Bid Publish Date
08-Oct-2025, 12:34 pm
Bid End Date
20-Oct-2025, 12:00 pm
EMD
₹1,20,000
Value
₹24,15,138
Location
Progress
RAQuantity
2512
Category
9 layer acrylic synthetic flooring for Volleyball Court
Bid Type
Two Packet Bid
Indian Air Force invites bids for Demolishing existing synthetic turf system for Volleyball Court, Asphalt Sub Base Specification for Volleyball Court, Raising height of existing toe wall upto the required level for Volleyball Court, 9 layer acrylic synthetic flooring for Volleyball Court, Volleyball pole model with adjustable height with net wire and Volleyball Net, Dismantling of Existing surface for Basketball Court, Asphalt sub base specification for Basketball Court, Raising the existing drain to toe wall brick work as per the required level to match the surface level of the ground with all edges and corner as per the gradient for Basketball Court, Removing or changing ms flat drain cover and cleaning of rust and painting for the same and reinstall the drain cover as per the requirement, Basketball poles reinstallation, 8 layer acrylic flooring for Basketball Court in CENTRAL DELHI, DELHI. Quantity: 2512. Submission Deadline: 20-10-2025 12: 00: 00. Submit your proposal before the deadline.
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Demolishing existing synthetic turf system for Volleyball Court , Asphalt Sub Base Specification for Volleyball Court , Raising height of existing toe wall upto the required level for Volleyball Court , 9 layer acrylic synthetic flooring for Volleyball Court , Volleyball pole model with adjustable height with net wire and Volleyball Net , Dismantling of Existing surface for Basketball Court , Asphalt sub base specification for Basketball Court , Raising the existing drain to toe wall brick work as per the required level to match the surface level of the ground with all edges and corner as per the gradient for Basketball Court , Removing or changing ms flat drain cover and cleaning of rust and painting for the same and reinstall the drain cover as per the requirement , Basketball poles reinstallation , 8 layer acrylic flooring for Basketball Court
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Demolishing existing synthetic turf system for Volleyball Court
Resurfacing of Volleyball Court
Asphalt Sub Base Specification for Volleyball Court
Resurfacing of Volleyball Court
Raising height of existing toe wall upto the required level for Volleyball Court
Resurfacing of Volleyball Court
9 layer acrylic synthetic flooring for Volleyball Court
Resurfacing of Volleyball Court
Volleyball pole model with adjustable height with net wire and Volleyball Net
Resurfacing of Volleyball Court
Dismantling of Existing surface for Basketball Court
Demolishing existing PU based on cushioned system manyally by mechanical means and disposal of material within 50 m lead
Asphalt sub base specification for Basketball Court
Asphalt base for recreational surface Hot mix asphalt surfaces are a very important part of todays recreatinoal surfacing industry.
Raising the existing drain to toe wall brick work as per the required level to match the surface level of the ground with all edges and corner as per the gradient for Basketball Court
Brick work with common burnt clay FPS bricks of class designation 7 to 5 in foundation and plinth in cement mortar 1 to4(1 Cement and 4 Coarse sand)
Removing or changing ms flat drain cover and cleaning of rust and painting for the same and reinstall the drain cover as per the requirement
Removing existing MS flat drain cover, including cleaning and removing rust from the steel surface using emery paper, applying a priming coat with ready-mixed red oxide zinc chromate primer and painting with synthetic enamal paint of approved brand and manufacture of required color to give an even shade galvanized iron/steel works and reinstalling the same.
Basketball poles reinstallation
Dismantle and reinstallation of the same basketball poles to match the required height and levels as per the standard
8 layer acrylic flooring for Basketball Court
ITF approved 8 layers acrylic sports flooring systems.
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Demolishing existing synthetic turf system for Volleyball Court | Resurfacing of Volleyball Court | 244 | sq mtr | afnd@spteamadm | 30 | |
| 2 | Asphalt Sub Base Specification for Volleyball Court | Resurfacing of Volleyball Court | 244 | sq mtr | afnd@spteamadm | 30 | |
| 3 | Raising height of existing toe wall upto the required level for Volleyball Court | Resurfacing of Volleyball Court | 66 | rmt | afnd@spteamadm | 30 | |
| 4 | 9 layer acrylic synthetic flooring for Volleyball Court | Resurfacing of Volleyball Court | 244 | sq mtr | afnd@spteamadm | 30 | |
| 5 | Volleyball pole model with adjustable height with net wire and Volleyball Net | Resurfacing of Volleyball Court | 1 | per pair | afnd@spteamadm | 30 | |
| 6 | Dismantling of Existing surface for Basketball Court | Demolishing existing PU based on cushioned system manyally by mechanical means and disposal of material within 50 m lead | 528 | sqm | afnd@spteamadm | 30 | |
| 7 | Asphalt sub base specification for Basketball Court | Asphalt base for recreational surface Hot mix asphalt surfaces are a very important part of todays recreatinoal surfacing industry. | 519 | sqm | afnd@spteamadm | 30 | |
| 8 | Raising the existing drain to toe wall brick work as per the required level to match the surface level of the ground with all edges and corner as per the gradient for Basketball Court | Brick work with common burnt clay FPS bricks of class designation 7 to 5 in foundation and plinth in cement mortar 1 to4(1 Cement and 4 Coarse sand) | 96 | rmt | afnd@spteamadm | 30 | |
| 9 | Removing or changing ms flat drain cover and cleaning of rust and painting for the same and reinstall the drain cover as per the requirement | Removing existing MS flat drain cover, including cleaning and removing rust from the steel surface using emery paper, applying a priming coat with ready-mixed red oxide zinc chromate primer and painting with synthetic enamal paint of approved brand and manufacture of required color to give an even shade galvanized iron/steel works and reinstalling the same. | 41 | sqm | afnd@spteamadm | 30 | |
| 10 | Basketball poles reinstallation | Dismantle and reinstallation of the same basketball poles to match the required height and levels as per the standard | 1 | pair | afnd@spteamadm | 30 | |
| 11 | 8 layer acrylic flooring for Basketball Court | ITF approved 8 layers acrylic sports flooring systems. | 528 | sqm | afnd@spteamadm | 30 |
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
OEM Annual Turnover
Additional Doc 1 (Requested in ATC)
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Start
04-Jan-2026, 2:00 pm
End
05-Jan-2026, 2:00 pm
Duration: 24 hours
Reverse Auction Document
✅ RA concluded. Check financial results for final rankings.
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | ARSH ENTERPRISES SPORTS WORK Under PMA | - | 16-10-2025 14:35:52 | |
| 2 | DECOTARF SPORTS Under PMA | - | 19-10-2025 15:11:41 | |
| 3 | FRIENDS AND COMPANY Under PMA | - | 17-10-2025 15:00:33 | |
| 4 | IMPEX SOLUTIONS Under PMA | - | 19-10-2025 13:14:48 | |
| 5 | Kalinga Trading Corporation Under PMA | - | 19-10-2025 14:13:12 | |
| 6 | KAVYA ENTERPRISES Under PMA | - | 18-10-2025 22:21:45 | |
| 7 | KHALSA EXPORTS PRIVATE LIMITED Under PMA | - | 18-10-2025 11:38:20 | |
| 8 | M/S DESAN INTERNATIONAL Under PMA | - | 16-10-2025 11:30:01 | |
| 9 | M/S HIMANSHU ENTERPRISES Under PMA | - | 17-10-2025 15:30:48 | |
| 10 | N.K & BROTHERS Under PMA | - | 16-10-2025 17:53:25 | |
| 11 | STURDY INTERNATIONAL Under PMA | - | 20-10-2025 00:13:23 | |
| 12 | SUMMIT Under PMA | - | 17-10-2025 12:17:51 | |
| 13 | TASHI ENTERPRISES Under PMA | - | 19-10-2025 11:22:17 | |
| 14 | Vanaspati Enterprises Under PMA | - | 17-10-2025 11:58:33 | |
| 15 | Wincourt Sports Under PMA | - | 20-10-2025 08:09:01 | |
| 16 | YUVANSHI TRADING CO Under PMA | - | 17-10-2025 12:42:00 |
These are the final prices after the reverse auction event. Prices may be lower than initial bids.
| Rank | Seller | Final Price | Item |
|---|---|---|---|
| L1 | YUVANSHI TRADING CO(MSE,MII) Under PMA Winner | ₹14,12,300 | Item Categories : Demolishing existing synthetic turf system for Volleyball Court,Asphalt Sub Base Specification for |
| L2 | M/S HIMANSHU ENTERPRISES (MSE,MII) Under PMA | ₹14,17,420 | Item Categories : Demolishing existing synthetic turf system for Volleyball Court,Asphalt Sub Base Specification for |
| L3 | IMPEX SOLUTIONS (MSE,MII) Under PMA | ₹14,81,880 | Item Categories : Demolishing existing synthetic turf system for Volleyball Court,Asphalt Sub Base Specification for |
| L4 | N.K & BROTHERS (MSE,MII) Under PMA | ₹15,08,980 | Item Categories : Demolishing existing synthetic turf system for Volleyball Court,Asphalt Sub Base Specification for |
| L5 | Vanaspati Enterprises (MSE,MII) Under PMA | ₹19,94,200 | Item Categories : Demolishing existing synthetic turf system for Volleyball Court,Asphalt Sub Base Specification for |
| L6 | M/S DESAN INTERNATIONAL (MSE,MII) Under PMA | ₹21,78,905 | Item Categories : Demolishing existing synthetic turf system for Volleyball Court,Asphalt Sub Base Specification for |
| L7 | Kalinga Trading Corporation (MSE,MII) Under PMA | ₹22,10,610 | Item Categories : Demolishing existing synthetic turf system for Volleyball Court,Asphalt Sub Base Specification for |
| L8 | TASHI ENTERPRISES (MII) Under PMA | ₹22,59,520 | Item Categories : Demolishing existing synthetic turf system for Volleyball Court,Asphalt Sub Base Specification for |
🎉 L1 Winner
YUVANSHI TRADING CO(MSE,MII) Under PMA
Final Price: ₹14,12,300