Design,Supplying, Fabrication, Erection and Commissioning including 3 (three) months Trial Run of 25m3hr. capacity Pressure type IRON ELIMINATION Plant with Construction of Blower room and backwash water disposal at head work site of PURBA BINODPUR
PHE
📍 MALDAH, WEST BENGAL