NLC India Limited Spray Nozzles Replacement Tender Cuddalore Tamil Nadu 2026 ISI/ISO compliant

Bid Publish Date

07-Sep-2026, 6:25 pm

Bid End Date

17-Oct-2026, 9:00 am

Generate Docs

Progress

Issue07-Sep-2026, 6:25 pm
Corrigendum13-Oct-2026
AwardPending

Key Highlights

  • • Spray nozzles replacement in cooling towers at Cuddalore facility
  • • 25% quantity option amendment during contract and currency
  • • OEM warranty certificates required at delivery
  • • Installation, commissioning, training, troubleshooting and maintenance service presence in INDIA

Tender Overview

Organization: NLC India Limited. Product/Service: Spray nozzles replacement in cooling towers. Location: CUDDALORE, TAMIL NADU - 605106. Category: SPRAY NOZZLES REPLACEMENT IN COOLING TOWERS. Scope is limited to the supply of goods for replacement; no BOQ quantity given. Unique terms include an option to increase/decrease quantity by up to 25% at contracted rates and an extended delivery timeline based on the formula provided. Emphasizes OEM warranty submission at delivery and local service capability. No start/end dates or estimated value disclosed. This tender targets suppliers capable of providing ready-to-install spray nozzles with nationwide service support. The emphasis on installation/training/maintenance readiness is noted in the warranty clause. Vendors should align with the option clause and ensure timely deliveries against contract quantities. The opportunity requires standard after-sales support infrastructure within INDIA.

Technical Specifications & Requirements

  • Product category: Spray nozzles for cooling towers replacement
  • Delivery scope: Only supply ofGoods (as per scope of supply) with OEM warranty documentation
  • Warranty: OEM warranty certificates to be submitted at delivery; warranty period as per specifications from final acceptance or after installation
  • Service network: Demonstrated installation, commissioning, training, troubleshooting and maintenance capabilities; service centres near consignee locations must be uploaded
  • Standards/Compliance: Not specified in tender data; bidders should prepare to submit standard OEM certifications with delivery
  • Eligibility context: Successful bidders must provide service support and rectify breakdowns during warranty; detailed support network required
  • Delivery terms: Option to extend delivery period proportional to quantity changes; minimum 30 days in extended period
  • Pricing: Bid price to include all cost components for supply of goods

Terms, Conditions & Eligibility

  • EMD/Security: Not specified in tender data; bidders should assume standard EMD requirements per organization policy
  • Delivery timeline: Delivery period linked to original delivery date with option-based extensions; minimum 30 days in extended time
  • Warranty: OEM warranty certificates required; service network details to be uploaded
  • Experience: Demonstrated capability for supplying cooling-tower spray nozzles and after-sales service in INDIA
  • Documentation: OEM authorizations, technical compliance certificates, and service-center details to be submitted with bid
  • Payment terms: Not specified; bidders should prepare for standard milestone or COD terms per NLC policy

Key Specifications

  • Product: spray nozzles for cooling towers

  • Scope: supply of goods only, installation may be covered under separate terms

  • Warranty: OEM warranty certificates at delivery, warranty period per final acceptance

  • Service capability: installation, commissioning, training, troubleshooting, and maintenance in INDIA

  • Delivery flexibility: option to increase/decrease quantity by up to 25% with corresponding delivery time adjustment

Terms & Conditions

  • Option clause allows ±25% quantity variance with contract rate protections

  • OEM warranty certificates mandatory at delivery; service network details required

  • Delivery timelines adjust with quantity changes; minimum 30 days for extended period

Important Clauses

Payment Terms

Not specified in tender data; bidders should anticipate standard supplier payments per NLC policy

Delivery Schedule

Delivery period to commence from the last date of original delivery order; extended period formula provided with minimum 30 days

Penalties/Liquidated Damages

Not specified in tender data; bidders should review contract terms for LD provisions

Bidder Eligibility

  • Experience in supplying cooling-tower spray nozzles or equivalent industrial fluid handling components

  • Demonstrated OEM authorization or ability to source from OEMs with warranty

  • Presence of service centers or ability to deploy maintenance support across INDIA

Advertisement

Tender Data

Bid Details

Quantity

10000

Bid Type

Two Packet Bid

Bid Validity

120 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

Yes

RA Qualification Rule

50% Lowest Priced Technically Qualified Bidders

Tech Clarification Time

5 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

ST030110031 SPRAY NOZZLES REPLACEMENT IN COOLING TOWERS

Advisory Bank

State Bank of India

ePBG Percentage

5%

ePBG Duration (Months)

23

Payment Timelines

Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

5000

Delivery Locations

1

Delivery Cities

Cuddalore

Delivery Pincodes

607807

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Krishnaveliah Subbiah607807,SUB STORES, THERMAL POWER STATION-I EXPANSION, NLC INDIA LIMITED, NEYVELI 607807, Cuddalore DistrictCuddaloreTamil Nadu607807-5000-

Authority Records

MINISTRY OF COAL

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 3

GeM-Bidding-9852423.pdf

Main Document

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

Nlc India Limited

Department

Materials Management

Office Name

Materials Management

Grievance Contact

[email protected]

Corrigendum Updates

1 Update
#1

Update

13-Oct-2026

Extended Deadline

17-Oct-2026, 3:30 am

Opening Date

18-Oct-2026, 3:30 am

Advertisement

Categories 3

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST certificate

2

PAN card

3

Experience certificates relevant to cooling-tower nozzle replacement

4

Financial statements or turnover proof

5

EMD/Security deposit documentation per policy

6

OEM authorization / manufacturer authorization

7

Technical compliance certificates (OEM standards/certifications)

8

Service-centre details near consignee destinations

Frequently Asked Questions

Key insights about TAMIL NADU tender market

How to bid for spray nozzle replacement tender in Cuddalore Tamil Nadu 2026

Bidders should prepare OEM authorization, GST, PAN, experience certificates, financials, and EM D documentation, along with OEM warranty proofs. Ensure compliance with service-center requirements and readiness for installation, commissioning, and maintenance in INDIA. Review option clause permitting 25% quantity variations and plan delivery accordingly.

What documents are required for NLC cooling tower nozzle tender in Tamil Nadu

Submit GST certificate, PAN card, experience certificates for cooling-tower components, financial statements, EMD documentation, OEM authorization, and technical compliance certificates. Include service-center details near consignee destinations and OEM warranty certificates at delivery.

What are the technical specifications for spray nozzles replacement in cooling towers

Tender data lists spray nozzles for cooling towers with no explicit dimensions; vendors must provide OEM grade nozzles, installation-ready, and certify compliance with OEM standards. Include warranty certificates and service capability for installation, commissioning, and maintenance within INDIA.

When is the delivery milestone for this NLC tender in Tamil Nadu

Delivery period starts from the last date of the original delivery order; extended delivery time applies if quantity varies (Extended time = (Increased quantity ÷ Original quantity) × Original delivery period) with a minimum of 30 days.

What are the EMD and payment terms for the NLC nozzle tender

EMD is not specified in the tender data; bidders should expect standard EMD requirements per NLC policy. Payment terms are not detailed; bidders should anticipate milestones aligned with delivery and acceptance per organization policy.

What after-sales support is required for this spray nozzle procurement

Bidder must demonstrate installation, commissioning, training, troubleshooting, and maintenance capability within INDIA. Service centre details must be uploaded near consignee destinations, and OEM warranty certificates must be provided at delivery.

How does the 25% option clause affect contract quantity

The purchaser can increase/decrease quantity up to 25% at contracted rates during placement, and up to 25% during the contract currency, with delivery time adjusted proportionally to the extended period, minimum 30 days.

What standards or certifications are required for spray nozzle suppliers in this tender

The tender specifies OEM warranty and service capabilities; explicit ISI/ISO standards are not listed. Vendors should provide OEM certifications and compliance documentation with bid and ensure service-network readiness across INDIA.