23

1200 mm Ceiling Fan 5 star

1200 mm Ceiling Fan 5 star

100 no Delivery: 60 days
#24

900mm Exhaust Fan

900mm Exhaust Fan

50 no Delivery: 60 days
#25

Time Switch 24 hours format

Time Switch 24 hours format

20 no Delivery: 60 days
#26

9W LED lamp

9W LED lamp

200 no Delivery: 60 days
#27

20W LED Tube Light

20W LED Tube Light

400 no Delivery: 60 days
#28

MK1 230 Volt AC Starter

MK1 230 Volt AC Starter

25 no Delivery: 60 days
#29

24Watt Down Light

24Watt Down Light

50 no Delivery: 60 days
#30

15Watt Down Light

15Watt Down Light

50 no Delivery: 60 days
#31

1 sqmm Copper wire

1 sqmm Copper wire

600 no Delivery: 60 days
#32

2W striker LED

2W striker LED

50 no Delivery: 60 days
#33

6W 12W Panel

6W 12W Panel

50 no Delivery: 60 days

Categories 33

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

OEM Annual Turnover *In case any bidder is seeking exemption from Experience / Turnover Criteria

7

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Advertisement