Bid Publish Date
18-Jun-2026, 4:48 pm
Bid End Date
11-Jul-2026, 5:00 pm
EMD
₹46,153
Value
₹15,38,418
Location
Progress
Quantity
41
Category
AMC of SPOL System-1st Year.
Bid Type
Two Packet Bid
Airports Authority Of India has released a public tender for AMC of SPOL System-1st Year. , AMC of SPOL System-2nd Year. , Supply of maintenance free battery 12V 75AH with buy back arrangement. For 1st Year. , Supply of maintenance free battery 12V 75AH, with buy back arrangement. For 2nd Year. , Supply of heavy-duty Solar Charge Controller. in IMPHAL WEST, MANIPUR. Quantity: 41. Submission Deadline: 11-07-2026 17: 00: 00. Download documents and apply online.
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
AMC of SPOL System-1st Year. , AMC of SPOL System-2nd Year. , Supply of maintenance free battery 12V 75AH with buy back arrangement. For 1st Year. , Supply of maintenance free battery 12V 75AH, with buy back arrangement. For 2nd Year. , Supply of heavy-duty Solar Charge Controller.
Advisory Bank
State Bank of India
Payment Timelines
Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
730
Delivery Locations
1
Delivery Cities
Imphal West
Delivery Pincodes
795140
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Semreichui Duidang | 795140,O/o Airport Director, Airports Authority of India, Imphal Airport | Imphal West | Manipur | 795140 | 12 | 730 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
AMC of SPOL System-1st Year.
Annual Maintenance of Solar Powered Obstruction Lighting System installed on 5 Hill-tops surrounding Imphal Airport namely Nongmaiching Hill, Chingfu Hill, Heibok Hill, Maring Phunal and Langjing Hill including minor repairs, replacement of minor components and any other required components associated like lattice tower, foundation, earthing system and carry out preventive maintenance as per attached schedule to keep the system operational for night landing at Imphal Airport. For 1st Year.
AMC of SPOL System-2nd Year.
Annual Maintenance of Solar Powered Obstruction Lighting System installed on 5 Hill-tops surrounding Imphal Airport namely Nongmaiching Hill, Chingfu Hill, Heibok Hill, Maring Phunal and Langjing Hill including minor repairs, replacement of minor components and any other required components associated like lattice tower, foundation, earthing system and carry out preventive maintenance as per attached schedule to keep the system operational for night landing at Imphal Airport. For 2nd Year.
Supply of maintenance free battery 12V 75AH with buy back arrangement. For 1st Year.
Supply of maintenance free battery 12-volts, 75AH, with buy back arrangement. For 1st Year.
Supply of maintenance free battery 12V 75AH, with buy back arrangement. For 2nd Year.
Supply of maintenance free battery 12-volts, 75AH, with buy back arrangement. For 2nd Year.
Supply of heavy-duty Solar Charge Controller.
Supply of heavy-duty Solar Charge Controller suitable for 148 WP Solar Module (4 Nos. 74 WP Solar PV Module, 2 Nos. parallel and 2 Nos. Series model) for charging 24 V 150 AH battery bank (12 V, 75 AH-4 Nos) with over charge, under charge, low bat, Sc protection with indicators and consisting of dawn to dusk control for operating Aviation Obstruction Warning Light of medium intensity, 10 No. 24 V and 2 x 11 W street light of reputed make.
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | AMC of SPOL System-1st Year. | Annual Maintenance of Solar Powered Obstruction Lighting System installed on 5 Hill-tops surrounding Imphal Airport namely Nongmaiching Hill, Chingfu Hill, Heibok Hill, Maring Phunal and Langjing Hill including minor repairs, replacement of minor components and any other required components associated like lattice tower, foundation, earthing system and carry out preventive maintenance as per attached schedule to keep the system operational for night landing at Imphal Airport. For 1st Year. | 12 | month | buycon147.aai.mn | 730 | |
| 2 | AMC of SPOL System-2nd Year. | Annual Maintenance of Solar Powered Obstruction Lighting System installed on 5 Hill-tops surrounding Imphal Airport namely Nongmaiching Hill, Chingfu Hill, Heibok Hill, Maring Phunal and Langjing Hill including minor repairs, replacement of minor components and any other required components associated like lattice tower, foundation, earthing system and carry out preventive maintenance as per attached schedule to keep the system operational for night landing at Imphal Airport. For 2nd Year. | 12 | month | buycon147.aai.mn | 730 | |
| 3 | Supply of maintenance free battery 12V 75AH with buy back arrangement. For 1st Year. | Supply of maintenance free battery 12-volts, 75AH, with buy back arrangement. For 1st Year. | 8 | number | buycon147.aai.mn | 730 | |
| 4 | Supply of maintenance free battery 12V 75AH, with buy back arrangement. For 2nd Year. | Supply of maintenance free battery 12-volts, 75AH, with buy back arrangement. For 2nd Year. | 4 | number | buycon147.aai.mn | 730 | |
| 5 | Supply of heavy-duty Solar Charge Controller. | Supply of heavy-duty Solar Charge Controller suitable for 148 WP Solar Module (4 Nos. 74 WP Solar PV Module, 2 Nos. parallel and 2 Nos. Series model) for charging 24 V 150 AH battery bank (12 V, 75 AH-4 Nos) with over charge, under charge, low bat, Sc protection with indicators and consisting of dawn to dusk control for operating Aviation Obstruction Warning Light of medium intensity, 10 No. 24 V and 2 x 11 W street light of reputed make. | 5 | number | buycon147.aai.mn | 730 |
Discover companies most likely to bid on this tender
Experience Criteria
Bidder Turnover
Certificate (Requested in ATC)
OEM Annual Turnover
Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Extended Deadline
11-Jul-2026, 5:00 pm
Opening Date
11-Jul-2026, 5:30 pm
Extended Deadline
06-Jul-2026, 5:00 pm
Opening Date
06-Jul-2026, 5:30 pm
Sign up now to access all documents
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS