Bid Publish Date
12-Jun-2026, 6:50 pm
Bid End Date
29-Jun-2026, 5:00 pm
Location
Progress
Quantity
57
Category
Submersible Pumpsets (Three Phase) Conforming To IS 8034 (V2)
Bid Type
Two Packet Bid
Public procurement opportunity for E-nagar Palika Government Of Madhya Pradesh Submersible Pumpsets (Three Phase) Conforming To IS 8034 (V2) (Q2), Submersible Pump Starters (Motor starter controls) (Q3) in MANDSAUR, MADHYA PRADESH. Quantity: 57 issued by. Submission Deadline: 29-06-2026 17: 00: 00. View full details and respond.
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Submersible Pumpsets (Three Phase) Conforming To IS 8034 (V2) (Q2) , Submersible Pump Starters (Motor starter controls) (Q3)
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
CATALOG Specification
CATALOG Specification
GEM_GENERAL_TERMS_AND_CONDITIONS
| Category | Specification | Requirement |
|---|---|---|
| GENRIC | BEE Star Rating (Hint: In case star rating is not applicable please select "0") | 3, 4, 5 Or higher |
| GENRIC | Number of Pump Stages | Multistage |
| PERFORMANCE PARAMETERS | Discharge Capacity (in Litres Per Hour) | 3.33 |
| PERFORMANCE PARAMETERS | Discharge Head | 60.0 |
| CONSTRUCTION | Motor Type and Duty | ISI Marked to IS:9283 latest of wet type for continuous rating synchronous ,Type B,Duty Type-S1 |
| CONSTRUCTION | Number of Motor Poles | 2 pole |
| CONSTRUCTION | Motor Power Rating | 22.0 |
| CONSTRUCTION | Maximum Rated Current | 29.0 |
| CONSTRUCTION | Control Panel with Starter, ISI Marked MCB/Main Switch, Ammeter, Voltmeter, Water Level Indicator and Single Phase Preventer Provided | No |
Discover companies most likely to bid on this tender
Experience Criteria
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
Additional Doc 1 (Requested in ATC)
Additional Doc 2 (Requested in ATC)
Additional Doc 3 (Requested in ATC)
Additional Doc 4 (Requested in ATC)
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Extended Deadline
29-Jun-2026, 5:00 pm
Opening Date
29-Jun-2026, 5:30 pm
Sign up now to access all documents
Main Document
CATALOG Specification
CATALOG Specification
GEM_GENERAL_TERMS_AND_CONDITIONS