Tender Overview
The Indian Army, Department Of Military Affairs, invites bids for Waterproof Canvas Cloth 300 GSM. Estimated scope focuses on a single roll quantity of 400 meters with site stitching obligations. The tender contemplates a flexible quantity policy allowing up to 25% variation during contract execution. Pre-bid sample submission is required, and the cloth quality is to be verified against substandard claims. Location details are not specified in the notice, but the procurement targets standardized canvas cloth suitable for military use. The opportunity necessitates strict adherence to bid terms and timely delivery aligned to original delivery timelines, with potential extensions as stipulated in the option clause. This procurement emphasizes fabric durability, water resistance, and seam integrity for field conditions.
Technical Specifications & Requirements
- Product name: Waterproof Canvas Cloth
- Weight/Grade: 300 GSM canvas
- Roll quantity: 400 meters per sample/lot
- Site work: Stitching to be performed at the project site
- Quality note: Clause indicates potential rejection for substandard cloth
- Sample: Vendor must provide a sample before bid opening
- Delivery policy: Delivery period may be extended under option clause with calculation ((Increased quantity Γ· Original quantity) Γ Original delivery period), minimum 30 days
- Variations: Up to 25% quantity increase during contract execution
- Standards: Specific standard references are not provided in the data; bidders should align with military fabric requirements and any IS/ISO equivalents as per circulars
Terms, Conditions & Eligibility
- EMD/Financial: Not specified in the data; bidders should verify at bid stage
- Delivery timeline: Original delivery period followed by possible extensions under option clause
- Sample requirement: Submit sample before bid opening
- Quality control: Cloth quality evaluated against substandard criteria; site stitching is mandatory
- Modification: Purchaser reserves right to modify quantity by up to 25% during and after contract
- Documentation: Standard bid documents plus sample submission and any OEM authorizations as applicable
- Warranty/penalties: Not detailed; bidders should seek explicit terms during negotiation
