Tender Notice for Bearing housing with stuffing box,Pump Bowl,Transmission Line shaft 100 mm dia X 1510 mm L,Bearing in MUMBAI, MAHARASHTRA

Bid Publish Date

03-Aug-2026, 12:35 pm

Bid End Date

24-Aug-2026, 2:00 pm

Progress

Issue03-Aug-2026, 12:35 pm
AwardPending

Directorate Of Purchase And Stores announces a tender for Bearing housing with stuffing box, Pump Bowl, Transmission Line shaft 100 mm dia X 1510 mm L, Bearing holder for Bowl Thordon bearing, Thordon bowl bearing for impeller shaft with bowl bearing Holder, Impeller shaft sleeve Stellite coated for Thordon bearing 400 mm, Bearing bush without collar bottom stuffing box bush 200 mm length, Bearing bush spider 210 mm length, Stuffing box sleeve OD-106, ID-92, L-278, Spider bearing shaft sleeve L-250, Gland Packing, Foundation studs M 24 x 3 x 132, Hex nut M 20 for Pump Bowl, Grub screws M 6 x 15 for spider bush locking, Line shaft sleeve key 12 x 08 x 30 mm, Impeller key 12 x 08 x 140 mm, Thrust collar key 12 x 08 x 28 mm, Ratchet pin set, Coupling pin nylock nut, Pump coupling pin, Coupling Rubber Bush in MUMBAI, MAHARASHTRA. Quantity: 477. Submission Deadline: 24-08-2026 14: 00: 00. Last date to apply is approaching fast!

Authority & Contact

Office Name

Directorate Of Purchase And Stores

Ministry

PMO

Grievance Contact

[email protected]

Tender Data

Bid Details

Quantity

477

Category

Bearing housing with stuffing box

Bid Type

Single Packet Bid

Bid Validity

150 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

3 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

Yes

Startup Exemption/Relaxation

Yes

Bid Splitting Applied

No

Requirements

Warranty Period

1 years

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Bearing housing with stuffing box , Pump Bowl , Transmission Line shaft 100 mm dia X 1510 mm L , Bearing holder for Bowl Thordon bearing , Thordon bowl bearing for impeller shaft with bowl bearing Holder , Impeller shaft sleeve Stellite coated for Thordon bearing 400 mm , Bearing bush without collar bottom stuffing box bush 200 mm length , Bearing bush spider 210 mm length , Stuffing box sleeve OD-106, ID-92, L-278 , Spider bearing shaft sleeve L-250 , Gland Packing , Foundation studs M 24 x 3 x 132 , Hex nut M 20 for Pump Bowl , Grub screws M 6 x 15 for spider bush locking , Line shaft sleeve key 12 x 08 x 30 mm , Impeller key 12 x 08 x 140 mm , Thrust collar key 12 x 08 x 28 mm , Ratchet pin set , Coupling pin nylock nut , Pump coupling pin , Coupling Rubber Bush

Advisory Bank

State Bank of India

ePBG Percentage

5%

ePBG Duration (Months)

23

Delivery Details

Max Delivery Days

270

Delivery Locations

1

Delivery Cities

Mumbai Suburban

Delivery Pincodes

400085

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Dattatray Ashok Vispute400085,Material Receipt Cell (MRC), North Gate, Central Stores Unit, BARC, TROMBAY, MUMBAIMumbai SuburbanMaharashtra4000851270-

Authority Records

DEPARTMENT OF ATOMIC ENERGY

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 6

GeM-Bidding-9689916.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 21 Items Sign in for GEM prices

#1

Bearing housing with stuffing box

as per attached specifications

1 number Delivery: 270 days
#2

Pump Bowl

as per attached specifications

1 number Delivery: 270 days
#3

Transmission Line shaft 100 mm dia X 1510 mm L

as per attached specifications

3 number Delivery: 270 days
#4

Bearing holder for Bowl Thordon bearing

as per attached specifications

2 number Delivery: 270 days
#5

Thordon bowl bearing for impeller shaft with bowl bearing Holder

as per attached specifications

2 number Delivery: 270 days
#6

Impeller shaft sleeve Stellite coated for Thordon bearing 400 mm

as per attached specifications

3 number Delivery: 270 days
#7

Bearing bush without collar bottom stuffing box bush 200 mm length

as per attached specifications

4 number Delivery: 270 days
#8

Bearing bush spider 210 mm length

as per attached specifications

6 number Delivery: 270 days
#9

Stuffing box sleeve OD-106, ID-92, L-278

as per attached specifications

8 number Delivery: 270 days
#10

Spider bearing shaft sleeve L-250

as per attached specifications

10 number Delivery: 270 days
#11

Gland Packing

as per attached specifications

5 set Delivery: 270 days
#12

Foundation studs M 24 x 3 x 132

as per attached specifications

50 number Delivery: 270 days
#13

Hex nut M 20 for Pump Bowl

as per attached specifications

150 number Delivery: 270 days
#14

Grub screws M 6 x 15 for spider bush locking

as per attached specifications

50 number Delivery: 270 days
#15

Line shaft sleeve key 12 x 08 x 30 mm

as per attached specifications

30 number Delivery: 270 days
#16

Impeller key 12 x 08 x 140 mm

as per attached specifications

10 number Delivery: 270 days
#17

Thrust collar key 12 x 08 x 28 mm

as per attached specifications

10 number Delivery: 270 days
#18

Ratchet pin set

as per attached specifications

2 set Delivery: 270 days
#19

Coupling pin nylock nut

as per attached specifications

50 number Delivery: 270 days
#20

Pump coupling pin

as per attached specifications

50 number Delivery: 270 days
#21

Coupling Rubber Bush

as per attached specifications

30 number Delivery: 270 days

Categories 57

Required Documents

1

Certificate (Requested in ATC)

2

OEM Authorization Certificate

3

Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria

4

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer