TenderDekho Logo
Active GEM

Contract Bidding Open For HDPE of 40 mm diameter,Optical Fiber Cable 12 Core,OFC Patch Cords as per specifications,Cat 6 Patc in AMRITSAR, PUNJAB

Bid Publish Date

07-Sep-2026, 3:55 pm

Bid End Date

22-Sep-2026, 10:00 am

EMD

₹2,35,046

Value

₹1,38,67,686

Location

AMRITSAR , PUNJAB

Progress

Issue07-Sep-2026, 3:55 pm
AwardPending

Public procurement opportunity for Airports Authority Of India HDPE of 40 mm diameter, Optical Fiber Cable 12 Core, OFC Patch Cords as per specifications, Cat 6 Patch Cords 1. 5 Mtr. , 24 Ports LIU fully loaded, 9 RU Wall Mountable Rack, 24 Port OFC Jointing Enclosures, SITC of Inspection chamber Manhole for Optical fiber. , Laying, Pulling of HDPE Pipe and backfilling, using HDD technology, Manually Laying, Pulling of HDPE Pipe and backfilling, Optical Fiber Cable Laying and Pulling, GI Pipe supply and installation. , Cable Route Markers, Surge protectors Devices for non PoE network as per specifications, Surge protectors Devices for PoE network as per specifications, Installation Testing and Commissioning in AMRITSAR, PUNJAB. Quantity: 47420 issued by. Submission Deadline: 22-09-2026 10: 00: 00. View full details and respond.

Tender Data

Bid Details

Quantity

47420

Category

Optical Fiber Cable 12 Core

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

Yes

Startup Exemption/Relaxation

Yes

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

46

OEM Avg. Turnover

552

Past Performance

50 %

Warranty Period

3 years

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

HDPE of 40 mm diameter , Optical Fiber Cable 12 Core , OFC Patch Cords as per specifications , Cat 6 Patch Cords 1.5 Mtr. , 24 Ports LIU fully loaded , 9 RU Wall Mountable Rack , 24 Port OFC Jointing Enclosures , SITC of Inspection chamber Manhole for Optical fiber. , Laying, Pulling of HDPE Pipe and backfilling, using HDD technology , Manually Laying, Pulling of HDPE Pipe and backfilling , Optical Fiber Cable Laying and Pulling , GI Pipe supply and installation. , Cable Route Markers , Surge protectors Devices for non PoE network as per specifications , Surge protectors Devices for PoE network as per specifications , Installation Testing and Commissioning

Advisory Bank

ICICI

ePBG Percentage

5%

ePBG Duration (Months)

39

Payment Timelines

Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

90

Delivery Locations

1

Delivery Cities

Amritsar

Delivery Pincodes

143101

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Ajay Kumar143101,AIRPORTS AUTHORITY OF INDIA, SGRDJ INTERNATIONAL AIRPORT, RAJASANSI, AMRITSAR (PUNJAB)AmritsarPunjab1431011100090-

Authority Records

MINISTRY OF CIVIL AVIATIONAIRPORTS AUTHORITY OF INDIA

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9853678.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Office Name

Apd Amritsar

Grievance Contact

[email protected]

Bill of Quantities (BOQ) 16 Items Sign in for GEM prices

#1

HDPE of 40 mm diameter

PLB HDPE of 40 mm diameter for underground Laying of OFC CableArmoured 12 Core Fiber Cable Single Mode

11,000 meters Delivery: 90 days
#2

Optical Fiber Cable 12 Core

Armored 12 Core Fiber Cable Single Mode

12,500 meters Delivery: 90 days
#3

OFC Patch Cords as per specifications

SC-SC Fiber Patch Cords Single Mode 10 Mtrs. as per Specification.

24 nos Delivery: 90 days
#4

Cat 6 Patch Cords 1.5 Mtr.

Cat 6 Patch Cords of 1.5 Mtrs. as per Specification.

120 nos Delivery: 90 days
#5

24 Ports LIU fully loaded

24 Port LIU Loaded Single Mode loaded with SC Coupler and pigtails.

5 nos Delivery: 90 days
#6

9 RU Wall Mountable Rack

9U Rack with all accessories

5 nos Delivery: 90 days
#7

24 Port OFC Jointing Enclosures

24 Port OFC Jointing Enclosure with all accessories

10 nos Delivery: 90 days
#8

SITC of Inspection chamber Manhole for Optical fiber.

SITC of Inspection chamber Manhole for Optical fiber.

30 nos Delivery: 90 days
#9

Laying, Pulling of HDPE Pipe and backfilling, using HDD technology

Laying, (using HDD technology) Pulling of HDPE Pipe and backfilling of pits.

10,500 meters Delivery: 90 days
#10

Manually Laying, Pulling of HDPE Pipe and backfilling

Manually Laying, Pulling of HDPE Pipe and backfilling of trenches and pits etc.

500 meters Delivery: 90 days
#11

Optical Fiber Cable Laying and Pulling

Laying, Pulling of OFC cable through HDPE duct, wall, raceway, ceiling, and through GI pipe etc.

12,500 meters Delivery: 90 days
#12

GI Pipe supply and installation.

GI Pipe (40 mm) with couplings as per specification

70 meters Delivery: 90 days
#13

Cable Route Markers

Cable Route Markers as per specifications

150 nos Delivery: 90 days
#14

Surge protectors Devices for non PoE network as per specifications

19 inches patch panel surge protector, 24 ports (non-PoE) as per specifications.

3 nos Delivery: 90 days
#15

Surge protectors Devices for PoE network as per specifications

19 inches patch panel surge protector, 24 ports (PoE) as per specifications.

2 nos Delivery: 90 days
#16

Installation Testing and Commissioning

Laying of cable, installation, testing and commissioning of the above supplied items, splicing, documentation and integration of complete OFC network with required accessories as per specifications

1 nos Delivery: 90 days

Categories 41

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

OEM Annual Turnover

7

Additional Doc 1 (Requested in ATC)

8

Additional Doc 2 (Requested in ATC)

9

Additional Doc 3 (Requested in ATC)

10

Additional Doc 4 (Requested in ATC)

11

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

12

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer