Bid Publish Date
16-Feb-2026, 7:52 pm
Bid End Date
02-Mar-2026, 9:00 am
EMD
₹30,49,560
Progress
Quantity
5997035
Category
1 LCV 9 Ton Rate per Vehicle per Km per ton in HCP Rohtang and Zozilz Axis
Bid Type
Two Packet Bid
The Indian Army, Department of Military Affairs, invites bids for LCV 9 ton vehicle transportation on the Rohtang and Zozila (Zozilz) Axis, including per vehicle per kilometer per ton rates and associated night and day halt charges. The bid includes multiple rate components for Rohtang and Zozila corridors, with an emphasis on flexible quantity handling under the option clause up to 50% of original bid quantity. The estimated contract value is undisclosed; however, the EMD amount is ₹3,049,560. Bidders should prepare to demonstrate capacity to operate in high-altitude, challenging terrain with on-time delivery commitments. This procurement focuses on sustained mobility support along critical mountainous routes and requires compliance with the purchaser’s option-based delivery framework.
Service: LCV 9 Ton transport
Route: Rohtang and Zojila Axis
Charges: Night Halt and Day Halt charges
EMD: ₹3,049,560
Quantity flexibility: +/- up to 50% of bid quantity
Delivery terms: per original delivery order baseline with option-derived extensions
Key term: 50% quantity variation under option clause with contracted rates
Key term: EMD amount ₹3,049,560 and vendor code bank documentation
Key term: Delivery period linked to original order date with extension rules
Not explicitly detailed in available data; bidders should anticipate standard govt terms and verify with purchaser.
Delivery period commences from the last date of original delivery order; extended time calculated per formula, minimum 30 days.
Not specified in provided terms; bidders should confirm LD terms during offer submission.
Demonstrated ability to operate LCV 9 Ton transport services
Compliance with vendor code creation and banking documentation
Adherence to option clause permitting quantity adjustments up to 50%
Main Document
OTHER
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | 1 LCV 9 Ton Rate per Vehicle per Km per ton in HCP Rohtang and Zozilz Axis | 1 Rate per Vehicle per Km per ton in HCP Rohtang and Zozilz Axis | 1,997,490 | km x ton | ankitbuyer_gem | 365 |
| 2 | 2 LCV 9 Ton Rate per Vehicle per Km per ton in HCP Rohtang and Zozilz Axis | 2 Rate per Vehicle per Km per ton in HCP Rohtang and Zozilz Axis | 1,997,490 | km x ton | ankitbuyer_gem | 365 |
| 3 | 3 LCV 9 Ton Rate per Vehicle per Km per ton in HCP Rohtang and Zozilz Axis | 3 Rate per Vehicle per Km per ton in HCP Rohtang and Zozilz Axis | 1,997,490 | km x ton | ankitbuyer_gem | 365 |
| 4 | LCV 9 Ton Night Halt Charges | Night Halt Charges | 2,310 | nos | ankitbuyer_gem | 365 |
| 5 | LCV 9 Ton Day Halt Charge | Day Halt Charge | 2,255 | nos | ankitbuyer_gem | 365 |
Discover companies most likely to bid on this tender
PAN Card copy
GSTIN copy
Cancelled Cheque copy
EFT Mandate copy certified by bank
Vendor code creation documentation
Bidders should prepare PAN, GSTIN, Cancelled Cheque, and bank-certified EFT Mandate for vendor code creation. Ensure EMD of ₹3,049,560 is deposited and monitor option clause allowing up to 50% quantity variation. Align bid rates per vehicle per km per ton with night/day halt charges.
Submit PAN, GSTIN, Cancelled Cheque, and EFT Mandate certified by bank; provide vendor code creation information and any organization-specific registration certificates. Ensure all documents reflect current details and are legible for verification by the procurement team.
The purchaser may increase or decrease quantity up to 50% of bid quantity at contract placement and during currency. Delivery time adjusts using (increased quantity/original quantity) × original delivery period, minimum 30 days; extended time allowed per clause.
The earnest money deposit required is ₹3,049,560. Ensure funds are remitted as per the prescribed payment mode and proper reference is included in the bid submission for eligibility.
Delivery starts from the last date of the original delivery order. If quantity is increased, the extension follows the formula with a minimum 30 days; ensure coordination with the issuing authority for order dates.
The tender specifies separate rates for Night Halt and Day Halt charges for LCV 9 Ton transport on the Rohtang and Zozila Axis. Exact per-halt rates should be confirmed in the ATC document and price bid format.
Submit PAN, GSTIN, Cancelled Cheque, and EFT Mandate; ensure bank certification of mandate and accurate bank details to enable electronic funds transfer and vendor registration in the Army procurement system.
No explicit technical standards are listed in the available data; bidders should verify any mandatory certifications during ATC review and confirm alignment with Army procurement guidelines and transport safety requirements.
Sign up now to access all documents
Main Document
OTHER
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS