Progress
RAQuantity
21
Category
Cris Controller Card
Bid Type
Two Packet Bid
Indian Army Department of Military Affairs invites bids for a multi-item procurement categorized under various Cris modules including Cris Controller Card, Cris Driver Amplifier, Cris Battery, Battery Charger Libra, Battery Charger, MPSU, Toggle Switch, Cris Base Band and LO Card. The location is Sonitpur, Assam (784001) with the overall scope spanning eight BoQ items. The ATC highlights a flexible quantity clause and post-award option to adjust order size by up to 25%, at contracted rates, across the contract period. Bidders must comply with the option clause, and follow the delivery timeline linked to the original delivery order, with extended delivery time formula provided. The terms emphasize vendor compliance, pre-dispatch/online inspection options, and bidder documentation alongside bid submission. The procurement targets specialized military-grade electrical and electronic modules, with emphasis on conformity to exacting military and supplier qualification norms. Unique aspects include the option for quantity variation and inspection modalities. This tender requires readiness for rapid procurement of critical Cris subsystems and associated components.
Cris Controller Card
Cris Driver Amplifier
Cris Battery
Battery Charger Libra
Battery Charger
MPSU
Toggle Switch
Cris Base Band and LO Card
Eight BoQ items identified; exact quantities not disclosed
Delivery period starts from last date of original delivery order; extended delivery formula
Inspection modalities: Pre-dispatch at seller premises or online post-receipt
Documentation: PAN, GSTIN, Cancelled Cheque, EFT Mandate
Quantity adjustment clause up to 25% during and after contract
Delivery timeline tied to original delivery order; extended period rules apply
Mandatory bidder documents: PAN, GSTIN, Cancelled Cheque, EFT Mandate
Inspection options include pre-dispatch or post-receipt; nominations apply
Compliance with Buyer Added Terms and Conditions is required
No explicit payment terms provided; bidders should align with standard Army EFT/advance terms per ATC
Delivery period commences from the last date of the original delivery order; extended time computed as (Increased quantity/Original quantity) × Original delivery period, minimum 30 days
Not specified in data; apply standard LD clauses per Army procurement terms if referenced in ATC
Compliance with Buyer Added Terms and Conditions
Capability to supply Cris subsystems and related modules
Submission of PAN, GSTIN, Cancelled Cheque, EFT Mandate and vendor-code related documents
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Cris Controller Card , Cris Driver Amplifier , Cris Battery , Battery Charger Libra , Battery Charger , MPSU , Toggle Switch , Cris Base Band and LO Card
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Cris Controller Card
Cris Controller Card
Cris Driver Amplifier
Cris Driver Amplifier
Cris Battery
Cris Battery
Battery Charger Libra
Battery Charger Libra
Battery Charger
Battery Charger
MPSU
MPSU
Toggle Switch
Toggle Switch
Cris Base Band and LO Card
Cris Base Band and LO Card
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Cris Controller Card | Cris Controller Card | 1 | nos | [email protected] | 15 | |
| 2 | Cris Driver Amplifier | Cris Driver Amplifier | 1 | nos | [email protected] | 15 | |
| 3 | Cris Battery | Cris Battery | 3 | nos | [email protected] | 15 | |
| 4 | Battery Charger Libra | Battery Charger Libra | 2 | nos | [email protected] | 15 | |
| 5 | Battery Charger | Battery Charger | 2 | nos | [email protected] | 15 | |
| 6 | MPSU | MPSU | 7 | nos | [email protected] | 15 | |
| 7 | Toggle Switch | Toggle Switch | 3 | nos | [email protected] | 15 | |
| 8 | Cris Base Band and LO Card | Cris Base Band and LO Card | 2 | nos | [email protected] | 15 |
PAN Card copy
GSTIN copy
Cancelled cheque copy
EFT Mandate certified by Bank
Documents for vendor code creation (as per Terms)
Any other bidder-submission documents specified under Buyer Added Terms and Conditions
Technical compliance certificates or OEM authorizations if applicable
Start
11-Jan-2026, 12:00 pm
End
12-Jan-2026, 12:00 pm
Duration: 24 hours
Reverse Auction Document
✅ RA concluded. Check financial results for final rankings.
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | GR ENTERPRISES Under PMA | - | 04-01-2026 18:22:46 | |
| 2 | hrsales&services Under PMA | - | 08-01-2026 21:23:56 | |
| 3 | TANU TRADERS Under PMA | - | 03-01-2026 19:58:31 |
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | TANU TRADERS(MSE,MII)( MSE Social Category:OBC ) Under PMA | Item Categories : Cris Controller Card,Cris Driver Amplifier,Cris Battery,Battery Charger Libra,Battery Charger,MPSU, | |
| L2 | hrsales&services (MSE,MII)( MSE Social Category:General ) Under PMA | Item Categories : Cris Controller Card,Cris Driver Amplifier,Cris Battery,Battery Charger Libra,Battery Charger,MPSU, | |
| L3 | GR ENTERPRISES (MSE,MII)( MSE Social Category:OBC ) Under PMA | Item Categories : Cris Controller Card,Cris Driver Amplifier,Cris Battery,Battery Charger Libra,Battery Charger,MPSU, |
Key insights about ASSAM tender market
Bidders must submit PAN, GSTIN, Cancelled Cheque and EFT Mandate along with vendor-code creation documents. Ensure compliance with Buyer Added Terms and the quantity variation clause up to 25%. Delivery terms start after the original order date and may extend with proper calculation. Pre-dispatch or post-receipt inspection will be conducted as per ATC.
Submit PAN Card copy, GSTIN copy, Cancelled Cheque, EFT Mandate certified by bank, and vendor-code creation materials. Include any OEM authorization if applicable. Ensure all documents reflect current company details and match the tender’s at-issuance conditions to participate.
Delivery period begins after the last date of the original delivery order. If quantity increases, extended time is calculated as (Increased quantity/Original quantity) × Original delivery period, with a minimum extension of 30 days. The purchaser may extend to the original delivery period during option usage.
Inspection can be pre-dispatch at seller premises or post-receipt at the consignee site, depending on ATC and online arrangements. The nominated inspection agency will conduct the checks to ensure conformance before acceptance.
The purchaser reserves the right to increase or decrease the order quantity by up to 25% at the contracted rates, during placement of contract and during the currency of the contract. This requires compliance with the option clause and related delivery adjustments.
While specific standards are not listed, bidders should prepare for military-grade conformity and secure supply chain practices. Ensure documentation supports compliance with typical government military electronics requirements and any OEM authorizations relevant to Cris subsystems.
Final delivery schedule depends on the original delivery order date and any exercised option. The formula for extended delivery time will determine the new timelines, with a minimum 30-day extension when increased quantity is applied.
Prepare PAN, GSTIN, Cancelled Cheque, EFT Mandate, and vendor-code creation materials. Include any required OEM authorizations and technical compliance documents. Ensure all items align with Buyer Added Terms and that the bid reflects the eight BoQ items under procurement.