Bid Publish Date
07-Sep-2026, 12:03 pm
Bid End Date
18-Sep-2026, 11:00 am
Location
Progress
The Procuring Organization is the Nuclear Power Corporation Of India Limited under the Department Of Atomic Energy, procuring poly-pallets for bag storage godowns (V2) conforming to IS 13664 (Q3). Location: UTTARA KANNADA, KARNATAKA - 581121. Delivery terms reference unloading at the consignee location; no BOQ items listed. The scope indicates supply of goods only, with no estimated value disclosed. Unique aspects include an option clause allowing quantity adjustments up to 25% during and after contract award and a purchase preference framework for MSEs with potential price matching for 25% of total value if L1 is non-MSE. The bidder should anticipate Annexure-D delivery instructions per ATC and ensure compliance with all uploaded certificates.
Option to increase quantity up to 25% at contracted rates
Purchase preference for MSEs; manufacturer must be the product owner
Delivery instructions governed by Annexure-D in ATC
Unloading at consignee location included in scope
Mandatory certificates must be uploaded with bid
Payment terms not specified in data; refer to ATC for exact schedule.
Delivery period starts from last date of original delivery order; extended period follows the option clause with minimum 30 days.
Penalties not disclosed in available data; check bidder terms in ATC and contract.
Manufacturer status for MSE purchase preference
Compliance with IS 13664 (Q3) for poly-pallets
Submission of mandatory bid documents per ATC
Quantity
190
Bid Type
Single Packet Bid
Bid Validity
90 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
7 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
Yes
Bid Splitting Applied
No
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Poly-pallets for bag storage godowns (V2) Conforming to IS 13664 (Q3)
Payment Timelines
Payments shall be made to the Seller within 10 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
45
Delivery Locations
1
Delivery Cities
Uttara Kannada
Delivery Pincodes
581400
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Manoj Prasad P | 581400,Plant Site, Kaiga Generating Station, PO: Kaiga | Uttara Kannada | Karnataka | 581400 | 190 | 45 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
GST registration
PAN card
Experience certificates (similar supply)
Financial statements
EMD deposit proof (as applicable)
Technical bid documents
OEM authorizations (if applicable)
Certifications per ATC and Corrigendum
Key insights about KARNATAKA tender market
Bidders must submit GST, PAN, experience certificates, financial statements, and EMD proofs, along with technical bid documents and OEM authorizations. Ensure IS 13664 (Q3) conformity for poly-pallets and upload all ATC-compliant documents. Annexure-D delivery instructions govern the logistics and unloading at consignee location.
Required documents include GST certificate, PAN, experience certificates for similar supply, financial statements, EMD proof, technical bid, OEM authorization if applicable, and any quality certifications. All documents must be uploaded with the bid as per Buyer Added ATC.
Delivery terms specify unloading at the consignee location; original delivery period governs timing, with extensions allowed via the option clause. Additional time is calculated as (increased quantity ÷ original quantity) × original delivery period, minimum 30 days, potentially extending to the full original period.
MSE preference applies if the bidder is the manufacturer of the offered product; traders are excluded. If L-1 is not an MSE, an MSE seller with within L1 + 15% may match price for 25% of total value under the policy.
Pallets must conform to IS 13664 (Q3). This standard governs structural and material requirements for poly-pallets used in bag storage godowns, ensuring compatibility with bulk storage handling and safety.
Delivery starts from the last date of the original delivery order; any extension due to option clause follows the proportional calculation. If the original period is short, the extension mirrors the original duration with a minimum 30 days and may be extended to the full original period.