Boom Barrier
Indian Air Force
PUNE, MAHARASHTRA
Bid Publish Date
21-Oct-2025, 1:19 pm
Bid End Date
23-Dec-2025, 10:00 am
Location
Progress
RAQuantity
2
Bid Type
Two Packet Bid
Organization: Indian Army (Department Of Military Affairs). Procurement: Boom barrier equipment (security infrastructure). Location: India (generic). Estimated value: not disclosed; Quantity: not disclosed; Delivery terms: delivery period linked to last date of original delivery order with option to extend, minimum 30 days. Unique terms include volume expansion up to 25% of bid quantity and currency extension at contracted rates. A bidder must maintain continuous operating status and avoid liquidation or bankruptcy and ensure product life of at least 3 years beyond the contract. Emphasis on non-obsolete items with OEM support. Essential submission elements include PAN, GSTIN, cancelled cheque, and EFT mandate. Consortiums allowed with a single leader and equal liability for execution. End User Certificate may be provided in the buyer’s standard format. For hazardous materials, strict safety, transport, and labeling requirements apply. Key differentiator is the option-based delivery extension and lifecycle life requirements. Tender highlights focus on compliance, financial soundness, and non-obsolescence of supplied boom barrier systems.
Product/service: Boom barrier equipment for security access control
Experience: 3 years in supplying similar government-category products
Documentation: PAN Card, GSTIN, Cancelled Cheque, EFT Mandate
Consortium: Permitted with equal liability among members
End User Certificate: Buyers format where requested
Hazard handling: MSDS, labeling, batch/weight/shelf life on packing
Delivery: Option-based extension formula with minimum 30 days
Key Term 1: 25% quantity increase/decrease rights during and after contract
Key Term 2: Non-obsolescence requirement with 3 years residual market life
Key Term 3: Consortium allowed with leader designated and equal responsibility
Delivery orders and payment subject to standard government terms; EFT readiness advised; exact percentages not disclosed.
Delivery period starts from the last date of original delivery order; option to extend with calculated time based on added quantity; minimum 30 days.
Not specified in data; bidders should assume standard LDs for delayed supply per contract terms.
Not under liquidation or court receivership
Not bankrupt and maintains financial stability
Regularly supplied similar government-category products for at least 3 years
Main Document
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Air Force
PUNE, MAHARASHTRA
Indian Army
DIMAPUR, NAGALAND
Indian Army
JAIPUR, RAJASTHAN
Indian Air Force
BANGALORE, KARNATAKA
Indian Oil Corporation Limited
MATHURA, UTTAR PRADESH
Tender Results
Loading results...
Discover companies most likely to bid on this tender
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Extended Deadline
23-Dec-2025, 10:00 am
Opening Date
23-Dec-2025, 10:30 am
Extended Deadline
10-Dec-2025, 9:00 am
Opening Date
10-Dec-2025, 9:30 am
Extended Deadline
09-Dec-2025, 9:00 am
Opening Date
09-Dec-2025, 9:30 am
Extended Deadline
12-Nov-2025, 10:00 am
Opening Date
12-Nov-2025, 10:30 am
Extended Deadline
11-Nov-2025, 1:00 pm
Opening Date
11-Nov-2025, 1:30 pm
Start
03-Jan-2026, 12:00 pm
End
05-Jan-2026, 12:00 pm
Duration: 48 hours
Reverse Auction Document
✅ RA concluded. Check financial results for final rankings.
Key insights about WEST BENGAL tender market
Bidders should ensure they are not in liquidation and have maintained 3+ years of experience supplying similar equipment to government bodies. Prepare PAN, GSTIN, cancelled cheque, EFT mandate, and OEM authorizations. The consortium route is allowed with a single leader and joint liability.
Submit PAN Card, GSTIN, Cancelled Cheque, EFT Mandate certified by bank, OEM authorization if applicable, and an undertaking on financial standing. End User Certificate may be provided in the buyer’s format; ensure non-obsolescence and life of at least 3 years remaining.
Delivery can be extended under the option clause up to 25% additional quantity. Extended time is calculated as (additional quantity / original quantity) × original delivery period, with a minimum of 30 days; if original period is under 30 days, extension equals the original period.
Offered boom barrier products must have at least 3 years residual market life and must not be declared end-of-life by the OEM during this period.
Packing must display hazard symbols, MSDS, batch number, manufacturing date, gross/net weight, shelf life, and clear labeling during transport and storage as per regulatory requirements.
A consortium may participate with one leader; each member is equally responsible for execution. An undertaking to this effect must be uploaded with the bid, ensuring joint liability and seamless coordination.
While specific standards are not listed, suppliers should ensure OEM-backed quality, non-obsolescence, and compliance with typical security equipment norms; obtain OEM authorization where applicable and provide End User Certificate in buyer format if requested.
Delivery starts after the last date of the original delivery order. If the option clause is exercised, the extended time is proportionate to added quantity, with a minimum extension of 30 days.
Sign up now to access all documents
Main Document
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS