Procurement Opportunity: Supply of NVIDIA Jetson Orin NX 16GB Module with Eagle 201 Full System as per RFP specifications,Su in GURGAON, HARYANA

Bid Publish Date

01-Jul-2026, 10:39 am

Bid End Date

16-Jul-2026, 11:00 am

EMD

₹45,000

Progress

Issue01-Jul-2026, 10:39 am
AwardPending
Explore all 6 tabs to view complete tender details

Quantity

28

Category

Supply of FPOE Layer 3 switch controller compatible PoE switch with 24 x GE RJ45 ports 4 x 10 GE SFP with automatic Max 421W POE output limit

Bid Type

Two Packet Bid

Categories 58

N/a invites bids for Supply of NVIDIA Jetson Orin NX 16GB Module with Eagle 201 Full System as per RFP specifications, Supply of High performance 512GB NVMe Solid State Drive SSD utilizing PCIe interface for ultra fast data transfer as per RFP specifications, Supply of Online Double Conversion UPS of 1 kVA capacity with inbuilt external battery bank providing a minimum 30 minute backup as per RFP specifications, Supply of Indoor Wireless AP Tri radio Wi Fi 6E IEEE 802. 11ax Tri band 2. 4 5 6GHz and dual 5G operational as per RFP specifications, Supply of FPOE Layer 3 switch controller compatible PoE switch with 24 x GE RJ45 ports 4 x 10 GE SFP with automatic Max 421W POE output limit, Supply of Rugged IP65 rated industrial enclosure with integrated cooling fan providing protection against dust water ingress and harsh environmental conditions for housed equipment, Supply of Wireless LAN Controller 5x GE RJ45 ports including 4x Internal Ports 1x WAN Ports, Supply of 10 Gigabit SFP transceiver modules for high speed fiber copper network connectivity ensuring reliable low latency data communication between nodes and network switches, Supply of Active cooling kit comprising aluminum heatsink integrated cooling fan and high conductivity thermal pads for efficient heat dissipation and sustained performance of M. 2 NVMe SSDs, Supply of High Speed 10G Ethernet UTP 500MHz Class EA LSZH Cable C6A 305 m rolls, Supply of Floor Mount Rack, 600x800mm Front Perforated Door and Rear Single Perforated doors 4x Fans 2x Vertical PDU 12 S oc 515A with 16A MCB Indicator Mounting Hardware EarthingKit 27U, Supply of Intelligent 32A rack- mounted Power Distribution Unit PDU with 12 outlets providing real time power monitoring load management and reliable power distribution for IT equipment, Supply of Misc Cable Trays Conduit pipe Casing capping Flexible Pipe etc, Supply of Miscellaneous items connectors mounts ties Patch Cord etc, Complete Node Assembly Installation Testing Burning Commissioning of above items in GURGAON, HARYANA. Quantity: 28. Submission Deadline: 16-07-2026 11: 00: 00. Submit your proposal before the deadline.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

Supply of NVIDIA Jetson Orin NX 16GB Module with Eagle 201 Full System as per RFP specifications , Supply of High performance 512GB NVMe Solid State Drive SSD utilizing PCIe interface for ultra fast data transfer as per RFP specifications , Supply of Online Double Conversion UPS of 1 kVA capacity with inbuilt external battery bank providing a minimum 30 minute backup as per RFP specifications , Supply of Indoor Wireless AP Tri radio Wi Fi 6E IEEE 802.11ax Tri band 2.4 5 6GHz and dual 5G operational as per RFP specifications , Supply of FPOE Layer 3 switch controller compatible PoE switch with 24 x GE RJ45 ports 4 x 10 GE SFP with automatic Max 421W POE output limit , Supply of Rugged IP65 rated industrial enclosure with integrated cooling fan providing protection against dust water ingress and harsh environmental conditions for housed equipment , Supply of Wireless LAN Controller 5x GE RJ45 ports including 4x Internal Ports 1x WAN Ports , Supply of 10 Gigabit SFP transceiver modules for high speed fiber copper network connectivity ensuring reliable low latency data communication between nodes and network switches , Supply of Active cooling kit comprising aluminum heatsink integrated cooling fan and high conductivity thermal pads for efficient heat dissipation and sustained performance of M.2 NVMe SSDs , Supply of High Speed 10G Ethernet UTP 500MHz Class EA LSZH Cable C6A 305 m rolls , Supply of Floor Mount Rack, 600x800mm Front Perforated Door and Rear Single Perforated doors 4x Fans 2x Vertical PDU 12 S oc 515A with 16A MCB Indicator Mounting Hardware EarthingKit 27U , Supply of Intelligent 32A rack- mounted Power Distribution Unit PDU with 12 outlets providing real time power monitoring load management and reliable power distribution for IT equipment , Supply of Misc Cable Trays Conduit pipe Casing capping Flexible Pipe etc , Supply of Miscellaneous items connectors mounts ties Patch Cord etc , Complete Node Assembly Installation Testing Burning Commissioning of above items

Advisory Bank

AXIS BANK LTD

Delivery Details

Max Delivery Days

45

Delivery Locations

1

Delivery Cities

Gurugram

Delivery Pincodes

122001

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Mahender Singh122001,GTPL Building C1, Infocity, Sector 34 GurugramGurugramHaryana122001245-

Authority Records

GENERAL ADMINISTRATION AND ADMINISTRATIVE REFORMS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9490926.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 15 Items Sign in for GEM prices

#1

Supply of NVIDIA Jetson Orin NX 16GB Module with Eagle 201 Full System as per RFP specifications

Supply of NVIDIA Jetson Orin NX 16GB Module with Eagle 201 Full System as per RFP specifications

2 nos Delivery: 45 days
#2

Supply of High performance 512GB NVMe Solid State Drive SSD utilizing PCIe interface for ultra fast data transfer as per RFP specifications

Supply of High performance 512GB NVMe Solid State Drive SSD utilizing PCIe interface for ultra fast data transfer as per RFP specifications

2 nos Delivery: 45 days
#3

Supply of Online Double Conversion UPS of 1 kVA capacity with inbuilt external battery bank providing a minimum 30 minute backup as per RFP specifications

Supply of Online Double Conversion UPS of 1 kVA capacity with inbuilt external battery bank providing a minimum 30 minute backup as per RFP specifications

2 nos Delivery: 45 days
#4

Supply of Indoor Wireless AP Tri radio Wi Fi 6E IEEE 802.11ax Tri band 2.4 5 6GHz and dual 5G operational as per RFP specifications

Supply of Indoor Wireless AP Tri radio Wi Fi 6E IEEE 802.11ax Tri band 2.4 5 6GHz and dual 5G operational as per RFP specifications

2 nos Delivery: 45 days
#5

Supply of FPOE Layer 3 switch controller compatible PoE switch with 24 x GE RJ45 ports 4 x 10 GE SFP with automatic Max 421W POE output limit

Supply of FPOE Layer 3 switch controller compatible PoE switch with 24 x GE RJ45 ports 4 x 10 GE SFP with automatic Max 421W POE output limit

2 nos Delivery: 45 days
#6

Supply of Rugged IP65 rated industrial enclosure with integrated cooling fan providing protection against dust water ingress and harsh environmental conditions for housed equipment

Supply of Rugged IP65 rated industrial enclosure with integrated cooling fan providing protection against dust water ingress and harsh environmental conditions for housed equipment

1 nos Delivery: 45 days
#7

Supply of Wireless LAN Controller 5x GE RJ45 ports including 4x Internal Ports 1x WAN Ports

Supply of Wireless LAN Controller 5x GE RJ45 ports including 4x Internal Ports 1x WAN Ports

2 nos Delivery: 45 days
#8

Supply of 10 Gigabit SFP transceiver modules for high speed fiber copper network connectivity ensuring reliable low latency data communication between nodes and network switches

Supply of 10 Gigabit SFP transceiver modules for high speed fiber copper network connectivity ensuring reliable low latency data communication between nodes and network switches

4 nos Delivery: 45 days
#9

Supply of Active cooling kit comprising aluminum heatsink integrated cooling fan and high conductivity thermal pads for efficient heat dissipation and sustained performance of M.2 NVMe SSDs

Supply of Active cooling kit comprising aluminum heatsink integrated cooling fan and high conductivity thermal pads for efficient heat dissipation and sustained performance of M.2 NVMe SSDs

2 set Delivery: 45 days
#10

Supply of High Speed 10G Ethernet UTP 500MHz Class EA LSZH Cable C6A 305 m rolls

Supply of High Speed 10G Ethernet UTP 500MHz Class EA LSZH Cable C6A 305 m rolls

2 box Delivery: 45 days
#11

Supply of Floor Mount Rack, 600x800mm Front Perforated Door and Rear Single Perforated doors 4x Fans 2x Vertical PDU 12 S oc 515A with 16A MCB Indicator Mounting Hardware EarthingKit 27U

Supply of Floor Mount Rack, 600x800mm Front Perforated Door and Rear Single Perforated doors 4x Fans 2x Vertical PDU 12 S oc 515A with 16A MCB Indicator Mounting Hardware EarthingKit 27U

1 nos Delivery: 45 days
#12

Supply of Intelligent 32A rack-mounted Power Distribution Unit PDU with 12 outlets providing real time power monitoring load management and reliable power distribution for IT equipment

Supply of Intelligent 32A rack-mounted Power Distribution Unit PDU with 12 outlets providing real time power monitoring load management and reliable power distribution for IT equipment

2 nos Delivery: 45 days
#13

Supply of Misc Cable Trays Conduit pipe Casing capping Flexible Pipe etc

Supply of Misc Cable Trays Conduit pipe Casing capping Flexible Pipe etc

1 lot Delivery: 45 days
#14

Supply of Miscellaneous items connectors mounts ties Patch Cord etc

Supply of Miscellaneous items connectors mounts ties Patch Cord etc

2 set Delivery: 45 days
#15

Complete Node Assembly Installation Testing Burning Commissioning of above items

Complete Node Assembly Installation Testing Burnin Commissioning of above items

1 lot Delivery: 60 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

OEM Annual Turnover

7

Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria

8

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer