TenderDekho Logo
GEM

BHEL Vendor Code Creation & GST Compliance Tender Bharat Heavy Electricals Limited Department of Heavy Industry India 2025

Bid Publish Date

15-Nov-2025, 9:40 am

Bid End Date

28-Nov-2025, 1:00 pm

Generate Docs

Progress

RA
Issue15-Nov-2025, 9:40 am
Reverse AuctionCompleted
Award14-Jan-2026, 1:19 am
Explore all 4 tabs to view complete tender details

Quantity

886

Category

Oil filter as per sr no 1 of annexure-1

Bid Type

Two Packet Bid

Key Highlights

  • Vendor code creation and GST enrollment requirements for onboarding
  • Invoices must be issued in consignee name with corresponding GSTIN
  • MSE purchase preference eligibility criteria and documentation
  • PP-LC Make in India policy with 20% local content threshold
  • Local content certification options for foreign bidders via auditors
  • Bank-certified EFT mandate and cancellation cheque submission

Categories 119

AGITATORS BP INSTRUMENT SIMPLEX PUMPS CONTROLLER SWITCHES PLATFORM SCALE CRANKSHAFT ASSY SLUICE VALVE IMPELLERS ANIMAL WATERING MACHINES AHU HOT AIR BLOWERS AXLE ALTERNATOR MISCELLANEOUS VALVE ANGLE GLOBE VALVES RING HOIST COOLING FAN PRESSURE SWITCHES PERISTALTIC PUMPS ELECTROMECHANICAL MACHINERY NON RETURN VALVE DESERT COOLER SEALLESS PUMPS BEARINGS BLOOD PRESSURE MONITOR DOME KIT MATERIAL HANDLING MACHINERY DIRECT TRANSFORMER ARC VALVE LIFTING EQUIPMENT SENSOR SUPPLY RUBBER GASKET SEALS TELECOM EQUIPMENT PUMP SPARE PARTS EQUIPMENTS AND INSTRUMENT RADAR AND SONAR SYSTEMS AND COMPONENTS MAGNET VALVE FAN SPARE PARTS CENTRIFUGE BUCKETS WHEEL ASSEMBLY SYNCHRONOUS MOTORS AIR DUCT RUBBER AND ELASTOMERS WINDING MACHINE INDICATING AND RECORDING INSTRUMENTS PRESSURE SENSORS SLUDGE PUMPS BUS TERMINAL SEALING RING ALTERNATING PRESSURE SYSTEMS CENTRIFUGAL MACHINE DISTRIBUTION AND CONDITIONING WIRE ROPE PNEUMATIC POSITIONER ROOT BLOWER FLOW REGULATOR CRANES FLUID MECHANICS EQUIPMENT ALL TERRAIN CRANES GLUCOSE MONITORS AIR BLOWER ALTERNATING CURRENT MOTOR HVAC TRANSMITTER ELECTRONIC PRODUCTS AND APPLIANCES MECHANICAL INSTRUMENTS PNEUMATIC VALVES PNEUMATIC BLOWERS OR DRYERS ROTARY CAM PUMPS VALVES GASKETS AND SEALS WHEEL BEARING AC MOTORS GATE VALVES BRAKE ASSEMBLY TEMPERATURE INDICATOR VALVE FLOW SWITCHES WATER SUPPLY MATERIAL PRESSURE MEASURING AND CONTROL INSTRUMENTS WIRE CENTRIFUGAL COMPRESSORS FILTER RETAINERS AEROSOL CANS HAND CART AND TROLLEY TROLLEY SOLENOID VALVES WORM GEAR TURBINE PUMPS STEAM PUMPS AIRCRAFT HYDRAULIC SYSTEMS SLIDER VALVES BRAKE DREDGE PUMPS INDUCTION MOTORS RADIAL FIN FILTERS BOILER MOUNTING VALVE BRIDGE CRANES AXIAL SPLIT PUMPS LIMIT SWITCHES OVERHEAD STIRRERS FIRE SPRINKLER LABORATORY COOLING EQUIPMENT SANITARY PUMPS WATER TRANSMISSION MACHINE RUBBER PRODUCT BUTTERFLY LUG PATTERN VALVES MODBUS VALVE PARTS AND ACCESSORIES FLOAT VALVES GASKETS BOILER VALVE LIFTING MACHINE AIR SHOWER ELECTROMAGNET LIFTING CRANE SWITCH SUPPLY

Tender Overview

Bharat Heavy Electricals Limited (BHEL) under the Department of Heavy Industry invites bids for vendor code creation with mandatory GST compliance. The tender requires submission of PAN card, GSTIN, cancelled cheque, and EFT mandate for vendor onboarding. Invoicing must be raised in the consignee’s name with the consignee GSTIN. The procurement framework includes MSE purchase preference and Make in India local content rules, with explicit policy references for local content verification and eligibility. The scope emphasizes onboarding efficiency and GST alignment rather than a specific product lot, with a broad 200-item BOQ listed in the tender package. The emphasis on GST handling and vendor onboarding distinguishes this tender as a compliance and supplier registration exercise rather than a traditional goods/services contract.

Technical Specifications & Requirements

  • No product specifications are provided in the tender data.
  • Required documents for vendor code creation include PAN Card, GSTIN, Cancelled Cheque, and EFT Mandate certified by the bank.
  • Invoice must be issued in the consignee name with the consignee GSTIN.
  • Key policy references include MSE Purchase Preference (as per the 2012 policy and subsequent amendments) and PP-LC Policy (Make in India, 20% local content threshold).
  • BOQ lists 200 total items, with individual quantities not disclosed in the excerpt.
  • Supplier must be prepared to demonstrate eligibility under local content certification, including for foreign bidders via auditor/cost accountant documentation.

Terms, Conditions & Eligibility

  • GST implications explained: GST reimbursement as actuals or capped by quoted rate.
  • Submission must include PAN, GSTIN, Cancelled Cheque, and bank-certified EFT Mandate.
  • Invoicing must adhere to the consignee’s GSTIN; GST compliance is mandatory for payment processing.
  • MSE Purchase Preference criteria apply; makers must demonstrate manufacture capability for goods to avail benefit.
  • PP-LC Policy requires local content verification; foreign bidders may use auditor/cost accountant evidence.
  • No specific delivery timelines or payment terms are provided in the excerpt; bidders should prepare for standard government procedures and verification during bid evaluation.

Key Specifications

  • Vendor code creation and GST onboarding

  • Invoicing in consignee name with consignee GSTIN

  • MSE purchase preference eligibility documentation

  • PP-LC local content certification up to 20% threshold

  • Auditor/cost accountant certification for foreign bidders' local content

Terms & Conditions

  • GST reimbursement as actuals or capped by quoted GST rate

  • Vendor must submit PAN, GSTIN, cancelled cheque, EFT mandate

  • Invoicing must reflect consignee GSTIN

Important Clauses

Payment Terms

GST reimbursement as actuals or as per applicable rates, subject to quoted GST percentage.

Delivery Schedule

No explicit delivery timeline provided; bidders should plan per standard government onboarding timelines.

Penalties/Liquidated Damages

Not specified in excerpt; typical government procurements apply LDs as per policy during onboarding/contract.

Bidder Eligibility

  • Must be capable of vendor code creation and GST onboarding

  • Must provide PAN, GSTIN, and bank EFT mandate

  • MSE and Make in India local content criteria apply

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Authority Records

MINISTRY OF HEAVY INDUSTRIESHEAVY INDUSTRY DEPARTMENTBHARAT HEAVY ELECTRICALS LIMITED
Free Trial Available

Win more tenders with
real-time intelligence

Trusted by 5,000+ companies to find, track, and win government tenders.

Smart Alerts
Daily matched tenders to your inbox
Bid Results
See L1 winners & actual prices paid
Competitor Intel
Track rival companies & win patterns
Price Intelligence
BOQ rate trends to benchmark your bid
Book a Free Demo

See TenderDekho in action

Our team will walk you through the platform and help set up your profile — free, no commitment.

Callback within 24 hrs No credit card needed

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 9

GeM-Bidding-8584020.pdf

Main Document

Other Documents

OTHER

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

Other Documents

OTHER

Other Documents

OTHER

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

OIL FILTER

Indian Army

AGRA, UTTAR PRADESH

Posted: 27 June 2025
Closed: 18 July 2025
GEM

O RING KIT ( RETURN OIL FILTER)

Bharat Earth Movers Limited (beml)

Posted: 20 November 2024
Closed: 30 November 2024
GEM

AIR FILTER WITH REGULATOR,OIL REMOVAL FILTER

Hindustan Aeronautics Limited (hal)

BANGALORE, KARNATAKA

Posted: 9 January 2025
Closed: 30 January 2025
GEM

Open Tender for Air filter and Oil filter element in BEGUSARAI, BIHAR

N/A

BEGUSARAI, BIHAR

Posted: 2 July 2024
Closed: 16 July 2024
EPROCURE

Indian Army Oil Filter Procurement Imphal West Manipur 2025 - Unit Delivery & 1 Year Warranty Requirements

Indian Army

IMPHAL WEST, MANIPUR

Posted: 8 November 2025
Closed: 19 November 2025
GEM

Bill of Quantities (BOQ) 200 Items Sign in for GEM prices

#1

Oil filter as per sr no 1 of annexure-1

MAKE AND MODEL AS PER S. NO. 1 OF ANNEXURE 1 - LIST OF ITEMS

1 nos Delivery: 70 days
#2

Oil filter O ring as per sr no 2 of annexure-1

MAKE AND MODEL AS PER S. NO. 2 OF ANNEXURE 1 - LIST OF ITEMS

1 nos Delivery: 70 days
#3

Refrigerant filter as per sr no 3 of annexure-1

MAKE AND MODEL AS PER S. NO. 3 OF ANNEXURE 1 - LIST OF ITEMS

1 nos Delivery: 70 days
#4

Ref filter O ring as per sr no 4 of annexure-1

MAKE AND MODEL AS PER S. NO. 4 OF ANNEXURE 1 - LIST OF ITEMS

1 nos Delivery: 70 days
#5

EXV valve as per sr no 5 of annexure-1

MAKE AND MODEL AS PER S. NO. 5 OF ANNEXURE 1 - LIST OF ITEMS

1 nos Delivery: 70 days
#6

Solenoid valve 2 way as per sr no 6 of annexure-1

MAKE AND MODEL AS PER S. NO. 6 OF ANNEXURE 1 - LIST OF ITEMS

1 nos Delivery: 70 days
#7

Solenoid valve coil as per sr no 7 of annexure-1

MAKE AND MODEL AS PER S. NO. 7 OF ANNEXURE 1 - LIST OF ITEMS

1 nos Delivery: 70 days
#8

Solenoid valve O- ring as per sr no 8 of annexure-1

MAKE AND MODEL AS PER S. NO. 8 OF ANNEXURE 1 - LIST OF ITEMS

1 nos Delivery: 70 days
#9

Solenoid valve gasket as per sr no 9 of annexure-1

MAKE AND MODEL AS PER S. NO. 9 OF ANNEXURE 1 - LIST OF ITEMS

1 nos Delivery: 70 days
#10

Master solenoid valve as per sr no 10 of annexure-1

MAKE AND MODEL AS PER S. NO. 10 OF ANNEXURE 1 - LIST OF ITEMS

1 nos Delivery: 70 days
#11

Master solenoid valve coil as per sr no 11 of annexure-1

MAKE AND MODEL AS PER S. NO. 11 OF ANNEXURE 1 - LIST OF ITEMS

1 nos Delivery: 70 days
#12

Master solenoid gasket as per sr no 12 of annexure-1

MAKE AND MODEL AS PER S. NO. 12 OF ANNEXURE 1 - LIST OF ITEMS

1 nos Delivery: 70 days
#13

Oil filter as per sr no 13 of annexure-1

MAKE AND MODEL AS PER S. NO. 13 OF ANNEXURE 1 - LIST OF ITEMS

1 nos Delivery: 70 days
#14

Oil filter O ring as per sr no 14 of annexure-1

MAKE AND MODEL AS PER S. NO. 14 OF ANNEXURE 1 - LIST OF ITEMS

1 nos Delivery: 70 days
#15

Refrigerant filter as per sr no 15 of annexure-1

MAKE AND MODEL AS PER S. NO. 15 OF ANNEXURE 1 - LIST OF ITEMS

1 nos Delivery: 70 days
#16

Ref filter O ring as per sr no 16 of annexure-1

MAKE AND MODEL AS PER S. NO. 16 OF ANNEXURE 1 - LIST OF ITEMS

1 nos Delivery: 70 days
#17

EXV valve as per sr no 17 of annexure-1

MAKE AND MODEL AS PER S. NO. 17 OF ANNEXURE 1 - LIST OF ITEMS

1 nos Delivery: 70 days
#18

Solenoid valve 2 way as per sr no 18 of annexure-1

MAKE AND MODEL AS PER S. NO. 18 OF ANNEXURE 1 - LIST OF ITEMS

1 nos Delivery: 70 days
#19

Solenoid valve coil as per sr no 19 of annexure-1

MAKE AND MODEL AS PER S. NO. 19 OF ANNEXURE 1 - LIST OF ITEMS

1 nos Delivery: 70 days
#20

Solenoid valve O- ring as per sr no 20 of annexure-1

MAKE AND MODEL AS PER S. NO. 20 OF ANNEXURE 1 - LIST OF ITEMS

1 nos Delivery: 70 days
#21

Solenoid valve gasket as per sr no 21 of annexure-1

MAKE AND MODEL AS PER S. NO. 21 OF ANNEXURE 1 - LIST OF ITEMS

1 nos Delivery: 70 days
#22

Master solenoid valve as per sr no 22 of annexure-1

MAKE AND MODEL AS PER S. NO. 22 OF ANNEXURE 1 - LIST OF ITEMS

1 nos Delivery: 70 days
#23

Master solenoid valve coil as per sr no 23 of annexure-1

MAKE AND MODEL AS PER S. NO. 23 OF ANNEXURE 1 - LIST OF ITEMS

1 nos Delivery: 70 days
#24

Master solenoid gasket as per sr no 24 of annexure-1

MAKE AND MODEL AS PER S. NO. 24 OF ANNEXURE 1 - LIST OF ITEMS

1 nos Delivery: 70 days
#25

Impeller- Blower with Motor as per sr no 25 of annexure-1

MAKE AND MODEL AS PER S. NO. 25 OF ANNEXURE 1 - LIST OF ITEMS

1 nos Delivery: 70 days
#26

V-belts for AHU Blower as per sr no 26 of annexure-1

MAKE AND MODEL AS PER S. NO. 26 OF ANNEXURE 1 - LIST OF ITEMS

24 nos Delivery: 70 days
#27

AHU Blower bearing as per sr no 27 of annexure-1

MAKE AND MODEL AS PER S. NO. 27 OF ANNEXURE 1 - LIST OF ITEMS

8 nos Delivery: 70 days
#28

Blower motor bearing as per sr no 28 of annexure-1

MAKE AND MODEL AS PER S. NO. 28 OF ANNEXURE 1 - LIST OF ITEMS

8 nos Delivery: 70 days
#29

Impeller- Blower with Motor as per sr no 29 of annexure-1

MAKE AND MODEL AS PER S. NO. 29 OF ANNEXURE 1 - LIST OF ITEMS

1 nos Delivery: 70 days
#30

V-belts for AHU Blower as per sr no 30 of annexure-1

MAKE AND MODEL AS PER S. NO. 30 OF ANNEXURE 1 - LIST OF ITEMS

12 nos Delivery: 70 days
#31

AHU Blower bearing as per sr no 31 of annexure-1

MAKE AND MODEL AS PER S. NO. 31 OF ANNEXURE 1 - LIST OF ITEMS

4 nos Delivery: 70 days
#32

Blower motor bearing as per sr no 32 of annexure-1

MAKE AND MODEL AS PER S. NO. 32 OF ANNEXURE 1 - LIST OF ITEMS

4 nos Delivery: 70 days
#33

Impeller-Blower with Motor as per sr no 33 of annexure-1

MAKE AND MODEL AS PER S. NO. 33 OF ANNEXURE 1 - LIST OF ITEMS

1 nos Delivery: 70 days
#34

V-belts for AHU Blower as per sr no 34 of annexure-1

MAKE AND MODEL AS PER S. NO. 34 OF ANNEXURE 1 - LIST OF ITEMS

24 nos Delivery: 70 days
#35

AHU Blower bearing as per sr no 35 of annexure-1

MAKE AND MODEL AS PER S. NO. 35 OF ANNEXURE 1 - LIST OF ITEMS

8 nos Delivery: 70 days
#36

Blower motor bearing as per sr no 36 of annexure-1

MAKE AND MODEL AS PER S. NO. 36 OF ANNEXURE 1 - LIST OF ITEMS

8 nos Delivery: 70 days
#37

Impeller-Blower with Motor as per sr no 37 of annexure-1

MAKE AND MODEL AS PER S. NO. 37 OF ANNEXURE 1 - LIST OF ITEMS

1 nos Delivery: 70 days
#38

V-belts for AHU Blower as per sr no 38 of annexure-1

MAKE AND MODEL AS PER S. NO. 38 OF ANNEXURE 1 - LIST OF ITEMS

8 nos Delivery: 70 days
#39

AHU Blower bearing as per sr no 39 of annexure-1

MAKE AND MODEL AS PER S. NO. 39 OF ANNEXURE 1 - LIST OF ITEMS

4 nos Delivery: 70 days
#40

Blower motor bearing as per sr no 40 of annexure-1

MAKE AND MODEL AS PER S. NO. 40 OF ANNEXURE 1 - LIST OF ITEMS

4 nos Delivery: 70 days
#41

Impeller-Blower with Motor as per sr no 41 of annexure-1

MAKE AND MODEL AS PER S. NO. 41 OF ANNEXURE 1 - LIST OF ITEMS

1 nos Delivery: 70 days
#42

V-belts for AHU Blower as per sr no 42 of annexure-1

MAKE AND MODEL AS PER S. NO. 42 OF ANNEXURE 1 - LIST OF ITEMS

8 nos Delivery: 70 days
#43

AHU Blower bearing as per sr no 43 of annexure-1

MAKE AND MODEL AS PER S. NO. 43 OF ANNEXURE 1 - LIST OF ITEMS

4 nos Delivery: 70 days
#44

Blower motor bearing as per sr no 44 of annexure-1

MAKE AND MODEL AS PER S. NO. 44 OF ANNEXURE 1 - LIST OF ITEMS

4 nos Delivery: 70 days
#45

Impeller-Blower with Motor as per sr no 45 of annexure-1

MAKE AND MODEL AS PER S. NO. 45 OF ANNEXURE 1 - LIST OF ITEMS

1 nos Delivery: 70 days
#46

V-belts for AHU Blower as per sr no 46 of annexure-1

MAKE AND MODEL AS PER S. NO. 46 OF ANNEXURE 1 - LIST OF ITEMS

16 nos Delivery: 70 days
#47

AHU Blower bearing as per sr no 47 of annexure-1

MAKE AND MODEL AS PER S. NO. 47 OF ANNEXURE 1 - LIST OF ITEMS

8 nos Delivery: 70 days
#48

Blower motor bearing as per sr no 48 of annexure-1

MAKE AND MODEL AS PER S. NO. 48 OF ANNEXURE 1 - LIST OF ITEMS

8 nos Delivery: 70 days
#49

Impeller-Blower with Motor as per sr no 49 of annexure-1

MAKE AND MODEL AS PER S. NO. 49 OF ANNEXURE 1 - LIST OF ITEMS

1 nos Delivery: 70 days
#50

V-belts for AHU Blower as per sr no 50 of annexure-1

MAKE AND MODEL AS PER S. NO. 50 OF ANNEXURE 1 - LIST OF ITEMS

8 nos Delivery: 70 days
#51

AHU Blower bearing as per sr no 51 of annexure-1

MAKE AND MODEL AS PER S. NO. 51 OF ANNEXURE 1 - LIST OF ITEMS

4 nos Delivery: 70 days
#52

Blower motor bearing as per sr no 52 of annexure-1

MAKE AND MODEL AS PER S. NO. 52 OF ANNEXURE 1 - LIST OF ITEMS

4 nos Delivery: 70 days
#53

Impeller-Blower with Motor as per sr no 53 of annexure-1

MAKE AND MODEL AS PER S. NO. 53 OF ANNEXURE 1 - LIST OF ITEMS

1 nos Delivery: 70 days
#54

V-belts for AHU Blower as per sr no 54 of annexure-1

MAKE AND MODEL AS PER S. NO. 54 OF ANNEXURE 1 - LIST OF ITEMS

12 nos Delivery: 70 days
#55

AHU Blower bearing as per sr no 55 of annexure-1

MAKE AND MODEL AS PER S. NO. 55 OF ANNEXURE 1 - LIST OF ITEMS

4 nos Delivery: 70 days
#56

Blower motor bearing as per sr no 56 of annexure-1

MAKE AND MODEL AS PER S. NO. 56 OF ANNEXURE 1 - LIST OF ITEMS

4 nos Delivery: 70 days
#57

Impeller-Blower with Motor as per sr no 57 of annexure-1

MAKE AND MODEL AS PER S. NO. 57 OF ANNEXURE 1 - LIST OF ITEMS

1 nos Delivery: 70 days
#58

V-belts for AHU Blower as per sr no 58 of annexure-1

MAKE AND MODEL AS PER S. NO. 58 OF ANNEXURE 1 - LIST OF ITEMS

12 nos Delivery: 70 days
#59

AHU Blower bearing as per sr no 59 of annexure-1

MAKE AND MODEL AS PER S. NO. 59 OF ANNEXURE 1 - LIST OF ITEMS

4 nos Delivery: 70 days
#60

Blower motor bearing as per sr no 60 of annexure-1

MAKE AND MODEL AS PER S. NO. 60 OF ANNEXURE 1 - LIST OF ITEMS

4 nos Delivery: 70 days
#61

Impeller-Blower with Motor as per sr no 61 of annexure-1

MAKE AND MODEL AS PER S. NO. 61 OF ANNEXURE 1 - LIST OF ITEMS

1 nos Delivery: 70 days
#62

V-belts for AHU Blower as per sr no 62 of annexure-1

MAKE AND MODEL AS PER S. NO. 62 OF ANNEXURE 1 - LIST OF ITEMS

12 nos Delivery: 70 days
#63

AHU Blower bearing as per sr no 63 of annexure-1

MAKE AND MODEL AS PER S. NO. 63 OF ANNEXURE 1 - LIST OF ITEMS

4 nos Delivery: 70 days
#64

Blower motor bearing as per sr no 64 of annexure-1

MAKE AND MODEL AS PER S. NO. 64 OF ANNEXURE 1 - LIST OF ITEMS

4 nos Delivery: 70 days
#65

Impeller-Blower with Motor as per sr no 65 of annexure-1

MAKE AND MODEL AS PER S. NO. 65 OF ANNEXURE 1 - LIST OF ITEMS

1 nos Delivery: 70 days
#66

V-belts for AHU Blower as per sr no 66 of annexure-1

MAKE AND MODEL AS PER S. NO. 66 OF ANNEXURE 1 - LIST OF ITEMS

12 nos Delivery: 70 days
#67

AHU Blower bearing as per sr no 67 of annexure-1

MAKE AND MODEL AS PER S. NO. 67 OF ANNEXURE 1 - LIST OF ITEMS

4 nos Delivery: 70 days
#68

Blower motor bearing as per sr no 68 of annexure-1

MAKE AND MODEL AS PER S. NO. 68 OF ANNEXURE 1 - LIST OF ITEMS

4 nos Delivery: 70 days
#69

PRE FILTER 610X610X50 as per sr no 69 of annexure-1

MAKE AND MODEL AS PER S. NO. 69 OF ANNEXURE 1 - LIST OF ITEMS

41 nos Delivery: 70 days
#70

PRE FILTER 610X305X50 as per sr no 70 of annexure-1

MAKE AND MODEL AS PER S. NO. 70 OF ANNEXURE 1 - LIST OF ITEMS

14 nos Delivery: 70 days
#71

PRE FILTER 305X305X50 as per sr no 71 of annexure-1

MAKE AND MODEL AS PER S. NO. 71 OF ANNEXURE 1 - LIST OF ITEMS

1 nos Delivery: 70 days
#72

FINE FILTER 610X610X305 as per sr no 72 of annexure-1

MAKE AND MODEL AS PER S. NO. 72 OF ANNEXURE 1 - LIST OF ITEMS

41 nos Delivery: 70 days
#73

FINE FILTER 610X305X305 as per sr no 73 of annexure-1

MAKE AND MODEL AS PER S. NO. 73 OF ANNEXURE 1 - LIST OF ITEMS

14 nos Delivery: 70 days
#74

FINE FILTER 305X305X305 as per sr no 74 of annexure-1

MAKE AND MODEL AS PER S. NO. 74 OF ANNEXURE 1 - LIST OF ITEMS

1 nos Delivery: 70 days
#75

HP-LP cut out 75 TR as per sr no 75 of annexure-1

MAKE AND MODEL AS PER S. NO. 75 OF ANNEXURE 1 - LIST OF ITEMS

1 nos Delivery: 70 days
#76

HP-LP cut out 200 TR as per sr no 76 of annexure-1

MAKE AND MODEL AS PER S. NO. 76 OF ANNEXURE 1 - LIST OF ITEMS

1 nos Delivery: 70 days
#77

Nozzles for cooling towers as per sr no 77 of annexure-1

MAKE AND MODEL AS PER S. NO. 77 OF ANNEXURE 1 - LIST OF ITEMS

20 nos Delivery: 70 days
#78

Float valve assembly as per sr no 78 of annexure-1

MAKE AND MODEL AS PER S. NO. 78 OF ANNEXURE 1 - LIST OF ITEMS

1 nos Delivery: 70 days
#79

Nozzles for cooling towers as per sr no 79 of annexure-1

MAKE AND MODEL AS PER S. NO. 79 OF ANNEXURE 1 - LIST OF ITEMS

20 nos Delivery: 70 days
#80

Float valve assembly as per sr no 80 of annexure-1

MAKE AND MODEL AS PER S. NO. 80 OF ANNEXURE 1 - LIST OF ITEMS

1 set Delivery: 70 days
#81

Nozzles for cooling towers as per sr no 81 of annexure-1

MAKE AND MODEL AS PER S. NO. 81 OF ANNEXURE 1 - LIST OF ITEMS

20 nos Delivery: 70 days
#82

Float valve assembly as per sr no 82 of annexure-1

MAKE AND MODEL AS PER S. NO. 82 OF ANNEXURE 1 - LIST OF ITEMS

1 nos Delivery: 70 days
#83

Butterfly Valve - 200 mm dia as per sr no 83 of annexure-1

MAKE AND MODEL AS PER S. NO. 83 OF ANNEXURE 1 - LIST OF ITEMS

2 nos Delivery: 70 days
#84

Butterfly Valve - 150 mm dia as per sr no 84 of annexure-1

MAKE AND MODEL AS PER S. NO. 84 OF ANNEXURE 1 - LIST OF ITEMS

2 nos Delivery: 70 days
#85

Butterfly Valve - 125 mm dia as per sr no 85 of annexure-1

MAKE AND MODEL AS PER S. NO. 85 OF ANNEXURE 1 - LIST OF ITEMS

1 nos Delivery: 70 days
#86

Butterfly Valve - 100 mm dia as per sr no 86 of annexure-1

MAKE AND MODEL AS PER S. NO. 86 OF ANNEXURE 1 - LIST OF ITEMS

2 nos Delivery: 70 days
#87

Butterfly Valve - 80 mm dia as per sr no 87 of annexure-1

MAKE AND MODEL AS PER S. NO. 87 OF ANNEXURE 1 - LIST OF ITEMS

1 nos Delivery: 70 days
#88

Butterfly Valve - 65 mm dia as per sr no 88 of annexure-1

MAKE AND MODEL AS PER S. NO. 88 OF ANNEXURE 1 - LIST OF ITEMS

1 nos Delivery: 70 days
#89

Motorized Butterfly Valve - 200 mm dia as per sr no 89 of annexure-1

MAKE AND MODEL AS PER S. NO. 89 OF ANNEXURE 1 - LIST OF ITEMS

2 nos Delivery: 70 days
#90

Motorized Butterfly Valve - 150 mm dia as per sr no 90 of annexure-1

MAKE AND MODEL AS PER S. NO. 90 OF ANNEXURE 1 - LIST OF ITEMS

2 nos Delivery: 70 days
#91

Motorized Butterfly Valve - 125 mm dia as per sr no 91 of annexure-1

MAKE AND MODEL AS PER S. NO. 91 OF ANNEXURE 1 - LIST OF ITEMS

1 nos Delivery: 70 days
#92

Motorized Butterfly Valve - 100 mm dia as per sr no 92 of annexure-1

MAKE AND MODEL AS PER S. NO. 92 OF ANNEXURE 1 - LIST OF ITEMS

2 nos Delivery: 70 days
#93

Motorized Butterfly Valve - 80 mm dia as per sr no 93 of annexure-1

MAKE AND MODEL AS PER S. NO. 93 OF ANNEXURE 1 - LIST OF ITEMS

1 nos Delivery: 70 days
#94

Motorized Butterfly Valve - 65 mm dia as per sr no 94 of annexure-1

MAKE AND MODEL AS PER S. NO. 94 OF ANNEXURE 1 - LIST OF ITEMS

1 nos Delivery: 70 days
#95

Motorized Butterfly Valve - 50 mm dia as per sr no 95 of annexure-1

MAKE AND MODEL AS PER S. NO. 95 OF ANNEXURE 1 - LIST OF ITEMS

1 nos Delivery: 70 days
#96

Motorized Butterfly Valve - 40 mm dia as per sr no 96 of annexure-1

MAKE AND MODEL AS PER S. NO. 96 OF ANNEXURE 1 - LIST OF ITEMS

1 nos Delivery: 70 days
#97

Motorized Butterfly Valve - 25 mm dia as per sr no 97 of annexure-1

MAKE AND MODEL AS PER S. NO. 97 OF ANNEXURE 1 - LIST OF ITEMS

1 nos Delivery: 70 days
#98

Gate Valve - 25 mm as per sr no 98 of annexure-1

MAKE AND MODEL AS PER S. NO. 98 OF ANNEXURE 1 - LIST OF ITEMS

5 nos Delivery: 70 days
#99

Gate Valve - 40 mm as per sr no 99 of annexure-1

MAKE AND MODEL AS PER S. NO. 99 OF ANNEXURE 1 - LIST OF ITEMS

9 nos Delivery: 70 days
#100

Gate Valve - 50 mm as per sr no 100 of annexure-1

MAKE AND MODEL AS PER S. NO. 100 OF ANNEXURE 1 - LIST OF ITEMS

1 nos Delivery: 70 days
#101

Gate Valve - 32 mm as per sr no 101 of annexure-1

MAKE AND MODEL AS PER S. NO. 101 OF ANNEXURE 1 - LIST OF ITEMS

2 nos Delivery: 70 days
#102

Balancing Valve - 200 mm dia as per sr no 102 of annexure-1

MAKE AND MODEL AS PER S. NO. 102 OF ANNEXURE 1 - LIST OF ITEMS

1 nos Delivery: 70 days
#103

Balancing Valve - 125 mm dia as per sr no 103 of annexure-1

MAKE AND MODEL AS PER S. NO. 103 OF ANNEXURE 1 - LIST OF ITEMS

1 nos Delivery: 70 days
#104

Balancing Valve - 150 mm dia as per sr no 104 of annexure-1

MAKE AND MODEL AS PER S. NO. 104 OF ANNEXURE 1 - LIST OF ITEMS

1 nos Delivery: 70 days
#105

Balancing Valve - 100 mm dia as per sr no 105 of annexure-1

MAKE AND MODEL AS PER S. NO. 105 OF ANNEXURE 1 - LIST OF ITEMS

1 nos Delivery: 70 days
#106

Balancing Valve - 80 mm dia as per sr no 106 of annexure-1

MAKE AND MODEL AS PER S. NO. 106 OF ANNEXURE 1 - LIST OF ITEMS

1 nos Delivery: 70 days
#107

Balancing Valve - 25 mm dia as per sr no 107 of annexure-1

MAKE AND MODEL AS PER S. NO. 107 OF ANNEXURE 1 - LIST OF ITEMS

1 nos Delivery: 70 days
#108

Balancing Valve - 65 mm dia as per sr no 108 of annexure-1

MAKE AND MODEL AS PER S. NO. 108 OF ANNEXURE 1 - LIST OF ITEMS

1 nos Delivery: 70 days
#109

Non Return Valve - 100 mm dia as per sr no 109 of annexure-1

MAKE AND MODEL AS PER S. NO. 109 OF ANNEXURE 1 - LIST OF ITEMS

1 nos Delivery: 70 days
#110

Non return Valve - 200 mm dia as per sr no 110 of annexure-1

MAKE AND MODEL AS PER S. NO. 110 OF ANNEXURE 1 - LIST OF ITEMS

1 nos Delivery: 70 days
#111

Non Return Valve - 150 mm dia as per sr no 111 of annexure-1

MAKE AND MODEL AS PER S. NO. 111 OF ANNEXURE 1 - LIST OF ITEMS

1 nos Delivery: 70 days
#112

Non Return Valve - 125 mm dia as per sr no 112 of annexure-1

MAKE AND MODEL AS PER S. NO. 112 OF ANNEXURE 1 - LIST OF ITEMS

1 nos Delivery: 70 days
#113

Non Return Valve - 40 mm dia as per sr no 113 of annexure-1

MAKE AND MODEL AS PER S. NO. 113 OF ANNEXURE 1 - LIST OF ITEMS

2 nos Delivery: 70 days
#114

Non Return Valve - 25 mm dia as per sr no 114 of annexure-1

MAKE AND MODEL AS PER S. NO. 114 OF ANNEXURE 1 - LIST OF ITEMS

1 nos Delivery: 70 days
#115

Control Valve 2 Way as per sr no 115 of annexure-1

MAKE AND MODEL AS PER S. NO. 115 OF ANNEXURE 1 - LIST OF ITEMS

1 nos Delivery: 70 days
#116

Control Valve 2 Way as per sr no 116 of annexure-1

MAKE AND MODEL AS PER S. NO. 116 OF ANNEXURE 1 - LIST OF ITEMS

1 nos Delivery: 70 days
#117

Control Valve 2 Way as per sr no 117 of annexure-1

MAKE AND MODEL AS PER S. NO. 117 OF ANNEXURE 1 - LIST OF ITEMS

1 nos Delivery: 70 days
#118

Control Valve 3 Way as per sr no 118 of annexure-1

MAKE AND MODEL AS PER S. NO. 118 OF ANNEXURE 1 - LIST OF ITEMS

1 nos Delivery: 70 days
#119

Control Valve 3 Way as per sr no 119 of annexure-1

MAKE AND MODEL AS PER S. NO. 119 OF ANNEXURE 1 - LIST OF ITEMS

1 nos Delivery: 70 days
#120

Control Valve 3 Way as per sr no 120 of annexure-1

MAKE AND MODEL AS PER S. NO. 120 OF ANNEXURE 1 - LIST OF ITEMS

1 nos Delivery: 70 days
#121

Humidity sensors as per sr no 121 of annexure-1

MAKE AND MODEL AS PER S. NO. 121 OF ANNEXURE 1 - LIST OF ITEMS

1 nos Delivery: 70 days
#122

Geyserstat as per sr no 122 of annexure-1

MAKE AND MODEL AS PER S. NO. 122 OF ANNEXURE 1 - LIST OF ITEMS

2 nos Delivery: 70 days
#123

Local Humidity Indicator as per sr no 123 of annexure-1

MAKE AND MODEL AS PER S. NO. 123 OF ANNEXURE 1 - LIST OF ITEMS

1 nos Delivery: 70 days
#124

All Bearings as per sr no 124 of annexure-1

MAKE AND MODEL AS PER S. NO. 124 OF ANNEXURE 1 - LIST OF ITEMS

15 nos Delivery: 70 days
#125

Brake assembly and its liners as per sr no 125 of annexure-1

MAKE AND MODEL AS PER S. NO. 125 OF ANNEXURE 1 - LIST OF ITEMS

1 set Delivery: 70 days
#126

Wire rope as per sr no 126 of annexure-1

MAKE AND MODEL AS PER S. NO. 126 OF ANNEXURE 1 - LIST OF ITEMS

20 mtr Delivery: 70 days
#127

Limit switch as per sr no 127 of annexure-1

MAKE AND MODEL AS PER S. NO. 127 OF ANNEXURE 1 - LIST OF ITEMS

2 nos Delivery: 70 days
#128

All Bearings as per sr no 128 of annexure-1

MAKE AND MODEL AS PER S. NO. 128 OF ANNEXURE 1 - LIST OF ITEMS

4 nos Delivery: 70 days
#129

Brake assembly and its liners as per sr no 129 of annexure-1

MAKE AND MODEL AS PER S. NO. 129 OF ANNEXURE 1 - LIST OF ITEMS

1 set Delivery: 70 days
#130

Terminal plates as per sr no 130 of annexure-1

MAKE AND MODEL AS PER S. NO. 130 OF ANNEXURE 1 - LIST OF ITEMS

10 nos Delivery: 70 days
#131

Greasing arrangements as per sr no 131 of annexure-1

MAKE AND MODEL AS PER S. NO. 131 OF ANNEXURE 1 - LIST OF ITEMS

4 nos Delivery: 70 days
#132

Motor of each type and rating as per sr no 132 of annexure-1

MAKE AND MODEL AS PER S. NO. 132 OF ANNEXURE 1 - LIST OF ITEMS

1 nos Delivery: 70 days
#133

Bearings DE drive end and NDE non drive end for each type and rating of motors as per sr no 133 of annexure-1

MAKE AND MODEL AS PER S. NO. 133 OF ANNEXURE 1 - LIST OF ITEMS

8 nos Delivery: 70 days
#134

Stator winding coils for all type of LT motors as per sr no 134 of annexure-1

MAKE AND MODEL AS PER S. NO. 134 OF ANNEXURE 1 - LIST OF ITEMS

1 nos Delivery: 70 days
#135

Dust seals and gaskets for each type of motors as per sr no 135 of annexure-1

MAKE AND MODEL AS PER S. NO. 135 OF ANNEXURE 1 - LIST OF ITEMS

3 nos Delivery: 70 days
#136

Terminal plates as per sr no 136 of annexure-1

MAKE AND MODEL AS PER S. NO. 136 OF ANNEXURE 1 - LIST OF ITEMS

10 nos Delivery: 70 days
#137

Greasing arrangements as per sr no 137 of annexure-1

MAKE AND MODEL AS PER S. NO. 137 OF ANNEXURE 1 - LIST OF ITEMS

4 nos Delivery: 70 days
#138

Motor of each type and rating as per sr no 138 of annexure-1

MAKE AND MODEL AS PER S. NO. 138 OF ANNEXURE 1 - LIST OF ITEMS

1 nos Delivery: 70 days
#139

Bearings DE and NDE for each type and rating of motors as per sr no 139 of annexure-1

MAKE AND MODEL AS PER S. NO. 139 OF ANNEXURE 1 - LIST OF ITEMS

8 nos Delivery: 70 days
#140

Stator winding coils for all type of LT motors as per sr no 140 of annexure-1

MAKE AND MODEL AS PER S. NO. 140 OF ANNEXURE 1 - LIST OF ITEMS

1 nos Delivery: 70 days
#141

Dust seals and gaskets for each type of motors as per sr no 141 of annexure-1

MAKE AND MODEL AS PER S. NO. 141 OF ANNEXURE 1 - LIST OF ITEMS

3 nos Delivery: 70 days
#142

Terminal plates as per sr no 142 of annexure-1

MAKE AND MODEL AS PER S. NO. 142 OF ANNEXURE 1 - LIST OF ITEMS

10 nos Delivery: 70 days
#143

Greasing arrangements as per sr no 143 of annexure-1

MAKE AND MODEL AS PER S. NO. 143 OF ANNEXURE 1 - LIST OF ITEMS

4 nos Delivery: 70 days
#144

Motor of each type and rating as per sr no 144 of annexure-1

MAKE AND MODEL AS PER S. NO. 144 OF ANNEXURE 1 - LIST OF ITEMS

1 nos Delivery: 70 days
#145

Bearings DE and NDE for each type and rating of motors as per sr no 145 of annexure-1

MAKE AND MODEL AS PER S. NO. 145 OF ANNEXURE 1 - LIST OF ITEMS

8 nos Delivery: 70 days
#146

Stator winding coils for all type of LT motors as per sr no 146 of annexure-1

MAKE AND MODEL AS PER S. NO. 146 OF ANNEXURE 1 - LIST OF ITEMS

1 nos Delivery: 70 days
#147

Dust seals and gaskets for each type of motors as per sr no 147 of annexure-1

MAKE AND MODEL AS PER S. NO. 147 OF ANNEXURE 1 - LIST OF ITEMS

3 nos Delivery: 70 days
#148

Terminal plates as per sr no 148 of annexure-1

MAKE AND MODEL AS PER S. NO. 148 OF ANNEXURE 1 - LIST OF ITEMS

10 nos Delivery: 70 days
#149

Greasing arrangements as per sr no 149 of annexure-1

MAKE AND MODEL AS PER S. NO. 149 OF ANNEXURE 1 - LIST OF ITEMS

4 nos Delivery: 70 days
#150

Motor of each type and rating as per sr no 150 of annexure-1

MAKE AND MODEL AS PER S. NO. 150 OF ANNEXURE 1 - LIST OF ITEMS

1 nos Delivery: 70 days
#151

Bearings DE and NDE for each type and rating of motors as per sr no 151 of annexure-1

MAKE AND MODEL AS PER S. NO. 151 OF ANNEXURE 1 - LIST OF ITEMS

8 nos Delivery: 70 days
#152

Stator winding coils for all type of LT motors as per sr no 152 of annexure-1

MAKE AND MODEL AS PER S. NO. 152 OF ANNEXURE 1 - LIST OF ITEMS

1 nos Delivery: 70 days
#153

Dust seals and gaskets for each type of motors as per sr no 153 of annexure-1

MAKE AND MODEL AS PER S. NO. 153 OF ANNEXURE 1 - LIST OF ITEMS

3 nos Delivery: 70 days
#154

Terminal plates as per sr no 154 of annexure-1

MAKE AND MODEL AS PER S. NO. 154 OF ANNEXURE 1 - LIST OF ITEMS

10 nos Delivery: 70 days
#155

Greasing arrangements as per sr no 155 of annexure-1

MAKE AND MODEL AS PER S. NO. 155 OF ANNEXURE 1 - LIST OF ITEMS

4 nos Delivery: 70 days
#156

Motor of each type and rating as per sr no 156 of annexure-1

MAKE AND MODEL AS PER S. NO. 156 OF ANNEXURE 1 - LIST OF ITEMS

1 nos Delivery: 70 days
#157

Bearings DE and NDE for each type and rating of motors as per sr no 157 of annexure-1

MAKE AND MODEL AS PER S. NO. 157 OF ANNEXURE 1 - LIST OF ITEMS

8 nos Delivery: 70 days
#158

Stator winding coils for all type of LT motors as per sr no 158 of annexure-1

MAKE AND MODEL AS PER S. NO. 158 OF ANNEXURE 1 - LIST OF ITEMS

1 nos Delivery: 70 days
#159

Dust seals and gaskets for each type of motors as per sr no 159 of annexure-1

MAKE AND MODEL AS PER S. NO. 159 OF ANNEXURE 1 - LIST OF ITEMS

3 nos Delivery: 70 days
#160

Terminal plates as per sr no 160 of annexure-1

MAKE AND MODEL AS PER S. NO. 160 OF ANNEXURE 1 - LIST OF ITEMS

10 nos Delivery: 70 days
#161

Greasing arrangements as per sr no 161 of annexure-1

MAKE AND MODEL AS PER S. NO. 161 OF ANNEXURE 1 - LIST OF ITEMS

4 nos Delivery: 70 days
#162

Motor of each type and rating as per sr no 162 of annexure-1

MAKE AND MODEL AS PER S. NO. 162 OF ANNEXURE 1 - LIST OF ITEMS

1 nos Delivery: 70 days
#163

Bearings DE and NDE for each type and rating of motors as per sr no 163 of annexure-1

MAKE AND MODEL AS PER S. NO. 163 OF ANNEXURE 1 - LIST OF ITEMS

8 nos Delivery: 70 days
#164

Stator winding coils for all type of LT motors as per sr no 164 of annexure-1

MAKE AND MODEL AS PER S. NO. 164 OF ANNEXURE 1 - LIST OF ITEMS

1 nos Delivery: 70 days
#165

Dust seals and gaskets for each type of motors as per sr no 165 of annexure-1

MAKE AND MODEL AS PER S. NO. 165 OF ANNEXURE 1 - LIST OF ITEMS

3 nos Delivery: 70 days
#166

Terminal plates as per sr no 166 of annexure-1

MAKE AND MODEL AS PER S. NO. 166 OF ANNEXURE 1 - LIST OF ITEMS

10 nos Delivery: 70 days
#167

Greasing arrangements as per sr no 167 of annexure-1

MAKE AND MODEL AS PER S. NO. 167 OF ANNEXURE 1 - LIST OF ITEMS

4 nos Delivery: 70 days
#168

Motor of each type and rating as per sr no 168 of annexure-1

MAKE AND MODEL AS PER S. NO. 168 OF ANNEXURE 1 - LIST OF ITEMS

1 nos Delivery: 70 days
#169

Bearings DE and NDE for each type and rating of motors as per sr no 169 of annexure-1

MAKE AND MODEL AS PER S. NO. 169 OF ANNEXURE 1 - LIST OF ITEMS

8 nos Delivery: 70 days
#170

Stator winding coils for all type of LT motors as per sr no 170 of annexure-1

MAKE AND MODEL AS PER S. NO. 170 OF ANNEXURE 1 - LIST OF ITEMS

1 nos Delivery: 70 days
#171

Dust seals and gaskets for each type of motors as per sr no 171 of annexure-1

MAKE AND MODEL AS PER S. NO. 171 OF ANNEXURE 1 - LIST OF ITEMS

3 nos Delivery: 70 days
#172

Terminal plates as per sr no 172 of annexure-1

MAKE AND MODEL AS PER S. NO. 172 OF ANNEXURE 1 - LIST OF ITEMS

10 nos Delivery: 70 days
#173

Greasing arrangements as per sr no 173 of annexure-1

MAKE AND MODEL AS PER S. NO. 173 OF ANNEXURE 1 - LIST OF ITEMS

4 nos Delivery: 70 days
#174

Motor of each type and rating as per sr no 174 of annexure-1

MAKE AND MODEL AS PER S. NO. 174 OF ANNEXURE 1 - LIST OF ITEMS

1 nos Delivery: 70 days
#175

Bearings DE and NDE for each type and rating of motors as per sr no 175 of annexure-1

MAKE AND MODEL AS PER S. NO. 175 OF ANNEXURE 1 - LIST OF ITEMS

8 nos Delivery: 70 days
#176

Stator winding coils for all type of LT motors as per sr no 176 of annexure-1

MAKE AND MODEL AS PER S. NO. 176 OF ANNEXURE 1 - LIST OF ITEMS

1 nos Delivery: 70 days
#177

Dust seals and gaskets for each type of motors as per sr no 177 of annexure-1

MAKE AND MODEL AS PER S. NO. 177 OF ANNEXURE 1 - LIST OF ITEMS

3 nos Delivery: 70 days
#178

Terminal plates as per sr no 178 of annexure-1

MAKE AND MODEL AS PER S. NO. 178 OF ANNEXURE 1 - LIST OF ITEMS

10 nos Delivery: 70 days
#179

Greasing arrangements as per sr no 179 of annexure-1

MAKE AND MODEL AS PER S. NO. 179 OF ANNEXURE 1 - LIST OF ITEMS

4 nos Delivery: 70 days
#180

Motor of each type and rating as per sr no 180 of annexure-1

MAKE AND MODEL AS PER S. NO. 180 OF ANNEXURE 1 - LIST OF ITEMS

1 nos Delivery: 70 days
#181

Bearings DE and NDE for each type and rating of motors as per sr no 181 of annexure-1

MAKE AND MODEL AS PER S. NO. 181 OF ANNEXURE 1 - LIST OF ITEMS

8 nos Delivery: 70 days
#182

Stator winding coils for all type of LT motors as per sr no 182 of annexure-1

MAKE AND MODEL AS PER S. NO. 182 OF ANNEXURE 1 - LIST OF ITEMS

1 nos Delivery: 70 days
#183

Dust seals and gaskets for each type of motors as per sr no 183 of annexure-1

MAKE AND MODEL AS PER S. NO. 183 OF ANNEXURE 1 - LIST OF ITEMS

3 nos Delivery: 70 days
#184

Pressure Transmitter as per sr no 184 of annexure-1

MAKE AND MODEL AS PER S. NO. 184 OF ANNEXURE 1 - LIST OF ITEMS

4 nos Delivery: 70 days
#185

Temperature Transmitter as per sr no 185 of annexure-1

MAKE AND MODEL AS PER S. NO. 185 OF ANNEXURE 1 - LIST OF ITEMS

7 nos Delivery: 70 days
#186

Differential pressure Switches AIR as per sr no 186 of annexure-1

MAKE AND MODEL AS PER S. NO. 186 OF ANNEXURE 1 - LIST OF ITEMS

2 nos Delivery: 70 days
#187

Differential pressure Switches WATER as per sr no 187 of annexure-1

MAKE AND MODEL AS PER S. NO. 187 OF ANNEXURE 1 - LIST OF ITEMS

2 nos Delivery: 70 days
#188

Pressure switches as per sr no 188 of annexure-1

MAKE AND MODEL AS PER S. NO. 188 OF ANNEXURE 1 - LIST OF ITEMS

2 nos Delivery: 70 days
#189

Flow switches as per sr no 189 of annexure-1

MAKE AND MODEL AS PER S. NO. 189 OF ANNEXURE 1 - LIST OF ITEMS

3 nos Delivery: 70 days
#190

Level Switches as per sr no 190 of annexure-1

MAKE AND MODEL AS PER S. NO. 190 OF ANNEXURE 1 - LIST OF ITEMS

2 nos Delivery: 70 days
#191

Pressure gauges as per sr no 191 of annexure-1

MAKE AND MODEL AS PER S. NO. 191 OF ANNEXURE 1 - LIST OF ITEMS

13 nos Delivery: 70 days
#192

Temperature gauges as per sr no 192 of annexure-1

MAKE AND MODEL AS PER S. NO. 192 OF ANNEXURE 1 - LIST OF ITEMS

4 nos Delivery: 70 days
#193

Level Gauges as per sr no 193 of annexure-1

MAKE AND MODEL AS PER S. NO. 193 OF ANNEXURE 1 - LIST OF ITEMS

2 nos Delivery: 70 days
#194

Airstat as per sr no 194 of annexure-1

MAKE AND MODEL AS PER S. NO. 194 OF ANNEXURE 1 - LIST OF ITEMS

14 nos Delivery: 70 days
#195

Manifold 2 way as per sr no 195 of annexure-1

MAKE AND MODEL AS PER S. NO. 195 OF ANNEXURE 1 - LIST OF ITEMS

4 nos Delivery: 70 days
#196

Air cooled split type AC units consisting of outdoor unit as per sr no 196 of annexure-1

MAKE AND MODEL AS PER S. NO. 196 OF ANNEXURE 1 - LIST OF ITEMS

3 no Delivery: 70 days
#197

ELECTRIC WIRE ROPE HOIST OF CAP 3 TON LIFT 3 point 8 M as per sr no 197 of annexure-1

MAKE AND MODEL AS PER S. NO. 197 OF ANNEXURE 1 - LIST OF ITEMS

1 no Delivery: 70 days
#198

ELECTRIC WIRE ROPE HOIST OF CAP 3 TON LIFT 4 M as per sr no 198 of annexure-1

MAKE AND MODEL AS PER S. NO. 198 OF ANNEXURE 1 - LIST OF ITEMS

1 no Delivery: 70 days
#199

1 Ton Capacity chain Pully Block with travelling trolley and monorail arrangement as per sr no 199 of annexure-1

MAKE AND MODEL AS PER S. NO. 199 OF ANNEXURE 1 - LIST OF ITEMS

1 no Delivery: 70 days
#200

Manually operated platform trolley of 1 Ton capacity with base area 2m x 1 point 5m as per sr no 200 of annexure-1

MAKE AND MODEL AS PER S. NO. 200 OF ANNEXURE 1 - LIST OF ITEMS

1 no Delivery: 70 days

Required Documents

1

PAN Card copy

2

GSTIN copy

3

Cancelled cheque copy

4

EFT Mandate copy (bank-certified)

Corrigendum Updates

1 Update
#1

Update

25-Nov-2025

Extended Deadline

28-Nov-2025, 1:00 pm

Opening Date

28-Nov-2025, 1:30 pm

Reverse Auction Schedule

Completed

Start

05-Dec-2025, 1:00 pm

End

06-Dec-2025, 1:00 pm

Duration: 24 hours

Reverse Auction Document

✅ RA concluded. Check financial results for final rankings.

Technical Results

S.No Seller Item Date Status
1
AKSS AIRTECH (OPC) PRIVATE LIMITED   Under PMA
-21-11-2025 12:26:34
2
DABS AUTOMATION   Under PMA
-21-11-2025 16:24:59

Reverse Auction Results Final Prices

These are the final prices after the reverse auction event. Prices may be lower than initial bids.

Rank Seller Final Price Item
L1AKSS AIRTECH (OPC) PRIVATE LIMITED(MII)   Under PMA Winner ₹75,44,000Item Categories : Oil filter as per sr no 1 of annexure-1,Oil filter O ring as per sr no 2 of annexure-1,Refrigerant
L2DABS AUTOMATION (MII)   Under PMA₹75,52,162Item Categories : Oil filter as per sr no 1 of annexure-1,Oil filter O ring as per sr no 2 of annexure-1,Refrigerant

🎉 L1 Winner

AKSS AIRTECH (OPC) PRIVATE LIMITED(MII)   Under PMA

Final Price: ₹75,44,000

Contract / Result Documents 1

Please sign in or create an account to view contract details and download result documents.

Frequently Asked Questions

Key insights about UTTAR PRADESH tender market

What documents are required for BHEL vendor code creation tender in India 2025?

Bidders must submit PAN Card, GSTIN, Cancelled Cheque, and bank-certified EFT Mandate. In addition, ensure invoices are issued in the consignee name with the consignee GSTIN. GST rates may be reimbursed based on actuals or capped by quoted rates.

How does MSE purchase preference apply in this BHEL procurement in 2025?

MSE eligibility allows price preference if the bidder is the manufacturer of the offered product or service. If L-1 is not an MSE, an MSE seller within L-1+15% may be invited to match, enabling contract allocation for the proportionate value.

What is required to demonstrate local content under PP-LC for this tender?

Bidders must provide Make in India local content certification. For foreign bidders, a statutory auditor/cost auditor certificate or equivalent practicing professional certification showing local content percentage is acceptable; 20% is the minimum threshold for local content recognition.

What are the invoicing requirements for this BHEL tender in 2025?

Invoices must be raised in the consignee’s name and must include the consignee’s GSTIN. Payment processing aligns with GST compliance and may follow standard government payment terms after verification of documents submitted.

Where can bidders find the GST reimbursement policy for this tender in India?

GST reimbursement will follow actuals or the quoted GST rate, whichever is lower. This is subject to the applicable GST rates and the bidder’s quoted percentage, as specified in the tender terms.

What is the scope of BOQ in this BHEL procurement tender 2025?

The BOQ lists 200 total items, but exact quantities and units are not disclosed in the excerpt. Bidders should expect onboarding-related items and be prepared to supply documentation and onboarding services rather than physical goods.

What documents are essential for bid submission besides vendor onboarding?

Submit PAN, GSTIN, Cancelled Cheque, EFT Mandate, and any required vendor code creation documents. Ensure that GST invoicing aligns with consignee details and that MSE/Make in India declarations are supported with relevant certificates.

How to participate in BHEL procurement for vendor code creation in 2025?

Prepare vendor onboarding documents, ensure GST compliance, obtain MSE certification if applicable, and secure Make in India/local content certificates. Submit vendor code creation documents alongside standard bid materials and ensure invoicing aligns with consignee GSTIN once onboarding is complete.

Similar Tenders

5 found
Urgent

FILTER ELEMNT; TK-3451; GOVERING OIL FILTR

National Fertilizers Limited (nfl)

📍 GUNA, MADHYA PRADESH

⏰ Deadline: 3 days left
🛒 Type: Goods
View GEM

Indian Army Department Of Military Affairs LV1/R72 B-MTO-1-40-SB-1 Installed Oil Heat & Used Oil Air Clean Filter Tender 2026

Indian Army

📍 PUNE, MAHARASHTRA

EMD: ₹2.9 L
⏰ Deadline: 2 weeks left
🛒 Type: Goods
View GEM
Urgent

Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - Industry Unit; FRF

Odisha Power Generation Corporation Limited

📍 JHARSUGUDA, ODISHA

Est: ₹31.7 L
⏰ Deadline: 1 day left
🛒 Type: Service
View GEM

Indian Coast Guard O Ring & Air Filter Tender Thiruvananthapuram Kerala 2026 IS0/OEM Warranty 1 Year

Indian Coast Guard

📍 THIRUVANANTHAPURAM, KERALA

Est: ₹2.5 L
⏰ Deadline: 2 weeks left
🛒 Type: Goods
View GEM

Hindustan Aeronautics Limited RL 68H Refrigeration Oil Tender Nashik Maharashtra 2026

Hindustan Aeronautics Limited (hal)

📍 NASHIK, MAHARASHTRA

⏰ Deadline: 2 weeks left
🛒 Type: Goods
View GEM
Chat with us