TenderDekho Logo
Active GEM

Contract Bidding Open For Self starter repair and fitment,Fly wheel sensor,Relay 12v,Fog light assy,Hood light assy,Hood ligh in BANGALORE, KARNATAKA

Bid Publish Date

12-Oct-2026, 12:13 pm

Bid End Date

23-Oct-2026, 11:00 am

Progress

Issue12-Oct-2026, 12:13 pm
AwardPending

Indian Army has released a public tender for Self starter repair and fitment, Fly wheel sensor, Relay 12v, Fog light assy, Hood light assy, Hood light wiring with sleeving, RAM assy new, Hood air pressur pipe, Clutch release bearing, Gear box repair with accessories and assembling, Mud guard mats, Fixing of new fan belt water pump bolts 8nos, Electrical labour charges, Mechanical labour charges for removal and reassembling, Clutch plate, Clutch pressure plate, Clutch Sleeve cylinder assy, Clutch booster, Fly wheel bearing, Fly wheel lock, UJ cross spider bearing, Hub packing seal nut and bolt, Hood lifting pump assy, Loom wiring with sleeving, Reverse light switch, Reverse horn buzzer, Mechanical labour charges for removal and re-assembling, Tail light assy RH LH, Fuse 10 ampier, Reverse switch wiring, Hub packing seal nuts and bolt, Indicator assy RH LH, Side mud guard indicator RH LH, Mechanical labour charges for removal and re assembling, Hood lifting pump pipes, Hood lifting pump 3 way union, Front wheel knuckle knuckle bearing oil seal and other spares, Knuckle oil seal big, Knuckle oil seal small, Sid mud guard indicator RH LH, Reverse switch, Steering pump, Overhauling and fitment of Hydraulic power steering assembly, Spring leaf front RH, Labour charges for removal and re-assembling of spring leaf, Exhaust brake air switch, Exhaust brake switch wiring with sleeving, Rear bearing Inner, Rear bearing ourter, Rear hub packing, Front hub brake shoe spring, Door mechanism RH in BANGALORE, KARNATAKA. Quantity: 121. Submission Deadline: 23-10-2026 11: 00: 00. Download documents and apply online.

Advertisement

Tender Data

Bid Details

Quantity

121

Category

Self starter repair and fitment

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

H1-Highest Priced Bid Elimination

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

Self starter repair and fitment , Fly wheel sensor , Relay 12v , Fog light assy , Hood light assy , Hood light wiring with sleeving , RAM assy new , Hood air pressur pipe , Clutch release bearing , Gear box repair with accessories and assembling , Mud guard mats , Fixing of new fan belt water pump bolts 8nos , Electrical labour charges , Mechanical labour charges for removal and reassembling , Clutch plate , Clutch pressure plate , Clutch Sleeve cylinder assy , Clutch booster , Fly wheel bearing , Fly wheel lock , UJ cross spider bearing , Hub packing seal nut and bolt , Hood lifting pump assy , Loom wiring with sleeving , Reverse light switch , Reverse horn buzzer , Mechanical labour charges for removal and re-assembling , Tail light assy RH LH , Fuse 10 ampier , Reverse switch wiring , Hub packing seal nuts and bolt , Indicator assy RH LH , Side mud guard indicator RH LH , Mechanical labour charges for removal and re assembling , Hood lifting pump pipes , Hood lifting pump 3 way union , Front wheel knuckle knuckle bearing oil seal and other spares , Knuckle oil seal big , Knuckle oil seal small , Sid mud guard indicator RH LH , Reverse switch , Steering pump , Overhauling and fitment of Hydraulic power steering assembly , Spring leaf front RH , Labour charges for removal and re-assembling of spring leaf , Exhaust brake air switch , Exhaust brake switch wiring with sleeving , Rear bearing Inner , Rear bearing ourter , Rear hub packing , Front hub brake shoe spring , Door mechanism RH

Delivery Details

Max Delivery Days

45

Delivery Locations

1

Delivery Cities

Bangalore

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-BangaloreBangalore--145-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-10019608.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

Indian Army

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Bill of Quantities (BOQ) 80 Items Sign in for GEM prices

#1

Self starter repair and fitment

AS PER RFP

1 job Delivery: 45 days
#2

Fly wheel sensor

AS PER RFP

1 nos Delivery: 45 days
#3

Relay 12v

AS PER RFP

3 nos Delivery: 45 days
#4

Fog light assy

AS PER RFP

2 nos Delivery: 45 days
#5

Hood light assy

AS PER RFP

2 nos Delivery: 45 days
#6

Hood light wiring with sleeving

AS PER RFP

1 job Delivery: 45 days
#7

RAM assy new

AS PER RFP

1 nos Delivery: 45 days
#8

Hood air pressur pipe

AS PER RFP

1 nos Delivery: 45 days
#9

Clutch release bearing

AS PER RFP

1 nos Delivery: 45 days
#10

Gear box repair with accessories and assembling

AS PER RFP

1 job Delivery: 45 days
#11

Mud guard mats

AS PER RFP

4 nos Delivery: 45 days
#12

Fixing of new fan belt water pump bolts 8nos

AS PER RFP

1 nos Delivery: 45 days
#13

Fly wheel sensor

AS PER RFP

1 nos Delivery: 45 days
#14

Electrical labour charges

AS PER RFP

1 job Delivery: 45 days
#15

Mechanical labour charges for removal and reassembling

AS PER RFP

1 job Delivery: 45 days
#16

Clutch plate

AS PER RFP

1 nos Delivery: 45 days
#17

Clutch pressure plate

AS PER RFP

1 nos Delivery: 45 days
#18

Clutch Sleeve cylinder assy

AS PER RFP

1 nos Delivery: 45 days
#19

Clutch booster

AS PER RFP

1 nos Delivery: 45 days
#20

Clutch release bearing

AS PER RFP

1 nos Delivery: 45 days
#21

Fly wheel bearing

AS PER RFP

1 nos Delivery: 45 days
#22

Fly wheel lock

AS PER RFP

1 nos Delivery: 45 days
#23

UJ cross spider bearing

AS PER RFP

1 nos Delivery: 45 days
#24

Hub packing seal nut and bolt

AS PER RFP

2 nos Delivery: 45 days
#25

Mechanical labour charges for removal and reassembling

AS PER RFP

1 job Delivery: 45 days
#26

Hood lifting pump assy

AS PER RFP

1 nos Delivery: 45 days
#27

Loom wiring with sleeving

AS PER RFP

1 job Delivery: 45 days
#28

Hood light assy

AS PER RFP

2 nos Delivery: 45 days
#29

Reverse light switch

AS PER RFP

1 nos Delivery: 45 days
#30

Reverse horn buzzer

AS PER RFP

1 nos Delivery: 45 days
#31

Mud guard mats

AS PER RFP

3 nos Delivery: 45 days
#32

Electrical labour charges

AS PER RFP

1 job Delivery: 45 days
#33

Mechanical labour charges for removal and re-assembling

AS PER RFP

1 job Delivery: 45 days
#34

Hood lifting pump assy

AS PER RFP

1 nos Delivery: 45 days
#35

Hood air pressur pipe

AS PER RFP

1 nos Delivery: 45 days
#36

Tail light assy RH LH

AS PER RFP

2 nos Delivery: 45 days
#37

Reverse horn buzzer

AS PER RFP

1 nos Delivery: 45 days
#38

Fuse 10 ampier

AS PER RFP

1 nos Delivery: 45 days
#39

Reverse switch wiring

AS PER RFP

2 mtrs Delivery: 45 days
#40

Hub packing seal nuts and bolt

AS PER RFP

2 nos Delivery: 45 days
#41

Fog light assy

AS PER RFP

2 nos Delivery: 45 days
#42

Indicator assy RH LH

AS PER RFP

2 nos Delivery: 45 days
#43

Side mud guard indicator RH LH

AS PER RFP

2 nos Delivery: 45 days
#44

Mud guard mats

AS PER RFP

4 nos Delivery: 45 days
#45

Electrical labour charges

AS PER RFP

1 job Delivery: 45 days
#46

Mechanical labour charges for removal and re assembling

AS PER RFP

1 job Delivery: 45 days
#47

Hood lifting pump pipes

AS PER RFP

2 nos Delivery: 45 days
#48

Hood lifting pump 3 way union

AS PER RFP

1 nos Delivery: 45 days
#49

Front wheel knuckle knuckle bearing oil seal and other spares

AS PER RFP

2 nos Delivery: 45 days
#50

Knuckle oil seal big

AS PER RFP

2 nos Delivery: 45 days
#51

Knuckle oil seal small

AS PER RFP

4 nos Delivery: 45 days
#52

Indicator assy RH LH

AS PER RFP

2 nos Delivery: 45 days
#53

Fog light assy

AS PER RFP

2 nos Delivery: 45 days
#54

Tail light assy RH LH

AS PER RFP

2 nos Delivery: 45 days
#55

Sid mud guard indicator RH LH

AS PER RFP

2 nos Delivery: 45 days
#56

Hood light assy

AS PER RFP

2 nos Delivery: 45 days
#57

Reverse switch

AS PER RFP

1 nos Delivery: 45 days
#58

Reverse horn buzzer

AS PER RFP

1 nos Delivery: 45 days
#59

Hood light wiring with sleeving

AS PER RFP

1 job Delivery: 45 days
#60

Steering pump

AS PER RFP

1 nos Delivery: 45 days
#61

Overhauling and fitment of Hydraulic power steering assembly

AS PER RFP

1 job Delivery: 45 days
#62

Spring leaf front RH

AS PER RFP

1 nos Delivery: 45 days
#63

Labour charges for removal and re-assembling of spring leaf

AS PER RFP

1 job Delivery: 45 days
#64

Hub packing seal nut and bolt

AS PER RFP

2 nos Delivery: 45 days
#65

Mud guard mats

AS PER RFP

2 nos Delivery: 45 days
#66

Electrical labour charges

AS PER RFP

1 job Delivery: 45 days
#67

Mechanical labour charges for removal and re assembling

AS PER RFP

1 job Delivery: 45 days
#68

Hood air pressur pipe

AS PER RFP

1 nos Delivery: 45 days
#69

Hood lifting pump 3 way union

AS PER RFP

1 nos Delivery: 45 days
#70

Exhaust brake air switch

AS PER RFP

1 nos Delivery: 45 days
#71

Exhaust brake switch wiring with sleeving

AS PER RFP

1 job Delivery: 45 days
#72

Rear bearing Inner

AS PER RFP

2 nos Delivery: 45 days
#73

Rear bearing ourter

AS PER RFP

2 nos Delivery: 45 days
#74

Rear hub packing

AS PER RFP

2 nos Delivery: 45 days
#75

Front hub brake shoe spring

AS PER RFP

2 nos Delivery: 45 days
#76

Mud guard mats

AS PER RFP

4 nos Delivery: 45 days
#77

Door mechanism RH

AS PER RFP

1 nos Delivery: 45 days
#78

Hub packing seal nut and bolt

AS PER RFP

2 nos Delivery: 45 days
#79

Electrical labour charges

AS PER RFP

1 job Delivery: 45 days
#80

Mechanical labour charges for removal and re assembling

AS PER RFP

1 job Delivery: 45 days

Categories 32

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Certificate (Requested in ATC)

3

Additional Doc 1 (Requested in ATC)

4

Additional Doc 2 (Requested in ATC)

5

Additional Doc 3 (Requested in ATC)

6

Additional Doc 4 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria

7

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Advertisement