Progress
RAOil And Natural Gas Corporation Limited has released a public tender for Skid Mounted Motor Driven Stationary Fire Pump Packages- Minimum Flow Rate: 300 m3/hr, Skid Mounted Motor Driven Stationary Fire Pump Packages-Minimum Flow Rate: 400 m3/hr, Motor Driven Vertical Turbine type Stationary Fire Pump Packages-Minimum Flow Rate: 300 m3/hr in SIVASAGAR, ASSAM. Quantity: 8. Submission Deadline: 27-04-2026 16: 00: 00. Download documents and apply online.
Please sign in or create an account to view contract details and download result documents.
Start
11-Sep-2026, 8:00 pm
End
12-Sep-2026, 8:00 pm
Duration: 24 hours
Reverse Auction Document
✅ RA concluded. Check financial results for final rankings.
Quantity
8
Category
Skid Mounted Motor Driven Stationary Fire Pump Packages- Minimum Flow Rate: 300 m3/hr
Bid Type
Two Packet Bid
Bid Validity
90 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
Yes
RA Qualification Rule
H1-Highest Priced Bid Elimination
Tech Clarification Time
5 Days
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Skid Mounted Motor Driven Stationary Fire Pump Packages- Minimum Flow Rate: 300 m3/hr , Skid Mounted Motor Driven Stationary Fire Pump Packages-Minimum Flow Rate: 400 m3/hr , Motor Driven Vertical Turbine type Stationary Fire Pump Packages-Minimum Flow Rate: 300 m3/hr
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
TECHNICAL
TECHNICAL
TECHNICAL
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Extended Deadline
27-Apr-2026, 10:30 am
Opening Date
27-Apr-2026, 11:00 am
Extended Deadline
23-Apr-2026, 9:30 am
Opening Date
23-Apr-2026, 10:00 am
Extended Deadline
16-Apr-2026, 9:30 am
Opening Date
16-Apr-2026, 10:00 am
Experience Criteria
Certificate (Requested in ATC)
OEM Authorization Certificate
Additional Doc 1 (Requested in ATC)
Additional Doc 2 (Requested in ATC)
Additional Doc 3 (Requested in ATC)
Additional Doc 4 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer