TenderDekho Logo
Active GEM

South Eastern Coalfields Limited Casing, Rotor, Impeller Parts Tender Korba Chhattisgarh 2026

Bid Publish Date

13-Oct-2026, 6:32 pm

Bid End Date

03-Nov-2026, 7:00 pm

EMD

₹4,381

Value

₹43,61,504

Progress

Issue13-Oct-2026, 6:32 pm
AwardPending

Tender Overview

South Eastern Coalfields Limited (SECL), a Coal India Limited subsidiary, invites bids for the supply of highly specialized power plant and turbine components including casing parts, rotor, impeller, shaft, oil seal, gaskets, and related hardware. The estimated contract value is ₹4,361,504.20 with an EMD of ₹4,381. Location: Korba, Chhattisgarh 495445. Scope is strictly Only supply of Goods across 41 items, with a potential 25% quantity variation during and after contract, at contracted rates. The bidder must comply with OEM authorization, GST and PAN requirements, and provide insurance and bank particulars for EMD/PBG submission. A robust after-sales framework including installation, commissioning, training, and maintenance service capability in India is required. Warranty is 1 year from final acceptance or after commissioning, with OEM warranty certificates to be supplied at delivery. This procurement emphasizes timely delivery within the extended delivery window and compliance with the option clause for delivery extensions.

Technical Specifications & Requirements

  • No tendered technical specifications are published; the items span casing, rotor, impeller, shaft, O rings, gaskets, flexible discs, and related components as listed in the BOQ. The contract requires OEM authorization if bidding through an authorised distributor.
  • Key obligations include: warranty for 1 year, GST compliance with actual rates, EMD ₹4,381 via bank transfer to SECL, and RTGS/online payment arrangements. The scope covers procurement logistics, installation support, and post-sale service network across India. A clear delivery plan aligned to the 30+ day minimum extension rule is expected.

Terms & Eligibility

  • EMD: ₹4,381 via RTGS/online to SECL, Korba.
  • Warranty: 1 year from final acceptance/installation; OEM warranty certificates required at delivery.
  • Delivery: Extended delivery period governed by option clause; minimum 30 days for additional time.
  • Documents: PAN, GSTIN,Cancelled cheque, EFT mandate; OEM authorization if applicable.
  • Payment: GST payable as actuals; reimbursement as per applicable rates; base terms defined by SECL.
  • Warranty/Support: After-sales network in India with service centers near consignee locations must be provided.

Key Specifications

    • Product Categories: Casing, Rotor, Impeller, Shaft, Casing Sleeve, Oil Seal, O Ring Periphery, Plugs, Gaskets, Wadding/Bolts, and related components (as per BOQ item list)
    • Quantity/Value: Estimated contract value ₹4,361,504.20; EMD ₹4,381
    • Standards/Certification: OEM authorization required; 1-year warranty; GST/PAN validation; bank EFT for EMD
    • Delivery & Installation: Delivery window subject to 25% quantity variation; minimum extension rule of 30 days; on-site installation & commissioning support implied by warranty terms

Terms & Conditions

  • Option clause allows ±25% quantity variation at contracted rates

  • Delivery period extended based on last delivery order date; minimum 30 days extension

  • EMD ₹4,381 via RTGS/online; payment terms tied to GST actuals

Important Clauses

Payment Terms

GST payable as actuals; EMD via online transfer; payment to be processed per SECL terms with bank details provided

Delivery Schedule

Delivery shall commence from last date of original delivery order; option clause can extend total duration; minimum 30 days extension for additional time

Penalties/Liquidated Damages

Not explicitly stated; implied performance obligations under warranty and timely delivery

Bidder Eligibility

  • OEM authorization or Manufacturer Authorization required

  • PAN Card, GSTIN, Cancelled Cheque, EFT Mandate

  • Service network and installation/maintenance capability in India

Advertisement

Tender Data

Bid Details

Quantity

226

Category

CASING,PART NO 16

Bid Type

Two Packet Bid

Bid Validity

120 (Days)

Bid Type

Service

Evaluation

Item wise evaluation

Inspection Required

No

Tech Clarification Time

7 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

Yes

Startup Exemption/Relaxation

Yes

Bid Splitting Applied

No

Requirements

Warranty Period

1 years

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

CASING,PART NO 16 , ROTOR,PART NO 23 , IMPELLER,PART NO 9 , SHAFT,PART NO 25 , CASING SLEEVE,PART NO 21 , IMP SLEEVE,PART NO 15 , SHAFT SLEEVE,PART NO 26 , OIL SEAL RS ,PART NO 82 , O W FXO,PART NO 1 , SPHERICAL BUSH,PART NO 5 , O W ADAPTER PLATE,PART NO 6 , I W FXO,PART NO 33 , FLEXIBLE DISC,PART NO 29 , SPHERICAL BUSH,PART NO 32 , I W FXI,PART NO 28 , O RING PERIPHERY,PART NO 85 , PLUG O RING,PART NO 92 , GASKET,PART NO 84 , BASE PLUG,PART NO 1219 , FILLING PLUG,PART NO 1320 , FUSIBLE PLUG,PART NO 14 , DELAY CHAMBER,PART NO 8 , DELAY CHAMBER BOLT and WASHER,PART NO 8687 , COLLER BOLT and WASHER,PART NO 616263 , FX BOLT and SPRING WASHER,PART NO 505152 , FX BOLT and SPRING WASHER,PART NO 727374 , IS BOLT and WASHER,PART NO 5758 , CS BOLT and WASHER,PART NO 6768 , ROTOR BOLT and BAFFLE BOLT,PART NO 6566 , FLEXIBLE DISC,PART NO 2 , OIL SEAL CS ,PART NO 82 , O W FXO OUTPUT FLEX HALF OUTWARD SIDE ,PART NO 1 , FLEXIBLE DISC FOR O W FLEX. COUP.,PART NO 2 , SPHERICAL BUSH FOR O W FLEX. COUP,PART NO 5 , I W FXO OUTPUT FLEX HALF INWARD SIDE,PART NO 33 , I W FLEXIBLE DISC,PART NO 29 , SPHERICAL BUSH FOR I W FLEX. COUP.,PART NO 32 , I W FXI INPUT FLEX HALF INWARD SIDE ,PART NO 28

Advisory Bank

State Bank of India

ePBG Percentage

5%

ePBG Duration (Months)

5

Payment Timelines

Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

90

Delivery Locations

1

Delivery Cities

Korba

Delivery Pincodes

495452

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Tarun Kumar Pandey495452,Dipka Area SECL ,PO- Dipka, Dist-Korba, CHHATTISGARH-495452, IndiaKorbaChhattisgarh495452290-

Authority Records

MINISTRY OF COALCOAL INDIA LIMITED

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9928784.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Office Name

Secl Bilaspur Chhattisgarh

Grievance Contact

[email protected]

Bill of Quantities (BOQ) 41 Items Sign in for GEM prices

#1

CASING,PART NO 16

CASING,PART NO 16

2 ea Delivery: 90 days
#2

ROTOR,PART NO 23

ROTOR,PART NO 23

2 ea Delivery: 90 days
#3

IMPELLER,PART NO 9

IMPELLER,PART NO 9

2 ea Delivery: 90 days
#4

SHAFT,PART NO 25

SHAFT,PART NO 25

2 ea Delivery: 90 days
#5

CASING SLEEVE,PART NO 21

CASING SLEEVE,PART NO 21

2 ea Delivery: 90 days
#6

IMP SLEEVE,PART NO 15

IMP SLEEVE,PART NO 15

2 ea Delivery: 90 days
#7

SHAFT SLEEVE,PART NO 26

SHAFT SLEEVE,PART NO 26

2 ea Delivery: 90 days
#8

OIL SEAL RS ,PART NO 82

OIL SEAL RS ,PART NO 82

4 ea Delivery: 90 days
#9

O W FXO,PART NO 1

O W FXO,PART NO 1

2 ea Delivery: 90 days
#10

SPHERICAL BUSH,PART NO 5

SPHERICAL BUSH,PART NO 5

2 ea Delivery: 90 days
#11

O W ADAPTER PLATE,PART NO 6

O W ADAPTER PLATE,PART NO 6

2 ea Delivery: 90 days
#12

I W FXO,PART NO 33

I W FXO,PART NO 33

2 ea Delivery: 90 days
#13

FLEXIBLE DISC,PART NO 29

FLEXIBLE DISC,PART NO 29

2 ea Delivery: 90 days
#14

SPHERICAL BUSH,PART NO 32

SPHERICAL BUSH,PART NO 32

2 ea Delivery: 90 days
#15

I W FXI,PART NO 28

I W FXI,PART NO 28

2 ea Delivery: 90 days
#16

O RING PERIPHERY,PART NO 85

O RING PERIPHERY,PART NO 85

4 ea Delivery: 90 days
#17

PLUG O RING,PART NO 92

PLUG O RING,PART NO 92

4 ea Delivery: 90 days
#18

GASKET,PART NO 84

GASKET,PART NO 84

4 ea Delivery: 90 days
#19

BASE PLUG,PART NO 1219

BASE PLUG,PART NO 1219

4 ea Delivery: 90 days
#20

FILLING PLUG,PART NO 1320

FILLING PLUG,PART NO 1320

4 ea Delivery: 90 days
#21

FUSIBLE PLUG,PART NO 14

FUSIBLE PLUG,PART NO 14

4 ea Delivery: 90 days
#22

DELAY CHAMBER,PART NO 8

DELAY CHAMBER,PART NO 8

2 ea Delivery: 90 days
#23

DELAY CHAMBER BOLT and WASHER,PART NO 8687

DELAY CHAMBER BOLT and WASHER,PART NO 8687

2 ea Delivery: 90 days
#24

COLLER BOLT and WASHER,PART NO 616263

COLLER BOLT and WASHER,PART NO 616263

8 ea Delivery: 90 days
#25

FX BOLT and SPRING WASHER,PART NO 505152

FX BOLT and SPRING WASHER,PART NO 505152

8 ea Delivery: 90 days
#26

FX BOLT and SPRING WASHER,PART NO 727374

FX BOLT and SPRING WASHER,PART NO 727374

8 ea Delivery: 90 days
#27

IS BOLT and WASHER,PART NO 5758

IS BOLT and WASHER,PART NO 5758

8 ea Delivery: 90 days
#28

CS BOLT and WASHER,PART NO 6768

CS BOLT and WASHER,PART NO 6768

8 ea Delivery: 90 days
#29

ROTOR BOLT and BAFFLE BOLT,PART NO 6566

ROTOR BOLT and BAFFLE BOLT,PART NO 6566

8 ea Delivery: 90 days
#30

FLEXIBLE DISC,PART NO 2

FLEXIBLE DISC,PART NO 2

2 ea Delivery: 90 days
#31

CASING,PART NO 16

CASING,PART NO 16

8 ea Delivery: 90 days
#32

ROTOR,PART NO 23

ROTOR,PART NO 23

12 ea Delivery: 90 days
#33

IMPELLER,PART NO 9

IMPELLER,PART NO 9

12 ea Delivery: 90 days
#34

OIL SEAL CS ,PART NO 82

OIL SEAL CS ,PART NO 82

20 ea Delivery: 90 days
#35

O W FXO OUTPUT FLEX HALF OUTWARD SIDE ,PART NO 1

O W FXO OUTPUT FLEX HALF OUTWARD SIDE ,PART NO 1

8 ea Delivery: 90 days
#36

FLEXIBLE DISC FOR O W FLEX. COUP.,PART NO 2

FLEXIBLE DISC FOR O W FLEX. COUP.,PART NO 2

12 ea Delivery: 90 days
#37

SPHERICAL BUSH FOR O W FLEX. COUP,PART NO 5

SPHERICAL BUSH FOR O W FLEX. COUP,PART NO 5

10 ea Delivery: 90 days
#38

I W FXO OUTPUT FLEX HALF INWARD SIDE,PART NO 33

I W FXO OUTPUT FLEX HALF INWARD SIDE,PART NO 33

8 ea Delivery: 90 days
#39

I W FLEXIBLE DISC,PART NO 29

I W FLEXIBLE DISC,PART NO 29

12 ea Delivery: 90 days
#40

SPHERICAL BUSH FOR I W FLEX. COUP.,PART NO 32

SPHERICAL BUSH FOR I W FLEX. COUP.,PART NO 32

6 ea Delivery: 90 days
#41

I W FXI INPUT FLEX HALF INWARD SIDE ,PART NO 28

I W FXI INPUT FLEX HALF INWARD SIDE ,PART NO 28

8 ea Delivery: 90 days
Advertisement

Categories 32

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Copy of PAN Card

2

Copy of GSTIN

3

Copy of Cancelled Cheque

4

Copy of EFT Mandate certified by Bank

5

OEM Authorization or Manufacturer Authorization if bidding through distributor

6

Warranty certificates from OEM

7

Evidence of installation, commissioning capability and after-sales service network in India

8

GST compliance details and bank payment details for EMD

Frequently Asked Questions

Key insights about CHHATTISGARH tender market

How to bid for SECL Korba casing rotor impeller tender 2026

Bidders must submit PAN, GSTIN, cancelled cheque, EFT mandate, and OEM authorization if bidding via distributor. Include 1-year warranty commitment, OEM warranty certificates, and service network details. EMD ₹4,381 must be paid online to SECL, with bid submitted through the GEM portal before the due date.

What documents are required for SECL Korba procurement bid 2026

Required documents include PAN, GSTIN, cancelled cheque, EFT mandate, OEM authorization, OEM warranty certificates, and evidence of installation/maintenance capability in India. Also provide GST details, bank payment proofs for EMD, and service center locations near consignee sites.

What are the delivery terms for SECL Korba power component tender

Delivery terms allow a 25% quantity variation at contract signing and during currency, with delivery extension calculated as (additional/original) × original delivery period, minimum 30 days. Delivery starts after the last original delivery order date.

What warranty is required for SECL supplier of turbine parts

Warranty period is 1 year from final acceptance or post-installation testing. OEM warranty certificates must accompany delivery, and the seller must maintain an established after-sales network with service centers near consignee locations.

What is the EMD amount for SECL Korba bidding

EMD amount is ₹4,381, payable via RTGS/online transfer to the SECL Korba account: SBI, GEVRA PROJECT, account no. 11061939731, IFSC SBIN0009343. Include bid number and bidder name in payment reference.

Which standards or certifications are needed for SECL component tender

At minimum, OEM authorization and warranty compliance are required. Ensure GST/PAN validity, and provide OEM warranty certificates. No specific IS/ISO standard is listed in the available data, but after-sales service capability in India is essential.

What is the estimated contract value and item scope for this SECL tender

Estimated value is ₹4,361,504.20 for 41 items including casing, rotor, impeller, shaft, oil seals, gaskets, and related components. The scope is strictly Only supply of Goods, with 25% quantity variation permitted.

How to verify GST applicability for SECL Korba procurement 2026

Bidders must self-verify GST applicability and rates; SECL will reimburse GST as actuals up to quoted rate. Ensure GSTIN is active and matching the bidder’s PAN and bank details for EMD payment.

Advertisement