Bid Publish Date
13-Feb-2026, 3:24 pm
Bid End Date
23-Feb-2026, 4:00 pm
Location
Progress
District Administration Malappuram (Revenue Department Kerala) invites bids for an Online UPS (10 KVA) with battery conforming to IS 16242 (Part 1). Estimated value and EMD are not disclosed. The procurement focuses on a standalone UPS unit with specified performance and safety criteria, including inbuilt isolation transformer and battery type. The project scope centers on a power-backup solution for critical district operations, with emphasis on reliability and compliance to Indian standards. The absence of a BOQ suggests a single-item tender or a shortlisting stage, with optional quantity adjustments up to 25% under the purchaser’s right. The contract may include multiple extensions within the original delivery framework at contracted rates. This tender requires bidders to align with standard procurement terms and ensure timely delivery against extension provisions.
Product: Online UPS with Battery
Rating: 10 KVA
Standards: IS 16242 (Part 1)
Input/Output: AC 50 Hz
Isolation transformer: inbuilt option
Battery type: specify and verifiable
Backup time: defined by user requirements and bid data
Right to increase/decrease quantity by up to 25% during contract
Delivery period may adjust with option clause based on quantity change
Delivery time extension computed as (additional quantity/original quantity) × original delivery period, min 30 days
Payment terms to be defined in the purchase order; bidders should confirm advance/credit terms during bid submission
Delivery commence from last date of original delivery order; extended delivery time follows option clause calculations
Penalties may apply for non-compliance with delivery timelines; details to be clarified in the agreement
Experience in supplying or servicing UPS systems of at least 10 KVA
Demonstrated capability to meet IS 16242 (Part 1) standards
Valid GST registration and financial stability documentation
Quantity
7
Bid Type
Two Packet Bid
Bid Validity
60 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Online UPS (?10 KVA) With Battery Conforming To IS 16242 (Part 1) (Q2)
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
CATALOG Specification
GEM_GENERAL_TERMS_AND_CONDITIONS
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar UPS projects
Financial statements (recent, audited if possible)
EMD/Security deposit documentation
Technical bid documents and datasheets
OEM authorizations or manufacturer’s certification
| Category | Specification | Requirement |
|---|---|---|
| Performance Parameters | Rating (in KVA) | 2 |
| Performance Parameters | Input Voltage (AC, 50 Hz) | Single Phase, 160V - 260V |
| Performance Parameters | Output Voltage (AC, 50 Hz) | Single Phase, 230V±1%, |
| Construction | Availability of Inbuilt Isolation Transformer | Yes |
| Battery/Backup Bank | Type of Battery | SMF-VRLA (Sealed Maintenance Free-Valve Regulated Lead Acid) / Stationary Lead Acid Batteries |
| Battery/Backup Bank | Backup Time | 120.0 |
Key insights about KERALA tender market
Bidders should prepare GST certificate, PAN, experience certificates, financials, EMD submission, OEM authorizations, and technical datasheets. Ensure IS 16242 (Part 1) compliance, specify 10 KVA rating, and provide backup time and battery type details. Delivery terms require alignment with quantity variation up to 25%.
Required documents include GST certificate, PAN, recent financial statements, at least one or more UPS project experience certificates, EMD payment proof, technical compliance sheets, and OEM authorization letters. Submit datasheets proving IS 16242 (Part 1) compliance and battery specifications.
Specifications specify a 10 KVA Online UPS with an AC 50 Hz input/output, and an inbuilt isolation transformer option. The battery type and backup time must be detailed by bidders, along with IS 16242 (Part 1) conformity documentation.
Delivery period is linked to the original order; the option clause allows a quantity change up to 25% with proportional delivery time. If exercised, additional time = (additional quantity/original quantity) × original delivery period, with a minimum of 30 days.
EMD or security deposit details are not disclosed in the available data; bidders must verify the exact amount and method (DD/online) from the terms and submit with the bid alongside GST and PAN.
Bidders must ensure IS 16242 (Part 1) compliance for the UPS system and provide official certification or datasheets showing conformity. Battery specifications and safety certifications should also be included to demonstrate reliability and regulatory compliance.
Scope includes supply and delivery of Online UPS 10 KVA with battery and required accessories, with optional inbuilt isolation transformer. Installation support, commissioning, and post-installation service details to be clarified in the purchase order and warranty terms.
Bidders must specify a tested backup time under defined load for the 10 KVA UPS and provide a test report or datasheet reflecting expected runtime. Include battery type and brand, with warranty and service support details.