Bid Publish Date
13-Oct-2026, 6:59 pm
Bid End Date
23-Oct-2026, 7:00 pm
Location
Progress
The opportunity concerns the Hospitality And Protocol Department in Jammu and Kashmir, procuring curtains under the V2 (Q3) category. Although the organization name reads as N/a, the department title and location are explicit: JAMMU, JAMMU & KASHMIR 180001. The scope includes supply, installation, testing, commissioning, and operator training for curtains, with an emphasis on approved Detailed Design Drawings within 5 days of award. A 25% quantity variation clause may apply at contract placement and during the currency at contracted rates. The bidder must ensure compliance with drawings and delivery timelines, with a design approval cycle that can affect schedule. Unique aspects include design approvals before fabrication and a potential extension of delivery time tied to quantity adjustments.
Curtains for Hospitality and Protocol Department project in Jammu & Kashmir
No BOQ items provided; bespoke curtain solution may be required
Detailed Design Drawings to be approved prior to fabrication within 5 days
Delivery timeline contingent on drawing approval; extension rules apply
Bidder must ensure non-obsolescence and at least 2 years residual market life
GST to be calculated by bidder; GST reimbursement as per actuals or applicable rates
Scope includes supply, installation, testing, commissioning, and operator training
Delivery extension up to 25% quantity variation at contract rates
5-day window for design drawing approval and 5-day modification list
Applicant must demonstrate turnover and no insolvency status; GST handling
Curtains must be current in market with at least 2 years OEM life
Site-specific, not-BOQ-based procurement; installation and training included
GST handling as per actuals or applicable rate; quoted GST % applies; no vendor-specific advance mentioned
Delivery timing linked to 5-day design approval; delays in drawings push delivery dates without LD
Not explicitly stated; LD would apply per standard procurement terms if delays occur post-approval
Not under liquidation, court receivership, or similar proceedings
Not bankrupt; must provide undertaking
Minimum turnover over last 3 years as per bid document; documentary evidence required
Quantity
51
Bid Type
Two Packet Bid
Bid Validity
30 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
No
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Past Performance
30 %
Warranty Period
2 years
Experience Required
2 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Curtains (V2) (Q3)
Payment Timelines
Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
Jammu
Delivery Pincodes
180004
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Sanjay Kumar | 180004,4/5 C Govt. Quarter Gandhi Nagar Jammu | Jammu | Jammu And Kashmir | 180004 | 51 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
GST certificate
PAN card
Audited financial statements for last 3 years demonstrating turnover
Experience certificates showing similar curtain supply/installation projects
Technical bid documents and manufacturer OEM authorization/authorized distributor certificates
Undertaking that bidder is not under liquidation or bankruptcy
Detailed Design Drawings for approval within 5 days of award (as required)
Any statutory clearance certificates relevant to curtains installation (if applicable)
Key insights about JAMMU AND KASHMIR tender market
Bidders should prepare GST registration, PAN, three years of audited financials, and experience certificates for curtain supply/installation. Submit Technical bid with OEM authorizations, Undertaking of non-bankruptcy, and Detailed Design Drawings within 5 days of award. Ensure compliance with 25% quantity variation clause and design approval timelines.
Required documents include GST certificate, PAN, audited financial statements for three years, curtain installation experience certificates, OEM authorization, and an undated undertaking of financial stability. Additionally, provide Detailed Design Drawings within 5 days of award and any statutory clearance certificates if applicable.
Successful bidder must submit Detailed Design Drawings for approval within 5 days of contract award. Buyer will approve or provide a modification list within 5 days; delivery time may adjust if drawings are delayed. Designs must comply with non-obsolescence and OEM life requirements.
The purchaser may increase or decrease contract quantity up to 25% at contract placement and during currency at contracted rates. Additional time for delivery is computed as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days.
GST is to be assessed by the bidder; reimbursement will be as actuals or applicable rate, whichever is lower, up to the quoted GST percentage. Bidders must reflect GST in the bid and comply with local tax rules.
Provide proof of non-bankruptcy, three-year turnover evidence, curtain-related experience, and OEM authorizations. Ensure the bidder is not under liquidation or receivership and submit the required undertakings with the bid submission.
Delivery is tied to the approval of Detailed Design Drawings; if the buyer delays approval, the delivery period will be refixed without Liquidated Damages for the period of delay, ensuring fair scheduling after approval.
Scope includes supply, installation, testing, commissioning of curtains, plus operator training and any required statutory clearances. Ensure the bidder can complete all activities within the adjusted delivery timeline and provide post-installation support as required.